Difference between revisions of "Safaniya Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Saudi Aramco  * Country: Saudi Arabia  * Location: Arabian Gulf * Production start: 1957 * Partners: * Type: Oil  * Estimated Reserves: * Produ...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Operator: Saudi Aramco    | * Operator: Saudi Aramco    | ||
* Country: Saudi Arabia    | * Country: Saudi Arabia    | ||
| Line 9: | Line 9: | ||
* Production Volume: 1.3mbpd  | * Production Volume: 1.3mbpd  | ||
| − | + | === Description ===  | |
* The Safaniyah field is the world’s largest conventional offshore oil field in terms of proved reserves.    | * The Safaniyah field is the world’s largest conventional offshore oil field in terms of proved reserves.    | ||
* It is located approximately 260 kilometres north of Dhahran. Most of the field lies offshore in the Arabian Gulf.    | * It is located approximately 260 kilometres north of Dhahran. Most of the field lies offshore in the Arabian Gulf.    | ||
| Line 15: | Line 15: | ||
*  A small portion of the field, known as the Khafji field, lies in the offshore neutral zone  | *  A small portion of the field, known as the Khafji field, lies in the offshore neutral zone  | ||
* The oil has a significant water cut  | * The oil has a significant water cut  | ||
| + | * The gas is going to be processes in the [[Tanajib Gas Processing Plant]] which is under construction  | ||
| − | + | === Contractors ===  | |
* **McDermott:**    | * **McDermott:**    | ||
** Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)  | ** Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)  | ||
| Line 23: | Line 24: | ||
* **ENPPI:** Water Disposal System Upgrade  | * **ENPPI:** Water Disposal System Upgrade  | ||
| − | + | === History ===  | |
* 1957 - Oil production started  | * 1957 - Oil production started  | ||
* 1991 - HHI awarded Living Quarters Platform & Module contract  | * 1991 - HHI awarded Living Quarters Platform & Module contract  | ||
| Line 29: | Line 30: | ||
* 2017 - Contracts awarded for major modernisation  | * 2017 - Contracts awarded for major modernisation  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [http://www.saudiaramcoworld.com/issue/196207/safaniya.field.htm Safaniya Field, Saudi Aramco World]    | # [http://www.saudiaramcoworld.com/issue/196207/safaniya.field.htm Safaniya Field, Saudi Aramco World]    | ||
# [[Hyundai Heavy Industries Platform References]]  | # [[Hyundai Heavy Industries Platform References]]  | ||
Latest revision as of 12:03, 31 January 2024
Summary Information
- Operator: Saudi Aramco
 - Country: Saudi Arabia
 - Location: Arabian Gulf
 - Production start: 1957
 - Partners:
 - Type: Oil
 - Estimated Reserves:
 - Production Volume: 1.3mbpd
 
Description
- The Safaniyah field is the world’s largest conventional offshore oil field in terms of proved reserves.
 - It is located approximately 260 kilometres north of Dhahran. Most of the field lies offshore in the Arabian Gulf.
 - Within the Concession Area, the Safaniyah field is approximately 50 kilometres long and 15 kilometres wide.
 - A small portion of the field, known as the Khafji field, lies in the offshore neutral zone
 - The oil has a significant water cut
 - The gas is going to be processes in the Tanajib Gas Processing Plant which is under construction
 
Contractors
- **McDermott:**
- Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
 - (2017) EPCI services including design, fabrication, installation and pre-commissioning of 9 slipover jackets, 10 production deck modules, an electrical distribution platform and associated cables and pipelines.
 
 - **HHI:** Living Quarters Platform & Module
 - **ENPPI:** Water Disposal System Upgrade
 
History
- 1957 - Oil production started
 - 1991 - HHI awarded Living Quarters Platform & Module contract
 - 2006 - Water Disposal System Upgrade project launched
 - 2017 - Contracts awarded for major modernisation
 
Geology
Links
- Safaniya Field, Saudi Aramco World
 - Hyundai Heavy Industries Platform References
 - ENPPI Oil And Gas Processing References
 - McDermott Awarded North Dome and PDM Projects for Saudi Aramco
 - McDermott Awarded Cable Installation Project for Saudi Aramco
 - McDermott Awarded Next Phase of Safaniya EPCI Contract for Saudi Aramco