Difference between revisions of "Sable Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with " Summary Information * Operator: Petrosa  * Country: South Africa * Location:  * Production start: 2003 * Partners:  * Type: Oil  * Estimated Reserves: Original recoverable oi...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | + | === Summary Information ===  | |
* Operator: Petrosa    | * Operator: Petrosa    | ||
* Country: South Africa  | * Country: South Africa  | ||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
* The Sable field is located in the Bredasdorp basin offshore South Africa about 150 km Southwest of Mossel Bay.  | * The Sable field is located in the Bredasdorp basin offshore South Africa about 150 km Southwest of Mossel Bay.  | ||
* The field consists of two reservoirs (E-BD and E-CE) in about 100m of water with recoverable oil reserves estimated at 20 to 25 million barrels.  | * The field consists of two reservoirs (E-BD and E-CE) in about 100m of water with recoverable oil reserves estimated at 20 to 25 million barrels.  | ||
* The field utilised the [[Glas Dowr FPSO]]  | * The field utilised the [[Glas Dowr FPSO]]  | ||
| − | + | === Contractors ===  | |
* **Bluewater:** Supply and operation of FPSO  | * **Bluewater:** Supply and operation of FPSO  | ||
* **SA Five Engineering:** Fabrication and installation of Gas Compression Module, Process Separation Module, Flare Structure and various modifications to the existing topside facilities  | * **SA Five Engineering:** Fabrication and installation of Gas Compression Module, Process Separation Module, Flare Structure and various modifications to the existing topside facilities  | ||
* **Coflexip Stena Offshore:** Design, supply and install specified subsea production system components and related services  | * **Coflexip Stena Offshore:** Design, supply and install specified subsea production system components and related services  | ||
* **Technip:**    | * **Technip:**    | ||
| − | + | ** Design, supply and installation of the subsea facilities  | |
| − | + | ** Installation and hook up of the FPSO  | |
| − | + | === History ===  | |
* 2002 - SA Five Engineering awarded FPSO upgrade work  | * 2002 - SA Five Engineering awarded FPSO upgrade work  | ||
* 2003 - Production started  | * 2003 - Production started  | ||
* 2008 - Production of the Sable field ceased  | * 2008 - Production of the Sable field ceased  | ||
| − | + | === Geology ===  | |
| − | |||
*    | *    | ||
| − | + | === Links ===  | |
# [http://killajoules.wikidot.com/archive:bluewater-awards-contract-for-upgrade-of-fpso-glas-d Bluewater Awards Contract for Upgrade of FPSO Glas Dowr]  | # [http://killajoules.wikidot.com/archive:bluewater-awards-contract-for-upgrade-of-fpso-glas-d Bluewater Awards Contract for Upgrade of FPSO Glas Dowr]  | ||
# [http://killajoules.wikidot.com/archive:fpso-glas-dowr-sets-sail-for-sable FPSO Glas Dowr sets sail for Sable]  | # [http://killajoules.wikidot.com/archive:fpso-glas-dowr-sets-sail-for-sable FPSO Glas Dowr sets sail for Sable]  | ||
# [http://killajoules.wikidot.com/archive:bluewater-and-petrosa-commence-production-of-oil-on Bluewater and PetroSA commence production of oil on the Sable field offshore South Africa]  | # [http://killajoules.wikidot.com/archive:bluewater-and-petrosa-commence-production-of-oil-on Bluewater and PetroSA commence production of oil on the Sable field offshore South Africa]  | ||
Latest revision as of 08:29, 1 February 2024
Summary Information
- Operator: Petrosa
 - Country: South Africa
 - Location:
 - Production start: 2003
 - Partners:
 - Type: Oil
 - Estimated Reserves: Original recoverable oil reserves estimated at 20 to 25 million barrels
 - Production Volume:
 
Description
- The Sable field is located in the Bredasdorp basin offshore South Africa about 150 km Southwest of Mossel Bay.
 - The field consists of two reservoirs (E-BD and E-CE) in about 100m of water with recoverable oil reserves estimated at 20 to 25 million barrels.
 - The field utilised the Glas Dowr FPSO
 
Contractors
- **Bluewater:** Supply and operation of FPSO
 - **SA Five Engineering:** Fabrication and installation of Gas Compression Module, Process Separation Module, Flare Structure and various modifications to the existing topside facilities
 - **Coflexip Stena Offshore:** Design, supply and install specified subsea production system components and related services
 - **Technip:**
- Design, supply and installation of the subsea facilities
 - Installation and hook up of the FPSO
 
 
History
- 2002 - SA Five Engineering awarded FPSO upgrade work
 - 2003 - Production started
 - 2008 - Production of the Sable field ceased