Difference between revisions of "Turkmenbashi Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
Line 46: Line 46:
 
* 2010 - Commissioning of Delayed Coker
 
* 2010 - Commissioning of Delayed Coker
 
* 2015 - Neste Jacobs awarded train loading facility contract
 
* 2015 - Neste Jacobs awarded train loading facility contract
 +
* 2016 - Alkylation unit commissioned
 +
 
=== Links ===
 
=== Links ===
  
Line 53: Line 55:
 
# [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery]
 
# [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery]
 
# [[EIED Oil And Gas Projects]]
 
# [[EIED Oil And Gas Projects]]
 +
# [[Elessent Alkylation Units]]
 
# [[Foster Wheeler Delayed Cokers]]
 
# [[Foster Wheeler Delayed Cokers]]
 
# [[Uhde Downstream Oil And Gas Projects]]
 
# [[Uhde Downstream Oil And Gas Projects]]
 
# [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp]
 
# [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp]
 
# [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan]
 
# [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan]

Latest revision as of 13:12, 7 June 2024

Summary Information

  • Ownership:
  • Website:
  • Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Refining Depth:

+++ Refining Units

  • [[[Atmospheric Distillation]]]
  • Vacuum Distillation
  • Fluidised Catalytic Cracker
  • Delayed Coker - 17,600 bpd
  • Gas concentration section with capacity of 4140 TPD
  • Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)
  • LPG Merox process unit with capacity of 11600 bpd
  • Gasoline Merox process unit with capacity of 23300 bpd

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • -

+++ Products Produced

  • LPG, Gasoline

+++ Ongoing Projects

  • For details see [[[Turkmenbashi Refinery Project]]]
  • The refinery is planning a major upgrade project.
  • The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.

+++ Other Information

  • -

+++ History

  • 1999 - Reconstruction of catalytic cracking plant
  • 2000 - Renovation of vacuum plant
  • 2001 - Revamp of base oil plant
  • 2002 - Reconstruction of Primary oil processing Plants
  • 2002 - Foster Wheeler awarded Coker revamp contract
  • 2010 - Commissioning of Delayed Coker
  • 2015 - Neste Jacobs awarded train loading facility contract
  • 2016 - Alkylation unit commissioned

Links

  1. Foster Wheeler Delayed Coker Revamp
  2. Turkmenbashi Refinery DCU Project
  3. Emerol Projects
  4. Gasoline Production Unit Project Turkmenbashi Refinery
  5. EIED Oil And Gas Projects
  6. Elessent Alkylation Units
  7. Foster Wheeler Delayed Cokers
  8. Uhde Downstream Oil And Gas Projects
  9. Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp
  10. Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan