Difference between revisions of "Rosetta Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information ===  | === Summary Information ===  | ||
| − | * Operator:   | + | * Operator: Shell  | 
* Country: Egypt  | * Country: Egypt  | ||
* Location: Mediterranean Sea, offshore Egypt  | * Location: Mediterranean Sea, offshore Egypt  | ||
| Line 37: | Line 37: | ||
=== Links ===  | === Links ===  | ||
# [[Aker Solutions Umbilical References]]  | # [[Aker Solutions Umbilical References]]  | ||
| − | # [[  | + | # [[ENPPI Gas Processing References]]  | 
| + | # [[ENPPI Offshore Platform References]]  | ||
# [[Global Maritime Pipeline References]]  | # [[Global Maritime Pipeline References]]  | ||
# [[Jotun Platform References]]  | # [[Jotun Platform References]]  | ||
Latest revision as of 17:13, 14 March 2024
Summary Information
- Operator: Shell
 - Country: Egypt
 - Location: Mediterranean Sea, offshore Egypt
 - Production start: 2001
 - Partners: Shell, Edison
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- Located offshore in the Mediterranean Sea in 61 metres of water 48 kilometres northeast of Alexandria
 - Phase I included an offshore production platform with a capacity of 275 MMSCFD and a 67 km, 24” gas subsea pipeline running to onshore terminal
 - Phase 2 of the Rosetta Concession development consists of an unmanned minimum facilities wellhead platform tied back to the existing Rosetta platform
 
Contractors
- **Enppi:** Basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance
 - **Seaway Heavy Lifting:** Installation of Rosetta Field Platform Jacket
 - **Tecon:** Feasibility study and conceptual design of one minimum facilities wellhead platform for phase 2
 - **Petrojet Marine:** Jacket, Heli-deck & Topside
 - **Aker Kvaerner:** Supply of five umbilicals to the Phase 3 development
 - **Saipem:** Rosetta Phase III Development Pipeline Installation
 - **Global Maritime:** Warranty surveyor for installation of flowlines, umbilicals and subsea manifolds - Phase II
 
History
- 1997 - First successful exploration well drilled
 - 2001 - First production
 - 2004 - BG Group acquires Shell's 40% stake
 - 2005 - Phase 2 production begins
 - 2006 - Aker Kvaerner wins Rosetta Phase 3 subsea umbilicals
 - 2008 - First gas from phase 3
 - 2015 - Shell acquired BG Group and became the operator
 
Geology
Links
- Aker Solutions Umbilical References
 - ENPPI Gas Processing References
 - ENPPI Offshore Platform References
 - Global Maritime Pipeline References
 - Jotun Platform References
 - Saipem Africa Pipeline References
 - Seaway Heavy Lifting Oil And Gas References
 - BG Exploration & Production announces gas discovery in Rosetta Concession, Offshore Egypt
 - BG Group completes purchase of Rosetta stake offshore Egypt
 - BG announces first gas from Simian Sienna and Rosetta Phase Two in Egypt
 - Aker Kvaerner wins Rosetta Phase 3 subsea umbilicals
 - New production for Egyptian domestic market to start following BG Egypt and BP Egypt agreement
 - Recommended cash and share offer for BG Group by Royal Dutch Shell