(Created page with "Summary Information * Operator: Devon * Country: Canada * Location: Conklin, Alberta * Production start: 2007 * Partners: Devon 100% * Type: Oil * Estimated Reserves: 300 M...")
 
Line 1: Line 1:
 
Summary Information
 
Summary Information
* Operator: Devon
+
* Operator: Canadian Natural Resources
 
* Country: Canada  
 
* Country: Canada  
 
* Location: Conklin, Alberta
 
* Location: Conklin, Alberta
Line 29: Line 29:
 
* 2011 - First oil from phase 2
 
* 2011 - First oil from phase 2
 
* 2011 - Phase 3 received regulatory approval from the Alberta Energy Resources Conservation Board and Alberta Environment and Water
 
* 2011 - Phase 3 received regulatory approval from the Alberta Energy Resources Conservation Board and Alberta Environment and Water
 +
* 2019 - Devon Energy sells to CNR
  
 
+++ Geology
 
+++ Geology
Line 40: Line 41:
 
# [http://killajoules.wikidot.com/archive:devon-energy-to-move-forward-with-third-phase-of-jac Devon Energy to Move Forward with Third Phase of Jackfish Oil Sands Project]
 
# [http://killajoules.wikidot.com/archive:devon-energy-to-move-forward-with-third-phase-of-jac Devon Energy to Move Forward with Third Phase of Jackfish Oil Sands Project]
 
# [http://killajoules.wikidot.com/blog:1695 Devon Energy Obtains Approval for Third Jackfish Oil Sands Project]
 
# [http://killajoules.wikidot.com/blog:1695 Devon Energy Obtains Approval for Third Jackfish Oil Sands Project]
 +
# [https://abarrelfull.blogspot.com/2023/11/devon-energy-announces-strategic-exit.html
 +
 +
[[Category:Field]]
 +
[[Category:Canada]]
 +
[[Category:CNR]]

Revision as of 16:30, 5 November 2023

Summary Information

  • Operator: Canadian Natural Resources
  • Country: Canada
  • Location: Conklin, Alberta
  • Production start: 2007
  • Partners: Devon 100%
  • Type: Oil
  • Estimated Reserves: 300 Million per Phase
  • Production Volume: 35,000 bpd per phase

+++ Description

  • The Jackfish Project uses Steam Assisted Gravity Drainage (SAGD) Technology
  • The combined fluids from the well pads is separated into bitumen, gas and water.
  • Bitumen flows to a pipeline transportation system. The gas is combined with natural fuel gas and burned in the steam generators.
  • The water is transferred to the Water De-oiling System for further treatment.
  • The project is being developed in 3 phases, each with production capacity of 35,000 bpd

+++ Contractors

  • **WorleyParson:** Prefabrication and piperack and equipment module construction services for phase 2
  • **Aker Solutions:**
    • Phase 2 - 1 FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel + piping) & sample skid (c/w pump & cooler) - 15 OD x 115
    • Phase 3 - FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel + piping) & sample skid (c/w pump & cooler)

+++ History

  • 2004 - Approval given for phase 1 of the project
  • 2007 - First oil produced
  • 2008 - Approval granted for Phase 2
  • 2010 - Investment decision for Phase 3
  • 2011 - First oil from phase 2
  • 2011 - Phase 3 received regulatory approval from the Alberta Energy Resources Conservation Board and Alberta Environment and Water
  • 2019 - Devon Energy sells to CNR

+++ Geology

+++ Links

  1. Aker Solutions Oil And Gas Processing References
  2. Jackfish 2 Project Public Disclosure Document
  3. Devon Energy Obtains Approval for Second Jackfish Oil Sands Production Project
  4. Devon Energy awards Cord WorleyParsons Jackfish 2 Project contract
  5. Devon Energy to Move Forward with Third Phase of Jackfish Oil Sands Project
  6. Devon Energy Obtains Approval for Third Jackfish Oil Sands Project