Difference between revisions of "Knarr Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: Shell * Country: Norway * Location: North Sea * Production start: 2015 * Partners: Shell 45.00 %, Idemitsu Petroleum Norge AS 25.00 %,...")
 
Line 29: Line 29:
 
* 2012 - Subsea 7 awarded SURF contract
 
* 2012 - Subsea 7 awarded SURF contract
 
* 2015 - Production started
 
* 2015 - Production started
 +
* 2015 - Shell acquired BG Group and became the operator
 
* 2022 - Production ceased
 
* 2022 - Production ceased
  
Line 43: Line 44:
 
# [http://killajoules.wikidot.com/blog:2759 Subsea 7 S.A. awarded contract offshore Norway]
 
# [http://killajoules.wikidot.com/blog:2759 Subsea 7 S.A. awarded contract offshore Norway]
 
# [http://killajoules.wikidot.com/blog:5785 BG Group produces first oil from the Knarr field in Norway]
 
# [http://killajoules.wikidot.com/blog:5785 BG Group produces first oil from the Knarr field in Norway]
 +
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]

Revision as of 07:07, 17 October 2023

Summary Information

  • Operator: Shell
  • Country: Norway
  • Location: North Sea
  • Production start: 2015
  • Partners: Shell 45.00 %, Idemitsu Petroleum Norge AS 25.00 %, RWE Dea Norge AS 10.00 %, Wintershall Norge ASA 20.00 %
  • Type: Oil / Gas
  • Estimated Reserves: Original Recoverable reserves
    • 8.3 million Sm³ oil
    • 0.2 billion Sm³ gas
    • 0.4 million tonnes NGL
  • Production Volume:

+++ Description

+++ Contractors

  • **Wood Group Kenny:** Design package for in field and export pipelines, control systems, risers and umbilicals as well as budget and schedule estimates
  • **FMC Technologies:** Supply of three each of subsea production trees and water injection trees and will also provide six subsea control modules, five wellheads, two manifolds and other related equipment and controls.
  • **Subsea 7:** Engineering, procurement, construction and installation of a 4.5 km flowline bundle containing production, water injection and service lines and controls system, a standalone water injection flowline, flexible riser systems, the static and dynamic umbilicals systems, as well as various subsea structures, associated tie-in spools and GRP protection covers and the connection and testing of the complete subsea architecture.
  • **KWSubsea:** Detailed design of the 101km, 12" export gas pipeline

+++ History

  • 2010 - Wood Group Kenny awarded FEED
  • 2011 - FMC awarded subsea equipment contract
  • 2011 - Teekay awarded coontract for supply of FPSO
  • 2012 - Subsea 7 awarded SURF contract
  • 2015 - Production started
  • 2015 - Shell acquired BG Group and became the operator
  • 2022 - Production ceased

+++ Geology

  • The reservoir lies at a depth of about 3 800 metres and contains oil in Lower Jurassic sandstones of the Cook Formation.
  • The production strategy will include pressure maintenance by water injection.

+++ Links

  1. Knarr, Norwegian Petroleum
  2. KWSubsea Subsea References
  3. Wood Group Kenny awarded front end engineering design for Jordbaer field, Norway
  4. FMC Technologies Awarded $135 Million Subsea Equipment Contract for BG Norge's Knarr Development
  5. Teekay Awarded Contract for Knarr FPSO Project
  6. Subsea 7 S.A. awarded contract offshore Norway
  7. BG Group produces first oil from the Knarr field in Norway
  8. Recommended cash and share offer for BG Group by Royal Dutch Shell