Summary Information
 
Summary Information
Ownership:
+
 
Website:
+
* Ownership:  
Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
+
* Website:  
Capacity: million tons/annum & bbl/day
+
* Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
Nelson Complexity:
+
* Capacity: million tons/annum & bbl/day
Refining Depth:
+
* Nelson Complexity:  
Refining Units
+
* Refining Depth:
Atmospheric Distillation
+
 
Vacuum Distillation
+
+++ Refining Units
Fluidised Catalytic Cracker
+
 
Delayed Coker - 17,600 bpd
+
* [[[Atmospheric Distillation]]]
Gas concentration section with capacity of 4140 TPD
+
* Vacuum Distillation
Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)
+
* Fluidised Catalytic Cracker
LPG Merox process unit with capacity of 11600 bpd
+
* Delayed Coker - 17,600 bpd
Gasoline Merox process unit with capacity of 23300 bpd
+
* Gas concentration section with capacity of 4140 TPD  
Terminal Capacity
+
* Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)  
Crude Oil:
+
* LPG Merox process unit with capacity of 11600 bpd  
Refined Products:
+
* Gasoline Merox process unit with capacity of 23300 bpd
Crude Supply
+
 
-
+
+++ Terminal Capacity
Products Produced
+
 
LPG, Gasoline
+
* Crude Oil:  
Ongoing Projects
+
* Refined Products:  
For details see Turkmenbashi Refinery Project
+
 
The refinery is planning a major upgrade project.
+
+++ Crude Supply
The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.
+
* -
Other Information
+
 
-
+
+++ Products Produced
History
+
* LPG, Gasoline
1999 - Reconstruction of catalytic cracking plant
+
 
2000 - Renovation of vacuum plant
+
+++ Ongoing Projects
2001 - Revamp of base oil plant
+
* For details see [[[Turkmenbashi Refinery Project]]]
2002 - Reconstruction of Primary oil processing Plants
+
* The refinery is planning a major upgrade project.
2002 - Foster Wheeler awarded Coker revamp contract
+
* The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.
2010 - Commissioning of Delayed Coker
+
 
2015 - Neste Jacobs awarded train loading facility contract
+
+++ Other Information
 +
* -
 +
 
 +
+++ History
 +
* 1999 - Reconstruction of catalytic cracking plant  
 +
* 2000 - Renovation of vacuum plant  
 +
* 2001 - Revamp of base oil plant
 +
* 2002 - Reconstruction of Primary oil processing Plants  
 +
* 2002 - Foster Wheeler awarded Coker revamp contract
 +
* 2010 - Commissioning of Delayed Coker
 +
* 2015 - Neste Jacobs awarded train loading facility contract
 
=== Links ===
 
=== Links ===
 +
 
# [http://www.fwc.com/GlobalEC/pdf/turkmenbashi_turkmenistan.pdf Foster Wheeler Delayed Coker Revamp]
 
# [http://www.fwc.com/GlobalEC/pdf/turkmenbashi_turkmenistan.pdf Foster Wheeler Delayed Coker Revamp]
 
# [http://www.fosterwheeler.it/PrjProfiles/WEBAPP_PROFILES/ProcessPlants/Refining/LOTUS%20ENERJI-TNGIZT%20Turkmenbashi%20Refinery%20DCU%20Project.pdf Turkmenbashi Refinery DCU Project]
 
# [http://www.fosterwheeler.it/PrjProfiles/WEBAPP_PROFILES/ProcessPlants/Refining/LOTUS%20ENERJI-TNGIZT%20Turkmenbashi%20Refinery%20DCU%20Project.pdf Turkmenbashi Refinery DCU Project]

Revision as of 13:11, 7 June 2024

Summary Information

  • Ownership:
  • Website:
  • Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Refining Depth:

+++ Refining Units

  • [[[Atmospheric Distillation]]]
  • Vacuum Distillation
  • Fluidised Catalytic Cracker
  • Delayed Coker - 17,600 bpd
  • Gas concentration section with capacity of 4140 TPD
  • Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur)
  • LPG Merox process unit with capacity of 11600 bpd
  • Gasoline Merox process unit with capacity of 23300 bpd

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • -

+++ Products Produced

  • LPG, Gasoline

+++ Ongoing Projects

  • For details see [[[Turkmenbashi Refinery Project]]]
  • The refinery is planning a major upgrade project.
  • The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery.

+++ Other Information

  • -

+++ History

  • 1999 - Reconstruction of catalytic cracking plant
  • 2000 - Renovation of vacuum plant
  • 2001 - Revamp of base oil plant
  • 2002 - Reconstruction of Primary oil processing Plants
  • 2002 - Foster Wheeler awarded Coker revamp contract
  • 2010 - Commissioning of Delayed Coker
  • 2015 - Neste Jacobs awarded train loading facility contract

Links

  1. Foster Wheeler Delayed Coker Revamp
  2. Turkmenbashi Refinery DCU Project
  3. Emerol Projects
  4. Gasoline Production Unit Project Turkmenbashi Refinery
  5. EIED Oil And Gas Projects
  6. Foster Wheeler Delayed Cokers
  7. Uhde Downstream Oil And Gas Projects
  8. Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp
  9. Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan