Difference between revisions of "Montara Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Jadestone |
* Country: Australia | * Country: Australia | ||
* Location: north-west coast of Australia | * Location: north-west coast of Australia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water. | * The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water. | ||
* The MDP consists of the following infrastructure: | * The MDP consists of the following infrastructure: | ||
Line 22: | Line 22: | ||
− | + | === Contractors === | |
* '''Clough:''' transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold | * '''Clough:''' transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold | ||
* '''SCSE:''' Jacket Fabrication | * '''SCSE:''' Jacket Fabrication | ||
* '''AusGroup:''' Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline | * '''AusGroup:''' Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline | ||
* '''Saipem:''' Wellhead platform and sealines | * '''Saipem:''' Wellhead platform and sealines | ||
− | * '''Thai Nippon Steel & Sumikin:''' | + | * '''Thai Nippon Steel & Sumikin:''' Wellhead Platform Deck Replacement |
− | + | === History === | |
* 2008 - PTT acquired Coogee Resources | * 2008 - PTT acquired Coogee Resources | ||
* 2009 - An oil leak led to a major fire and Australia's worse oil spill | * 2009 - An oil leak led to a major fire and Australia's worse oil spill | ||
* 2013 - First oil produced | * 2013 - First oil produced | ||
+ | * 2018 - PTTEP sold the field to Jadestone Energy | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Saipem Fixed Offshore Production Facilities Project References]] | # [[Saipem Fixed Offshore Production Facilities Project References]] | ||
# [[Shenzhen Chiwan Sembawang Engineering Platform References]] | # [[Shenzhen Chiwan Sembawang Engineering Platform References]] | ||
Line 46: | Line 47: | ||
# [http://killajoules.wikidot.com/archive:pttep-report-on-crude-oil-and-gas-leak-incident-in-a PTTEP report on crude oil and gas leak incident in Australia] | # [http://killajoules.wikidot.com/archive:pttep-report-on-crude-oil-and-gas-leak-incident-in-a PTTEP report on crude oil and gas leak incident in Australia] | ||
# [http://killajoules.wikidot.com/archive:commencement-of-montara-production Commencement of Montara Production] | # [http://killajoules.wikidot.com/archive:commencement-of-montara-production Commencement of Montara Production] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/pttep-divests-its-stake-in-montara.html PTTEP divests its stake in Montara field in alignment with strategic plan] |
Latest revision as of 15:02, 24 May 2024
Summary Information
- Operator: Jadestone
- Country: Australia
- Location: north-west coast of Australia
- Production start: 2013
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
- The MDP consists of the following infrastructure:
- An unmanned wellhead platform (WHP) at the Montara field with five (5) wells, three (3) 14 inch Production Risers, two (2) 6 inch Gas Lift Risers and one (1) 12 inch J-Tube;
- Five (5) subsea wells for development of the Skua, Swift and Swallow fields;
- Production flowline system consisting of two (2) 6- inch, one (1) 10 inch and three (3) 14 inch flowlines and associated tie-in spools;
- Gas lift flowline system consisting of one (1) 6 inch and three (3) 4 inch flowlines and associated tie-in spools;
- Three (3) infield control umbilicals and associated flying leads;
- A subsea manifold in the Swift field for comingling the production fluids and distributing the compressed gas and electro-hydraulic services to the subsea wells; and
- The Montara Venture FPSO facility and its associated mooring system located approximately 1.5 km northeast of the WHP.
- Two (2) 10 inch Flexible Production Risers and associated riser bases. One (1) 6 inch Flexible Gas Lift Riser and associated riser base. Two (2) control umbilicals and associated riser bases. One (1) gas compressor for the gas lift system.
Contractors
- Clough: transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
- SCSE: Jacket Fabrication
- AusGroup: Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
- Saipem: Wellhead platform and sealines
- Thai Nippon Steel & Sumikin: Wellhead Platform Deck Replacement
History
- 2008 - PTT acquired Coogee Resources
- 2009 - An oil leak led to a major fire and Australia's worse oil spill
- 2013 - First oil produced
- 2018 - PTTEP sold the field to Jadestone Energy
Geology
Links
- Saipem Fixed Offshore Production Facilities Project References
- Shenzhen Chiwan Sembawang Engineering Platform References
- Thai Nippon Steel & Sumikin Engineering & Construction Platform References
- Clough Awarded $116m Contract by PTTEP Australasia
- PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited
- AusGroup Secures AUD$12.0 million Contract for Construction Manning Services
- PTTEP report on crude oil and gas leak incident in Australia
- Commencement of Montara Production
- PTTEP divests its stake in Montara field in alignment with strategic plan