Difference between revisions of "Cidade de Santos MV20 FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 20: Line 20:
 
* **COSCO Dalian Shipyard:** Vessel conversion
 
* **COSCO Dalian Shipyard:** Vessel conversion
 
* **Aker:**  
 
* **Aker:**  
* Pusnes Offloading System
+
** Pusnes Offloading System
* Water Injections - Sulphate removal unit: inlet filters, media filters, cartridge filters, feed pumps, membrane trains, cleaning package, control panel deaerator - EPC
+
** Water Injections - Sulphate removal unit: inlet filters, media filters, cartridge filters, feed pumps, membrane trains, cleaning package, control panel deaerator - EPC
 
* **SOFEC:** Supply of the spread mooring
 
* **SOFEC:** Supply of the spread mooring
 
* **Jotun:** Painting
 
* **Jotun:** Painting
Line 41: Line 41:
  
 
# [[Aker FPSO Pusnes Offloading Systems]]
 
# [[Aker FPSO Pusnes Offloading Systems]]
 +
# [[Aker Solutions Hydrate Inhibition References]]
 
# [[Aker Solutions Increased Oil Recovery (IOR) References]]
 
# [[Aker Solutions Increased Oil Recovery (IOR) References]]
 
# [[Jotun FPSO References]]
 
# [[Jotun FPSO References]]

Revision as of 14:22, 29 November 2023

Summary Information

+++ Brief Description

  • The vessel is a conversion of the VLCC FSO Bateau.
  • The FPSO will be capable of processing 350 million cubic feet per day of gas, 35,000 barrels of oil per day, and having a storage capacity of approximately 700,000 barrels.

+++ Contractors

  • **Modec:** Engineering, procurement, construction, mobilization and operations for the FPSO, including topsides processing equipment, hull and marine system.
  • **COSCO Dalian Shipyard:** Vessel conversion
  • **Aker:**
    • Pusnes Offloading System
    • Water Injections - Sulphate removal unit: inlet filters, media filters, cartridge filters, feed pumps, membrane trains, cleaning package, control panel deaerator - EPC
  • **SOFEC:** Supply of the spread mooring
  • **Jotun:** Painting


+++ Status

  • In operation

+++ History

  • 2008 - Modec and Petrobras sign contract for the vessel
  • 2009 - Vessel conversion completed
  • 2010 - Production starts

+++ Other Information

  • -

+++ Links

  1. Aker FPSO Pusnes Offloading Systems
  2. Aker Solutions Hydrate Inhibition References
  3. Aker Solutions Increased Oil Recovery (IOR) References
  4. Jotun FPSO References
  5. Delivery of "FPSO CIDADE DE SANTOS MV20"
  6. MODEC Adds Gas FPSO to Brazil Operations
  7. Starting production at the Uruguá Field, Santos Basin