Difference between revisions of "Chinarevskoye Gas Processing Plant"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| (4 intermediate revisions by the same user not shown) | |||
| Line 7: | Line 7: | ||
| === Brief Description === | === Brief Description === | ||
| − | *  | + | * The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas. | 
| + | * The plant has three trains. | ||
| === Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
| Line 20: | Line 21: | ||
| === History === | === History === | ||
| + | * 2011 - The first 2 trains of the plant began operations | ||
| + | * 2017 - The 3rd train was completed | ||
| * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | ||
| + | * 2023 - The plant began processing gas from Rozhkovskoye | ||
| ===  Links === | ===  Links === | ||
| + | # [[KazStroyService Oil And Gas Processing References]] | ||
| + | # [http://adal-profi.kz/eng/ustanovka-kompleksnoj-podgotovki-gaza-3-na-chinarevskom-mestorozhdenii/ ADAL PROFI, Chinarevskoye] | ||
| # [https://abarrelfull.blogspot.com/2024/01/binding-agreement-with-ural-oil-gas-llp.html Binding agreement with Ural Oil & Gas LLP] | # [https://abarrelfull.blogspot.com/2024/01/binding-agreement-with-ural-oil-gas-llp.html Binding agreement with Ural Oil & Gas LLP] | ||
| [[category:Processing]] | [[category:Processing]] | ||
| − | [[category: | + | [[category:Kazakhstan]] | 
| − | [[category: | + | [[category:Nostrum]] | 
Latest revision as of 15:45, 21 January 2024
Contents
Summary Information
- Ownership: Nostrum
- Website: https://www.nostrumoilandgas.com/
- Location: North West Kazakhstan
- Capacity: 4.2 BCM per annum
Brief Description
- The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas.
- The plant has three trains.
Related Oil and Gas Fields
Ongoing Projects
- -
Other Information
- -
History
- 2011 - The first 2 trains of the plant began operations
- 2017 - The 3rd train was completed
- 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field
- 2023 - The plant began processing gas from Rozhkovskoye