Difference between revisions of "Saturn Area Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Centrica * Country: UK * Location: Southern North Sea, blocks 48/10a and 48/10b * Production start: 2005 * Partners: * Type: Gas * Estimated...") |
Abarrelfull (talk | contribs) |
||
| Line 12: | Line 12: | ||
* The Saturn Unit lies in Blocks 48/10a and 48/10b of the Southern North Sea and consists of natural gas accumulations Atlas, Hyperion and Rhea. | * The Saturn Unit lies in Blocks 48/10a and 48/10b of the Southern North Sea and consists of natural gas accumulations Atlas, Hyperion and Rhea. | ||
* The development concept includes an unmanned six slot minimum facilities platform | * The development concept includes an unmanned six slot minimum facilities platform | ||
| − | * [[Mimas | + | * [[Mimas and Tethys Gas Fields]] are tied back to the Saturn Platform |
* A 43 km 14-inch pipeline ties back the Saturn platform to [[Lincolnshire Offshore Gas Gathering System (Loggs)]] | * A 43 km 14-inch pipeline ties back the Saturn platform to [[Lincolnshire Offshore Gas Gathering System (Loggs)]] | ||
Revision as of 13:58, 3 June 2024
Summary Information
- Operator: Centrica
- Country: UK
- Location: Southern North Sea, blocks 48/10a and 48/10b
- Production start: 2005
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Saturn Unit lies in Blocks 48/10a and 48/10b of the Southern North Sea and consists of natural gas accumulations Atlas, Hyperion and Rhea.
- The development concept includes an unmanned six slot minimum facilities platform
- Mimas and Tethys Gas Fields are tied back to the Saturn Platform
- A 43 km 14-inch pipeline ties back the Saturn platform to Lincolnshire Offshore Gas Gathering System (Loggs)
+++ Contractors
- **SLP Engineering Ltd:** Saturn Platform and Loggs PR Separator Vessel
- **Seaway Heavy Lifting:** T & I - Saturn Platform and Loggs PR Separator Vessel
- **Saipem:** Saturn, pipelines EPIC
- **Global Maritime:** Warranty surveyor for installation of flowlines
+++ History
- 2004 - Development approval granted
- 2005 - First gas produced
+++ Geology
+++ Links