Difference between revisions of "Golfinho Gas Field"

From A Barrel Full
Jump to navigation Jump to search
Line 17: Line 17:
  
 
* 3 competing Design Contracts: Full engineering, procurement, installation and commissioning plan for subsea production systems
 
* 3 competing Design Contracts: Full engineering, procurement, installation and commissioning plan for subsea production systems
** **Technip**
+
** '''Technip''', '''Subsea 7 and Saipem''' and '''McDermott and Allseas'''
** **Subsea 7 and Saipem**
+
* '''TechnipFMC and Van Oord:'''Engineering, Procurement, Construction and Installation (EPCI) of the subsea hardware system
** **McDermott and Allseas**
+
 
  
 
=== History ===
 
=== History ===

Revision as of 09:26, 24 May 2024

Summary Information

  • Operator: Total
  • Country: Mozambique
  • Location: Rovuma Offshore Area 1
  • Production start:
  • Partners:
    • Anadarko 36.5-percent, Mitsui (20 percent), BPRL Ventures (10 percent), Videocon (10 percent) and Cove Energy (8.5 percent)
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:


Description

Contractors

  • 3 competing Design Contracts: Full engineering, procurement, installation and commissioning plan for subsea production systems
    • Technip, Subsea 7 and Saipem and McDermott and Allseas
  • TechnipFMC and Van Oord:Engineering, Procurement, Construction and Installation (EPCI) of the subsea hardware system


History

  • 2012 - Golfinho discovered
  • 2012 - Competitive FEED contracts awarded
  • 2013 - ONGC agreed to buy 10% of the licence
  • 2019 - Total acquired Anadarko's stake

Geology

  • The gas bearing structure consists of two high-quality Oligocene fan systems

Links

  1. Anadarko Extends Exploration Success with New Discovery Area Offshore Mozambique
  2. Advancement of Mozambique LNG Project in Rovuma Offshore Area 1, Mozambique
  3. Anadarko Announces $2.64 Billion All-Cash Transaction for Portion of Offshore Mozambique Block
  4. Total Closes the Acquisition of Anadarko’s Shareholding in Mozambique LNG