Abarrelfull (talk | contribs)  (Created page with "=== Summary Information === * Operator: BP  * Country: Trinidad And Tobago * Location: Block Samaan, off the east coast of Trinidad * Production start: 2011 * Partners:  * Typ...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (3 intermediate revisions by the same user not shown) | |||
| Line 4: | Line 4: | ||
* Location: Block Samaan, off the east coast of Trinidad  | * Location: Block Samaan, off the east coast of Trinidad  | ||
* Production start: 2011  | * Production start: 2011  | ||
| − | * Partners:    | + | * Partners: Repsol  | 
| − | * Type:   | + | * Type: Gas  | 
* Estimated Reserves:    | * Estimated Reserves:    | ||
* Production Volume:    | * Production Volume:    | ||
| Line 14: | Line 14: | ||
* Production from Serrette is tied into bpTT's [[Cassia Gas and Condensate Fields | Cassia B hub]] via a 26-inch diameter, 32-mile long pipeline  | * Production from Serrette is tied into bpTT's [[Cassia Gas and Condensate Fields | Cassia B hub]] via a 26-inch diameter, 32-mile long pipeline  | ||
* Production from this facility supplies the domestic market and the [[Atlantic LNG Terminal]]  | * Production from this facility supplies the domestic market and the [[Atlantic LNG Terminal]]  | ||
| + | * The Angelin development includes an unmanned platform and four wells and is tied back to the Serrette platform  | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | * '''Fluor Summit Engineering:''' Design of Production facility  | 
| − | *   | + | * '''Trinidad Offshore Fabricators (TOFCO):''' Construction of installation  | 
| − | *   | + | * '''Fugro:''' Pipeline laying    | 
| + | |||
| + | ==== Angelin ====  | ||
| + | * '''McDermott:''' Pre-FEED, FEED, Front-End Execution Planning & Detailed Engineering  | ||
=== History ===  | === History ===  | ||
* 2009 - Investment decision taken  | * 2009 - Investment decision taken  | ||
* 2011 - First gas produced  | * 2011 - First gas produced  | ||
| + | * 2017 - McDermott awarded Angelin contract  | ||
| + | * 2019 - The Angelin platform starts production  | ||
=== Geology ===  | === Geology ===  | ||
| Line 31: | Line 37: | ||
# [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]  | # [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]  | ||
# [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]  | # [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]  | ||
| + | # [https://abarrelfull.blogspot.com/2024/02/mcdermott-awarded-angelin-epcic.html McDermott Awarded Angelin EPCIC Contract from BP Trinidad & Tobago]  | ||
| + | # [https://abarrelfull.blogspot.com/2024/02/bp-starts-gas-production-from-trinidad.html BP starts gas production from Trinidad and Tobago’s Angelin project]  | ||
Latest revision as of 08:54, 21 February 2024
Summary Information
- Operator: BP
 - Country: Trinidad And Tobago
 - Location: Block Samaan, off the east coast of Trinidad
 - Production start: 2011
 - Partners: Repsol
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- Serrette is located in 280 feet (90 metres) of water off Trinidad's south east coast
 - Serrette is a normally unmanned installation (NUI)
 - Production from Serrette is tied into bpTT's Cassia B hub via a 26-inch diameter, 32-mile long pipeline
 - Production from this facility supplies the domestic market and the Atlantic LNG Terminal
 - The Angelin development includes an unmanned platform and four wells and is tied back to the Serrette platform
 
Contractors
- Fluor Summit Engineering: Design of Production facility
 - Trinidad Offshore Fabricators (TOFCO): Construction of installation
 - Fugro: Pipeline laying
 
Angelin
- McDermott: Pre-FEED, FEED, Front-End Execution Planning & Detailed Engineering
 
History
- 2009 - Investment decision taken
 - 2011 - First gas produced
 - 2017 - McDermott awarded Angelin contract
 - 2019 - The Angelin platform starts production