Difference between revisions of "Kazakhstan IPCI Petrochemical Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
=== Project Details === | === Project Details === | ||
* The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology. | * The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology. | ||
− | |||
* Propane is supplied from the [[Tengiz Oil Field]] | * Propane is supplied from the [[Tengiz Oil Field]] | ||
Line 13: | Line 12: | ||
* Hualu Engineering & Technology Co: Construction | * Hualu Engineering & Technology Co: Construction | ||
* CB&I: process licences | * CB&I: process licences | ||
− | + | ||
=== History === | === History === | ||
Line 21: | Line 20: | ||
* 2020 - Major equipment installed | * 2020 - Major equipment installed | ||
* 2022 - Production starts | * 2022 - Production starts | ||
− | + | ||
=== Links === | === Links === | ||
Line 29: | Line 28: | ||
# [https://abarrelfull.blogspot.com/2020/10/propane-propylene-splitter-of-pdh-plant.html Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place] | # [https://abarrelfull.blogspot.com/2020/10/propane-propylene-splitter-of-pdh-plant.html Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place] | ||
# [https://abarrelfull.blogspot.com/2023/10/president-launches-gas-chemical-complex.html President Launches Gas Chemical Complex in Atyrau Region] | # [https://abarrelfull.blogspot.com/2023/10/president-launches-gas-chemical-complex.html President Launches Gas Chemical Complex in Atyrau Region] | ||
− | + | ||
[[category:Petrochemical]] | [[category:Petrochemical]] | ||
[[category:Kazakhstan]] | [[category:Kazakhstan]] | ||
[[category:KMG]] | [[category:KMG]] |
Revision as of 09:52, 10 October 2023
Summary Information
- Owner: KPI (Kazakhstan Petrochemical Industries)
- Website: https://www.kpi.kz/en/
- Location: Aytaru, Kazakhstan
- Completion: 2022
Project Details
- The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology.
- Propane is supplied from the Tengiz Oil Field
Contractors
- Hualu Engineering & Technology Co: Construction
- CB&I: process licences
History
- 2013 – Petrofac consortium awarded EPC contract
- 2017 – CB&I awarded process licences
- 2017 – Groundbreaking ceremony
- 2020 - Major equipment installed
- 2022 - Production starts
Links
- Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan
- CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan
- The Groundbreaking Ceremony of IPCI project in Kazakhstan
- Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place
- President Launches Gas Chemical Complex in Atyrau Region