Difference between revisions of "Turkmenbashi Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Website: Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan Capacity: million tons/annum & bbl/day Nelson Complexit...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Summary Information | Summary Information | ||
− | Ownership: | + | |
− | Website: | + | * Ownership: |
− | Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan | + | * Website: |
− | Capacity: million tons/annum & bbl/day | + | * Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan |
− | Nelson Complexity: | + | * Capacity: million tons/annum & bbl/day |
− | Refining Depth: | + | * Nelson Complexity: |
− | Refining Units | + | * Refining Depth: |
− | Atmospheric Distillation | + | |
− | Vacuum Distillation | + | +++ Refining Units |
− | Fluidised Catalytic Cracker | + | |
− | Delayed Coker - 17,600 bpd | + | * [[[Atmospheric Distillation]]] |
− | Gas concentration section with capacity of 4140 TPD | + | * Vacuum Distillation |
− | Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur) | + | * Fluidised Catalytic Cracker |
− | LPG Merox process unit with capacity of 11600 bpd | + | * Delayed Coker - 17,600 bpd |
− | Gasoline Merox process unit with capacity of 23300 bpd | + | * Gas concentration section with capacity of 4140 TPD |
− | Terminal Capacity | + | * Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur) |
− | Crude Oil: | + | * LPG Merox process unit with capacity of 11600 bpd |
− | Refined Products: | + | * Gasoline Merox process unit with capacity of 23300 bpd |
− | Crude Supply | + | |
− | - | + | +++ Terminal Capacity |
− | Products Produced | + | |
− | LPG, Gasoline | + | * Crude Oil: |
− | Ongoing Projects | + | * Refined Products: |
− | For details see Turkmenbashi Refinery Project | + | |
− | The refinery is planning a major upgrade project. | + | +++ Crude Supply |
− | The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery. | + | * - |
− | Other Information | + | |
− | - | + | +++ Products Produced |
− | History | + | * LPG, Gasoline |
− | 1999 - Reconstruction of catalytic cracking plant | + | |
− | 2000 - Renovation of vacuum plant | + | +++ Ongoing Projects |
− | 2001 - Revamp of base oil plant | + | * For details see [[[Turkmenbashi Refinery Project]]] |
− | 2002 - Reconstruction of Primary oil processing Plants | + | * The refinery is planning a major upgrade project. |
− | 2002 - Foster Wheeler awarded Coker revamp contract | + | * The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery. |
− | 2010 - Commissioning of Delayed Coker | + | |
− | 2015 - Neste Jacobs awarded train loading facility contract | + | +++ Other Information |
+ | * - | ||
+ | |||
+ | +++ History | ||
+ | * 1999 - Reconstruction of catalytic cracking plant | ||
+ | * 2000 - Renovation of vacuum plant | ||
+ | * 2001 - Revamp of base oil plant | ||
+ | * 2002 - Reconstruction of Primary oil processing Plants | ||
+ | * 2002 - Foster Wheeler awarded Coker revamp contract | ||
+ | * 2010 - Commissioning of Delayed Coker | ||
+ | * 2015 - Neste Jacobs awarded train loading facility contract | ||
+ | * 2016 - Alkylation unit commissioned | ||
+ | |||
=== Links === | === Links === | ||
+ | |||
# [http://www.fwc.com/GlobalEC/pdf/turkmenbashi_turkmenistan.pdf Foster Wheeler Delayed Coker Revamp] | # [http://www.fwc.com/GlobalEC/pdf/turkmenbashi_turkmenistan.pdf Foster Wheeler Delayed Coker Revamp] | ||
# [http://www.fosterwheeler.it/PrjProfiles/WEBAPP_PROFILES/ProcessPlants/Refining/LOTUS%20ENERJI-TNGIZT%20Turkmenbashi%20Refinery%20DCU%20Project.pdf Turkmenbashi Refinery DCU Project] | # [http://www.fosterwheeler.it/PrjProfiles/WEBAPP_PROFILES/ProcessPlants/Refining/LOTUS%20ENERJI-TNGIZT%20Turkmenbashi%20Refinery%20DCU%20Project.pdf Turkmenbashi Refinery DCU Project] | ||
Line 42: | Line 55: | ||
# [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery] | # [http://www.odcc.ir/showportfolio.aspx?Name=Portfoli&code=20&basecode=79 Gasoline Production Unit Project Turkmenbashi Refinery] | ||
# [[EIED Oil And Gas Projects]] | # [[EIED Oil And Gas Projects]] | ||
+ | # [[Elessent Alkylation Units]] | ||
# [[Foster Wheeler Delayed Cokers]] | # [[Foster Wheeler Delayed Cokers]] | ||
# [[Uhde Downstream Oil And Gas Projects]] | # [[Uhde Downstream Oil And Gas Projects]] | ||
# [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp] | # [http://killajoules.wikidot.com/archive:feed-contract-awarded-to-foster-wheeler-for-turkmeni Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp] | ||
# [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan] | # [http://killajoules.wikidot.com/blog:5893 Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan] |
Latest revision as of 13:12, 7 June 2024
Summary Information
- Ownership:
- Website:
- Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Refining Depth:
+++ Refining Units
- [[[Atmospheric Distillation]]]
- Vacuum Distillation
- Fluidised Catalytic Cracker
- Delayed Coker - 17,600 bpd
- Gas concentration section with capacity of 4140 TPD
- Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)
- LPG Merox process unit with capacity of 11600 bpd
- Gasoline Merox process unit with capacity of 23300 bpd
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- LPG, Gasoline
+++ Ongoing Projects
- For details see [[[Turkmenbashi Refinery Project]]]
- The refinery is planning a major upgrade project.
- The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.
+++ Other Information
- -
+++ History
- 1999 - Reconstruction of catalytic cracking plant
- 2000 - Renovation of vacuum plant
- 2001 - Revamp of base oil plant
- 2002 - Reconstruction of Primary oil processing Plants
- 2002 - Foster Wheeler awarded Coker revamp contract
- 2010 - Commissioning of Delayed Coker
- 2015 - Neste Jacobs awarded train loading facility contract
- 2016 - Alkylation unit commissioned
Links
- Foster Wheeler Delayed Coker Revamp
- Turkmenbashi Refinery DCU Project
- Emerol Projects
- Gasoline Production Unit Project Turkmenbashi Refinery
- EIED Oil And Gas Projects
- Elessent Alkylation Units
- Foster Wheeler Delayed Cokers
- Uhde Downstream Oil And Gas Projects
- Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp
- Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan