Difference between revisions of "Brunsbüttel Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Elbehafen LNG |
− | * Website: | + | * Website: https://www.rwe.com/en/ |
− | * Location: | + | * Location: Elbehafen, Brunsbüttel, Germany |
− | * Capacity: million tons/annum | + | * Capacity: 6.0 million tons/annum |
− | * Status: | + | * Status: In operation |
+ | |||
=== Brief Description === | === Brief Description === | ||
− | + | * The FSRU is 300-metre-long, capable of taking on up to 170,000 cubic metres of LNG from tankers in a single unloading operation | |
+ | * Phase 1 of the project will use Brunsbüttel Ports' existing dangerous goods jetty | ||
+ | * Phase 2 is expected to start in autumn 2023 and will involve the use of a newly built jetty to the west of the Elbehafen. | ||
+ | * Phase 3 involves the construction of a new gas connection pipeline "ET180", which will enable supply of 7.5 BCM per annum | ||
=== Technical Details === | === Technical Details === | ||
Line 14: | Line 18: | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
− | * Constructor: | + | * Constructor: |
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * In operation | |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: Conocophillips will supply 2.0 mtpa from the [[Qatargas North Field Extension LNG Terminal Project]] |
* Customers: | * Customers: | ||
=== History === | === History === | ||
− | * | + | * 2022 - The vessel was contracted from Hoegh LNG |
+ | * 2022 - Qatarenergy, Conocophillips Sign Long-Term Supply agreement for the terminal | ||
+ | * 2023 - First cargo delivered | ||
+ | * 2024 - KN took over management of the terminal | ||
=== Other Information === | === Other Information === | ||
Line 32: | Line 39: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://www.rwe.com/en/research-and-development/project-plans/floating-lng-terminals/elbehafen-lng Project webpage] |
+ | # [https://abarrelfull.blogspot.com/2022/09/hoegh-lng-two-fsru-contracts-in-germany.html Höegh LNG: two FSRU contracts in Germany] | ||
+ | # [https://lng-news.blogspot.com/2022/11/qatarenergy-conocophillips-sign-long.html Qatarenergy, Conocophillips Sign Long-Term Supply Agreement Of Qatari LNG To Germany For At Least 15 Years] | ||
+ | # [https://lng-news.blogspot.com/2023/02/first-middle-east-lng-cargo-to-germany.html First Middle East LNG Cargo to Germany Successfully Delivered by ADNOC] | ||
+ | # [https://lng-news.blogspot.com/2024/01/kn-becomes-commercial-manager-of-four.html KN Becomes Commercial Manager of Four German LNG Terminals] | ||
[[category:LNG]] | [[category:LNG]] | ||
− | [[category: | + | [[category:Germany]] |
− | [[category: | + | [[category:RWE]] |
Latest revision as of 09:35, 8 January 2024
Contents
Summary Information
- Ownership: Elbehafen LNG
- Website: https://www.rwe.com/en/
- Location: Elbehafen, Brunsbüttel, Germany
- Capacity: 6.0 million tons/annum
- Status: In operation
Brief Description
- The FSRU is 300-metre-long, capable of taking on up to 170,000 cubic metres of LNG from tankers in a single unloading operation
- Phase 1 of the project will use Brunsbüttel Ports' existing dangerous goods jetty
- Phase 2 is expected to start in autumn 2023 and will involve the use of a newly built jetty to the west of the Elbehafen.
- Phase 3 involves the construction of a new gas connection pipeline "ET180", which will enable supply of 7.5 BCM per annum
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- In operation
Suppliers / Customers
- Suppliers: Conocophillips will supply 2.0 mtpa from the Qatargas North Field Extension LNG Terminal Project
- Customers:
History
- 2022 - The vessel was contracted from Hoegh LNG
- 2022 - Qatarenergy, Conocophillips Sign Long-Term Supply agreement for the terminal
- 2023 - First cargo delivered
- 2024 - KN took over management of the terminal
Other Information
-