Difference between revisions of "Triton FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 35: Line 35:
 
* 2013 - Triton produced its 200 millionth barrel of oil
 
* 2013 - Triton produced its 200 millionth barrel of oil
 
* 2013 - Dana Petroleum installed new mooring chains for Triton
 
* 2013 - Dana Petroleum installed new mooring chains for Triton
 +
* 2017 - Tailwind Energy acquired stakes from Shell and Exxon
 +
* 2023 - Serica acquired Tailwind
 
* 2024 - The Belinda project received approval
 
* 2024 - The Belinda project received approval
  
Line 52: Line 54:
 
# [http://killajoules.wikidot.com/blog:4413 New mooring chains for Dana Petroleum’s Triton oil production vessel ensure safe operations into next decade]
 
# [http://killajoules.wikidot.com/blog:4413 New mooring chains for Dana Petroleum’s Triton oil production vessel ensure safe operations into next decade]
 
# [http://killajoules.wikidot.com/blog:5832 Technip wins subsea contract on Triton FPSO]
 
# [http://killajoules.wikidot.com/blog:5832 Technip wins subsea contract on Triton FPSO]
 +
# [https://abarrelfull.blogspot.com/2024/05/tailwind-energy-buys-out-shell-exxon-at.html Tailwind Energy buys out Shell, Exxon at Triton]
 +
# [https://abarrelfull.blogspot.com/2023/09/serica-energy-plc-proposed-acquisition.html Serica Energy PLC Proposed Acquisition of Tailwind Energy Investments Ltd]
 
# [https://a-barrel-full.blogspot.com/2024/05/approval-of-belinda-development.html Approval of Belinda Development]
 
# [https://a-barrel-full.blogspot.com/2024/05/approval-of-belinda-development.html Approval of Belinda Development]

Revision as of 13:39, 21 May 2024

Summary Information

Brief Description

  • The Triton FPSO produces oil and gas from the Bittern, Guillemot West and North West, Clapham, Pict and Saxon fields.
  • Capacity is 105,000 bopd of oil 105,000 bopd, 140 mmcfd of gas and 125,000 b/d of water injection.
  • The Belinda field which is under development will be tied back to Triton
  • The vessel is 244 metres long and has storage capacity is 630,000 barrels
  • The turret is the core of the Triton FPSO. It is a large circular structure at the forward end of the vessel which will be anchored to the seabed by nine anchor chains. All the control umbilicals and flexible risers connected to the subsea pipelines pass through this structure.


Contractors

  • Kvaerner: Overall construction contract
  • Samsung Heavy Industries: Hull Construction
  • Sembawang Shipyard: Modification
  • Bluewater: Internal Turret
  • Emerson: Control systems

Status

  • In operation

History

  • 1997 - Kvaerner Oil & Gas awarded construction contract
  • 2000 - First oil production on the Triton FPSO
  • 2012 - Dana becomes operator of Triton FPSO
  • 2013 - Triton produced its 200 millionth barrel of oil
  • 2013 - Dana Petroleum installed new mooring chains for Triton
  • 2017 - Tailwind Energy acquired stakes from Shell and Exxon
  • 2023 - Serica acquired Tailwind
  • 2024 - The Belinda project received approval

Other Information

  • -

Links

  1. International Protective Coatings FPSO References
  2. Emerson FPSO References
  3. Bluewater FPSO References
  4. FPSO Triton sails from Tees Offshore Base
  5. First Oil Through Triton FPSO
  6. Dana becomes operator of Triton FPSO
  7. Dana Petroleum’s Triton production vessel reaches 200 millionth barrel milestone
  8. New mooring chains for Dana Petroleum’s Triton oil production vessel ensure safe operations into next decade
  9. Technip wins subsea contract on Triton FPSO
  10. Tailwind Energy buys out Shell, Exxon at Triton
  11. Serica Energy PLC Proposed Acquisition of Tailwind Energy Investments Ltd
  12. Approval of Belinda Development