Difference between revisions of "Saguaro Energía LNG Export Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
* A three train onshore facility, that will be built in two phases, first two trains followed by a third | * A three train onshore facility, that will be built in two phases, first two trains followed by a third | ||
| + | * The 500-mile Sierra Madre pipeline will be utilized as the primary natural gas supply path for the transportation of up to 2.8 Bcf/d natural gas from the U.S. border to the facility | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
| − | ** Bechtel: Engineering design | + | ** '''Bechtel:''' Engineering design |
| + | ** '''GDI Sicim Pipelines and Bonatti:''' Engineering, Procurement, and Construction (“EPC”) contract for the Sierra Madre pipeline project | ||
* Licensor: [[LNG Terminals Using Phillips Optimised Cascade Technology | Conocophillips]] | * Licensor: [[LNG Terminals Using Phillips Optimised Cascade Technology | Conocophillips]] | ||
| Line 34: | Line 36: | ||
# [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements] | # [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements] | ||
# [https://lng-news.blogspot.com/2023/03/mexico-pacific-and-shell-sign-third.html Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement] | # [https://lng-news.blogspot.com/2023/03/mexico-pacific-and-shell-sign-third.html Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement] | ||
| + | # [https://lng-news.blogspot.com/2023/11/mexico-pacific-awards-sierra-madre.html Mexico Pacific Awards Sierra Madre Pipeline EPC Contract to GDI SICIM PIPELINES and BONATTI] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Mexico]] | [[category:Mexico]] | ||
Revision as of 07:27, 28 November 2023
Contents
Summary Information
- Ownership: Mexico Pacific
- Website: https://mexicopacific.com/
- Location: Puerto Libertad, Sonora, Mexico
- Capacity: 14.1 million tons/annum
- Status: (Planned)
Brief Description
- A three train onshore facility, that will be built in two phases, first two trains followed by a third
- The 500-mile Sierra Madre pipeline will be utilized as the primary natural gas supply path for the transportation of up to 2.8 Bcf/d natural gas from the U.S. border to the facility
Technical Details
- Storage capacity:
- Constructor:
- Bechtel: Engineering design
- GDI Sicim Pipelines and Bonatti: Engineering, Procurement, and Construction (“EPC”) contract for the Sierra Madre pipeline project
- Licensor: Conocophillips
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: Gas will be supplied from the Permian basin
- Customers: Exxon will buy 2 million tonnes per annum
History
- 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction
- 2023 - Sales agreements signed with Exxon & Shell
Other Information
- -
Links
- Mexico Pacific Limited Announces Collaboration with ConocoPhillips LNG Licensing and Bechtel to Champion Low Carbon LNG
- Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements
- Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement
- Mexico Pacific Awards Sierra Madre Pipeline EPC Contract to GDI SICIM PIPELINES and BONATTI