Difference between revisions of "Turkmenbashi Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 46: | Line 46: | ||
* 2010 - Commissioning of Delayed Coker | * 2010 - Commissioning of Delayed Coker | ||
* 2015 - Neste Jacobs awarded train loading facility contract | * 2015 - Neste Jacobs awarded train loading facility contract | ||
+ | * 2016 - Alkylation unit commissioned | ||
+ | |||
=== Links === | === Links === | ||
Line 53: | Line 55: | ||
# [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery] | # [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery] | ||
# [[EIED Oil And Gas Projects]] | # [[EIED Oil And Gas Projects]] | ||
+ | # [[Elessent Alkylation Units]] | ||
# [[Foster Wheeler Delayed Cokers]] | # [[Foster Wheeler Delayed Cokers]] | ||
# [[Uhde Downstream Oil And Gas Projects]] | # [[Uhde Downstream Oil And Gas Projects]] | ||
# [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp] | # [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp] | ||
# [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan] | # [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan] |
Latest revision as of 13:12, 7 June 2024
Summary Information
- Ownership:
- Website:
- Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Refining Depth:
+++ Refining Units
- [[[Atmospheric Distillation]]]
- Vacuum Distillation
- Fluidised Catalytic Cracker
- Delayed Coker - 17,600 bpd
- Gas concentration section with capacity of 4140 TPD
- Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)
- LPG Merox process unit with capacity of 11600 bpd
- Gasoline Merox process unit with capacity of 23300 bpd
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- LPG, Gasoline
+++ Ongoing Projects
- For details see [[[Turkmenbashi Refinery Project]]]
- The refinery is planning a major upgrade project.
- The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.
+++ Other Information
- -
+++ History
- 1999 - Reconstruction of catalytic cracking plant
- 2000 - Renovation of vacuum plant
- 2001 - Revamp of base oil plant
- 2002 - Reconstruction of Primary oil processing Plants
- 2002 - Foster Wheeler awarded Coker revamp contract
- 2010 - Commissioning of Delayed Coker
- 2015 - Neste Jacobs awarded train loading facility contract
- 2016 - Alkylation unit commissioned
Links
- Foster Wheeler Delayed Coker Revamp
- Turkmenbashi Refinery DCU Project
- Emerol Projects
- Gasoline Production Unit Project Turkmenbashi Refinery
- EIED Oil And Gas Projects
- Elessent Alkylation Units
- Foster Wheeler Delayed Cokers
- Uhde Downstream Oil And Gas Projects
- Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp
- Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan