Difference between revisions of "Hassi Messaoud Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Sonatrach * Country: Algeria * Location: 850 Km South East of Algiers * Production start:  * Partners: Sonatrach * Type: Oil  * Estimated Reser...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 14: | Line 14: | ||
+++ Contractors  | +++ Contractors  | ||
* **Saipem:**    | * **Saipem:**    | ||
| − | + | ** Engineering, procurement and construction of a crude oil treatment and stabilisation plant composed of three trains with a capacity of 100,000 oil barrels per-day each, one maintenance unit, four stocking units of 50,000 cubic meters each and a 45-km pipeline transporting oil, water and gas  | |
| − | + | ** Engineering, procurement and construction of three LPG production trains including compression  | |
* **Aker Solutions:** EPC - 3 Trains including Desalter/Degasser Vessel; Wash Water Pump Package &	Demulsifier Injection Package; supervision of construction; commissioning & start-up and training of owner's personnel. 10 ID x 30  | * **Aker Solutions:** EPC - 3 Trains including Desalter/Degasser Vessel; Wash Water Pump Package &	Demulsifier Injection Package; supervision of construction; commissioning & start-up and training of owner's personnel. 10 ID x 30  | ||
* **JGC:** Gas Processing Plant  | * **JGC:** Gas Processing Plant  | ||
| Line 32: | Line 32: | ||
+++ Links  | +++ Links  | ||
# [http://www.sonatrach-dz.com/NEW/V_English/nos-activitees.html Sonatrach Upstream]  | # [http://www.sonatrach-dz.com/NEW/V_English/nos-activitees.html Sonatrach Upstream]  | ||
| − | # [[[Aker Solutions Oil And Gas Processing References  | + | # [[[Aker Solutions Oil And Gas Processing References]]  | 
| − | #   | + | # [[JGC Oil And Gas Processing References]]  | 
| − | #   | + | # [[Saipem Gas And Oil Production And Treating Facilities References]]  | 
| − | #   | + | # [[Saipem Gas Gathering And Conditioning References]]  | 
| − | #   | + | # [[Saipem Gas Compression Stations References]]  | 
# [http://killajoules.wikidot.com/archive:aker-kvaerner-delivers-process-systems-to-sonatrach Aker Kvaerner delivers process systems to Sonatrach]  | # [http://killajoules.wikidot.com/archive:aker-kvaerner-delivers-process-systems-to-sonatrach Aker Kvaerner delivers process systems to Sonatrach]  | ||
# [http://killajoules.wikidot.com/archive:saipem-awarded-a-new-onshore-contract-in-algeria-wor Saipem awarded a new onshore contract in Algeria worth approximately euro 700 million]  | # [http://killajoules.wikidot.com/archive:saipem-awarded-a-new-onshore-contract-in-algeria-wor Saipem awarded a new onshore contract in Algeria worth approximately euro 700 million]  | ||
# [http://killajoules.wikidot.com/archive:saipem-awarded-a-new-onshore-contract-in-algeria-val Saipem awarded a new onshore contract in Algeria valued at approximately 1.3 billion euro]  | # [http://killajoules.wikidot.com/archive:saipem-awarded-a-new-onshore-contract-in-algeria-val Saipem awarded a new onshore contract in Algeria valued at approximately 1.3 billion euro]  | ||
# [http://killajoules.wikidot.com/archive:ex-im-bank-backs-texas-oil-and-gas-exports-to-mexico EX-IM Bank Backs Texas Oil And Gas Exports To Mexico, Algeria]  | # [http://killajoules.wikidot.com/archive:ex-im-bank-backs-texas-oil-and-gas-exports-to-mexico EX-IM Bank Backs Texas Oil And Gas Exports To Mexico, Algeria]  | ||
Revision as of 11:02, 20 October 2023
Summary Information
- Operator: Sonatrach
 - Country: Algeria
 - Location: 850 Km South East of Algiers
 - Production start:
 - Partners: Sonatrach
 - Type: Oil
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Hassi Messaoud field (850 Km South East of Algiers) found on 2500 Km2. It is one of the world giants. It is made up of: Hassi Messaoud, El Gassi, El Agreb, Sotti, El Borma, Mesdar, Rhourd Chegga and Hassi Guettar.
 
+++ Contractors
- **Saipem:**
- Engineering, procurement and construction of a crude oil treatment and stabilisation plant composed of three trains with a capacity of 100,000 oil barrels per-day each, one maintenance unit, four stocking units of 50,000 cubic meters each and a 45-km pipeline transporting oil, water and gas
 - Engineering, procurement and construction of three LPG production trains including compression
 
 - **Aker Solutions:** EPC - 3 Trains including Desalter/Degasser Vessel; Wash Water Pump Package & Demulsifier Injection Package; supervision of construction; commissioning & start-up and training of owner's personnel. 10 ID x 30
 - **JGC:** Gas Processing Plant
 - **Halliburton:** Oil well workover/stimulation
 
+++ History
- 1956 - Field Discovered
 - 2001 - Ex-Im Bank provided long-term loan guarantees to companies providing services for field development
 - 2006 - Aker Kvaerner was awarded a contract for delivery of process equipment for the facility
 - 2007 - Saipem awarded EPC contract for oil treatment plant
 - 2008 - Saipem awarded EPC contract for LPG plant
 
+++ Geology
+++ Links
- Sonatrach Upstream
 - [[[Aker Solutions Oil And Gas Processing References]]
 - JGC Oil And Gas Processing References
 - Saipem Gas And Oil Production And Treating Facilities References
 - Saipem Gas Gathering And Conditioning References
 - Saipem Gas Compression Stations References
 - Aker Kvaerner delivers process systems to Sonatrach
 - Saipem awarded a new onshore contract in Algeria worth approximately euro 700 million
 - Saipem awarded a new onshore contract in Algeria valued at approximately 1.3 billion euro
 - EX-IM Bank Backs Texas Oil And Gas Exports To Mexico, Algeria