Difference between revisions of "Poerner Refinery References"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 57: | Line 57: | ||
#* Commissioning: 2010  | #* Commissioning: 2010  | ||
# [[Schwedt Refinery]]  | # [[Schwedt Refinery]]  | ||
| − | revamp fcc gas concentration plant  | + | #* revamp fcc gas concentration plant  | 
#* Revamp of the stripping column with further peripheral equipment to improve the propene recovery process  | #* Revamp of the stripping column with further peripheral equipment to improve the propene recovery process  | ||
#* Client: PCK Raffinerie Schwedt  | #* Client: PCK Raffinerie Schwedt  | ||
| Line 90: | Line 90: | ||
#* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management  | #* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management  | ||
#* Commissioning: 2007  | #* Commissioning: 2007  | ||
| − | + | # [[Schwedt Refinery]]  | |
| − | + | #* revamp hf alkylation  | |
| − | revamp hf alkylation  | + | #* Revamp of existing HF alkylation  | 
| − | + | #* Client: PCK Raffinerie GmbH, Schwedt  | |
| − | Revamp of existing HF alkylation  | + | #* Location: Schwedt, Germany  | 
| − | Client: PCK Raffinerie GmbH, Schwedt  | + | #* Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision  | 
| − | Location: Schwedt, Germany  | + | #* Commissioning: 2007  | 
| − | Scope of work:  | + | # [[Buna SOW Leuna Refinery]]   | 
| − | Basic engineering (UOP Schedule A)  | + | #* ok 95 - transfer line  | 
| − | Detailed engineering  | + | #* Transfer line OK 95 (with/without ETBE)  | 
| − | Procurement  | + | #* Client: TOTAL Raffinerie Mitteldeutschland GmbH  | 
| − | Construction supervision  | + | #* Location: Leuna, Germany  | 
| − | Commissioning: 2007  | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision  | 
| − | ok 95 - transfer line  | + | #* Commissioning: 2006  | 
| − | + | # [[Burghausen Refinery]]  | |
| − | Transfer line OK 95 (with/without ETBE)  | + | #* Revamp of HDS-1 plant  | 
| − | Client: TOTAL Raffinerie Mitteldeutschland GmbH  | + | #* Client: OMV Deutschland GmbH  | 
| − | Location: Leuna, Germany  | + | #* Location: Burghausen, Germany  | 
| − | Scope of work:  | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision  | 
| − | Detailed engineering  | + | #* Commissioning 2006  | 
| − | Procurement  | + | # [[Bayernoil Ingolstadt Refinery]]  | 
| − | Construction supervision  | + | #* new refinery gas plant  | 
| − | Commissioning: 2006  | + | #* New refinery gas plant Modification of associated existing units  | 
| − | + | #* Client: BAYERNOIL  Raffineriegesellschaft  | |
| − | + | #* Location: Ingolstadt, Germany  | |
| − | Revamp of HDS-1 plant  | + | #* Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance  | 
| − | Client: OMV Deutschland GmbH  | + | #* Commissioning: 2005  | 
| − | Location: Burghausen, Germany  | + | # [[Emsland Lingen Refinery]]  | 
| − | Scope of work:  | + | #* revamp of coking plant  | 
| − | Detailed engineering  | + | #* Project: Revamp of coking plant with capacity increase  | 
| − | Procurement  | + | #* Client: BP Erdöl-Raffinerie-Emsland  | 
| − | Construction supervision  | + | #* Location: Lingen, Germany  | 
| − | Commissioning 2006  | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision  | 
| − | new refinery gas plant  | + | #* Commissioning: 2004  | 
| − | + | # [[Schwedt Refinery]]  | |
| − | New refinery gas plant Modification of associated existing units  | + | #* Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one    | 
| − | Client: BAYERNOIL  Raffineriegesellschaft  | + | #* Client: Raffinerie GmbH, Schwedt  | 
| − | + | #* Location: Schwedt, Germany  | |
| − | Scope of work:  | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance  | 
| − | Detailed engineering  | + | #* Commissioning: 2004  | 
| − | Procurement (support)  | ||
| − | Authority engineering  | ||
| − | Investment cost estimate  | ||
| − | Construction supervision (piping)  | ||
| − | Acceptance tests/Tests  | ||
| − | Start-up assistance  | ||
| − | Commissioning: 2005  | ||
| − | |||
| − | revamp of coking plant  | ||
| − | Project: Revamp of coking plant with capacity increase  | ||
| − | Client: BP Erdöl-Raffinerie-Emsland  | ||
| − | Location: Lingen, Germany  | ||
| − | Scope of work:  | ||
| − | Detailed engineering  | ||
| − | Procurement  | ||
| − | Construction supervision  | ||
| − | Commissioning: 2004  | ||
| − | |||
| − | |||
| − | Replacement of existing FCC main column by a larger (diameter of 6.2 m) and   | ||
| − | Client: Raffinerie GmbH, Schwedt  | ||
| − | Location: Schwedt, Germany  | ||
| − | Scope of work:  | ||
| − | Basic engineering  | ||
| − | Detailed engineering  | ||
| − | Procurement  | ||
| − | Construction supervision  | ||
| − | Acceptance tests/Tests  | ||
| − | Start-up assistance  | ||
| − | Commissioning: 2004  | ||
| − | |||
# [[Emsland Lingen Refinery]]  | # [[Emsland Lingen Refinery]]  | ||
#* Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package  | #* Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package  | ||
Revision as of 07:47, 20 November 2023
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
 - Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
 - Client: PCK Raffinerie GmbH Schwedt
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
 - Commissioning: 2014
 
 - Buna SOW Leuna Refinery
- alkylation plant
 - Revamp of alkylation plant to increase alkylate yield
 - Client: TOTAL Raffinerie Mitteldeutschland GmbH
 - Location: Leuna, Germany
 - Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2014
 
 - Schwechat Refinery
- rd4 program
 - EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
 - Client: OMV AG
 - Location: Schwechat / Austria
 - Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
 - Commissioning: 2014
 
 - Schwechat Refinery
- butadiene production unit
 - EPCM-Contractor for capacity extensions to Butadiene production unit
 - Client: OMV AG
 - Location: Schwechat / Austria
 - Scope of work:
- Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance,
 
 - Commissioning: 2014
 
 - Schwedt Refinery
- revamp vacuum plant
 - Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
 - Client: PCK Raffinerie GmbH Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support
 - Commissioning: 2013
 
 - Hamburg Ölwerke Schindler Refinery
- propane deasphalting plant (pda)
 - The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
 - Client: H&R Ölwerke Schindler GmbH
 - Location: Hamburg / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2011
 
 - Schwechat Refinery
- crude oil distillation plant 4 schwechat
 - EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
 - Client: OMV
 - Location: Schwechat / Austria
 - Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning,
 - Commissioning: 2010
 
 - Schwedt Refinery
- revamp crude oil distillation plant top1
 - Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
 - Client: PCK Raffinerie Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting
 - Commissioning: 2010
 
 - Schwedt Refinery
- revamp fcc gas concentration plant
 - Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
 - Client: PCK Raffinerie Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning
 - Commissioning: 2010
 
 - Schwechat Refinery
- revamp of hds plant
 - Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
 - Client: OMV
 - Location: Schwechat / Austria
 - Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2008
 
 - Puralube Zeitz Refinery
- used oil re- refining plant
 - Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
 - Client: Puralube Raffinerie GmbH
 - Location: Zeitz, Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support
 - Commissioning: 2008
 
 - Schwedt Refinery
- fcc-overcracking-plant
 - FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
 - Client: PCK Raffinerie GmbH, Schwedt
 - Location: Schwedt, Germany
 - Scope of work: Detailed engineering, Procurement, Construction supervision
 - Commissioning: 2007
 
 - Burghausen Refinery
- Debottlenecking of refinery gas plant
 - Client: OMV Deutschland GmbH
 - Location: Burghausen, Germany
 - Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
 - Commissioning: 2007
 
 - Schwedt Refinery
- revamp hf alkylation
 - Revamp of existing HF alkylation
 - Client: PCK Raffinerie GmbH, Schwedt
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision
 - Commissioning: 2007
 
 - Buna SOW Leuna Refinery
- ok 95 - transfer line
 - Transfer line OK 95 (with/without ETBE)
 - Client: TOTAL Raffinerie Mitteldeutschland GmbH
 - Location: Leuna, Germany
 - Scope of work: Detailed engineering, Procurement, Construction supervision
 - Commissioning: 2006
 
 - Burghausen Refinery
- Revamp of HDS-1 plant
 - Client: OMV Deutschland GmbH
 - Location: Burghausen, Germany
 - Scope of work: Detailed engineering, Procurement, Construction supervision
 - Commissioning 2006
 
 - Bayernoil Ingolstadt Refinery
- new refinery gas plant
 - New refinery gas plant Modification of associated existing units
 - Client: BAYERNOIL Raffineriegesellschaft
 - Location: Ingolstadt, Germany
 - Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance
 - Commissioning: 2005
 
 - Emsland Lingen Refinery
- revamp of coking plant
 - Project: Revamp of coking plant with capacity increase
 - Client: BP Erdöl-Raffinerie-Emsland
 - Location: Lingen, Germany
 - Scope of work: Detailed engineering, Procurement, Construction supervision
 - Commissioning: 2004
 
 - Schwedt Refinery
- Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one
 - Client: Raffinerie GmbH, Schwedt
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance
 - Commissioning: 2004
 
 - Emsland Lingen Refinery
- Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
 - Location: Lingen, Germany
 - Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering
 - Commissioning: 2002
 
 - Schwechat Refinery
- desulphurization unit
 - Desus 2
 - Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
 - Client: PCK Raffinerie GmbH
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance
 - Commissioning: 2002