Difference between revisions of "Huntington Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (2 intermediate revisions by the same user not shown) | |||
| Line 10: | Line 10: | ||
=== Description ===  | === Description ===  | ||
| + | * The field is no longer in production  | ||
* The Huntington Field was a subsea development located in block 22/14b in the Central North Sea, 230km east-northeast of Aberdeen, in a water depth of approximately 89 metres. The Field was tied back to the [[Voyageur Spirit FPSO]], where produced fluids were processed.    | * The Huntington Field was a subsea development located in block 22/14b in the Central North Sea, 230km east-northeast of Aberdeen, in a water depth of approximately 89 metres. The Field was tied back to the [[Voyageur Spirit FPSO]], where produced fluids were processed.    | ||
* Gas was used for gas lift, fuel and exported to the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]].    | * Gas was used for gas lift, fuel and exported to the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]].    | ||
| Line 16: | Line 17: | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | * '''Wood Group:''' Five year operations and maintenance contract to provide asset management services for the FPSO  | 
| − | *   | + | * '''Xodus:''' FEED study  | 
| − | *   | + | * '''Subsea 7:''' Installation of 12km of the 8-inch Gas Export pipeline, installation of infield flexible flowlines, main static umbilical and associated risers as well as installation of subsea structures followed by tie-ins, pre-commissioning and system testing.  | 
| − | *   | + | * '''Sevan Marine:''' FPSO Voyageur Spirit upgrade  | 
=== History ===  | === History ===  | ||
| Line 31: | Line 32: | ||
* 2016 - Premier Oil acquired EON's share  | * 2016 - Premier Oil acquired EON's share  | ||
* 2020 - The field was shut down  | * 2020 - The field was shut down  | ||
| − | * 2021 -    | + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | 
| + | * 2021 - Approval granted for decommissioning  | ||
=== Geology ===  | === Geology ===  | ||
| Line 37: | Line 39: | ||
=== Links ===  | === Links ===  | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]]  | ||
# [[CIMC Raffles FPSO References]]  | # [[CIMC Raffles FPSO References]]  | ||
# [http://www.eon.com/en/business-areas/gas-supply-and-production/exploration-and-production/united-kingdom.html United Kingdom, Exploration & Production, E.ON]  | # [http://www.eon.com/en/business-areas/gas-supply-and-production/exploration-and-production/united-kingdom.html United Kingdom, Exploration & Production, E.ON]  | ||
| Line 49: | Line 52: | ||
# [http://killajoules.wikidot.com/blog:4047 Noreco reports that subsea preparations completed and commissioning activities are underway at the Huntington field development]  | # [http://killajoules.wikidot.com/blog:4047 Noreco reports that subsea preparations completed and commissioning activities are underway at the Huntington field development]  | ||
# [http://killajoules.wikidot.com/blog:4112 Huntington – first oil]  | # [http://killajoules.wikidot.com/blog:4112 Huntington – first oil]  | ||
| − | # [  | + | # [https://abarrelfull.blogspot.com/2024/05/proposed-acquisition-of-uk-north-sea.html Acquisition of UK North Sea Assets from E.ON]   | 
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]  | ||
[[category:Field]]  | [[category:Field]]  | ||
[[category:UK]]  | [[category:UK]]  | ||
| − | [[category:Harbour]]  | + | [[category:Harbour Energy]]  | 
| + | [[category:Decommissioned]]  | ||
Latest revision as of 15:30, 11 June 2024
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: central North Sea
 - Production start: 2013
 - Partners: E.ON E&P (operator, 25%), Premier (40%), Noreco (20%) and Iona Energy (15%)
 - Type: Oil & Gas
 - Estimated Reserves:
 - Production Volume: 30,000 bpd
 
Description
- The field is no longer in production
 - The Huntington Field was a subsea development located in block 22/14b in the Central North Sea, 230km east-northeast of Aberdeen, in a water depth of approximately 89 metres. The Field was tied back to the Voyageur Spirit FPSO, where produced fluids were processed.
 - Gas was used for gas lift, fuel and exported to the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP.
 - Stabilised crude oil was exported via shuttle tankers.
 
Contractors
- Wood Group: Five year operations and maintenance contract to provide asset management services for the FPSO
 - Xodus: FEED study
 - Subsea 7: Installation of 12km of the 8-inch Gas Export pipeline, installation of infield flexible flowlines, main static umbilical and associated risers as well as installation of subsea structures followed by tie-ins, pre-commissioning and system testing.
 - Sevan Marine: FPSO Voyageur Spirit upgrade
 
History
- 2007 - Completion of the first stage of appraisal drilling
 - 2009 - Premier acquired a share of the field on acquiring Oilexco
 - 2010 - Letter of Intent signed for FPSO
 - 2010 - Wood Group has been awarded a five year operations and maintenance contract to provide asset management services for the FPSO
 - 2012 - Voyageur Spirit FPSO set sail for the field
 - 2012 - Iona Energy acquired 15% from Carrizo Oil & Gas
 - 2013 - Huntington – first oil announced
 - 2016 - Premier Oil acquired EON's share
 - 2020 - The field was shut down
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 - 2021 - Approval granted for decommissioning
 
Geology
- Three discoveries in three horizons have been made in the licence; the Forties formation, the Fulmar formation and the Triassic Skagerrak formation
 
Links
- UK Oil and Gas Field Approved Decommissioning Programmes
 - CIMC Raffles FPSO References
 - United Kingdom, Exploration & Production, E.ON
 - Completion of first stage of appraisal drilling on Huntington discovery
 - Xodus wins FEED study for major Huntington oil field
 - Letter of Intent signed for FPSO Sevan Voyageur for Huntington development
 - Wood Group Awarded Five Year Operations and Maintenance Contract for FPSO Sevan Voyageur on Huntington field
 - Subsea 7 Announces Contract for E.ON in North Sea
 - Sail away of the FPSO Voyageur Spirit
 - Carrizo Oil & Gas Announces Sale of Its Interest in the Huntington Field in the UK North Sea for $184 Million
 - Huntington TEG dehydration Module
 - Noreco reports that subsea preparations completed and commissioning activities are underway at the Huntington field development
 - Huntington – first oil
 - Acquisition of UK North Sea Assets from E.ON
 - Harbour Energy to be admitted to trading