Difference between revisions of "Goliat FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Goliat * Field: Goliat Oil and Gas Field * Country: Norway * Ownership: ENI * Website: * Field operated By: ENI * Capacity: 110,000 bpd * Y...") |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
* It is the world’s largest cylindrical FPSO | * It is the world’s largest cylindrical FPSO | ||
* The Goliat FPSO has been designed according to strict environmental requirements in the Barents Sea, and with a minimum of emissions and no discharges during normal operation. | * The Goliat FPSO has been designed according to strict environmental requirements in the Barents Sea, and with a minimum of emissions and no discharges during normal operation. | ||
− | * The Goliat FPSO | + | * The Goliat FPSO is connected to the electric grid |
+++ Contractors | +++ Contractors | ||
Line 29: | Line 29: | ||
+++ Status | +++ Status | ||
− | * | + | * In operation |
+++ History | +++ History | ||
Line 47: | Line 47: | ||
# [[Aker Solutions Oil And Gas Processing References]] | # [[Aker Solutions Oil And Gas Processing References]] | ||
# [[Emtunga Offshore Platform References]] | # [[Emtunga Offshore Platform References]] | ||
+ | # [[Hyundai Heavy Industries FPSO References]] | ||
# [[[Rosetti Marino Platform References]] | # [[[Rosetti Marino Platform References]] | ||
# [http://killajoules.wikidot.com/archive:aker-solutions-contract-for-eni-s-goliat-field Aker Solutions contract for Eni's Goliat field] | # [http://killajoules.wikidot.com/archive:aker-solutions-contract-for-eni-s-goliat-field Aker Solutions contract for Eni's Goliat field] |
Revision as of 14:12, 15 September 2023
Summary Information
- Name: Goliat
- Field: Goliat Oil and Gas Field
- Country: Norway
- Ownership: ENI
- Website:
- Field operated By: ENI
- Capacity: 110,000 bpd
- Year of Completion:
+++ Brief Description
- The Goliat FPSO will have a production capacity of some 110,000 barrels of oil per day, a gas processing capacity of almost 4.0 million standard cubic meters per day and an oil storage capacity of one million barrels of oil.
- It is the world’s largest cylindrical FPSO
- The Goliat FPSO has been designed according to strict environmental requirements in the Barents Sea, and with a minimum of emissions and no discharges during normal operation.
- The Goliat FPSO is connected to the electric grid
+++ Contractors
- **Aker Solutions:**
* Goliat FPSO Design Competition FEED * Single stage electrostatic coalescer - size: 118 000 bopd
- **Hyundai Heavy:** EPC Contractor - project work covering engineering, procurement, construction, onshore commissioning
- **Rosetti Marino:** Pre-commissioning & commissioning
- **Emtunga:** Two DEH-modules
- **Sevan Marine:** Project and engineering management and early operation preparation services
- **BW Offshore:** Supply of a complete offloading system
- **ABB:** Complete package of electrical, automation, instrumentation and telecommunications products and systems
+++ Status
- In operation
+++ History
- 2008 - Aker Solutions awarded the contract for Goliat FPSO Design Competition FEED
- 2010 - Hyundai Heavy signs EPC Contract
- 2010 - BW Offshore awarded offloading system contract
- 2010 - Eni Norge and Sevan Marine sign Project Services Contract
- 2015 - The vessel left HHI shipyard
+++ Other Information
- -
+++ Links
- ABB FPSO References
- Aker Solutions Oil And Gas Processing References
- Emtunga Offshore Platform References
- Hyundai Heavy Industries FPSO References
- [[[Rosetti Marino Platform References]]
- Aker Solutions contract for Eni's Goliat field
- Hyundai Heavy Industry Signs Goliat FPSO Contract with Eni Norge
- Eni Norge and Sevan Marine sign Project Services Contract for Goliat
- BW Offshore awarded technology contract for ENI's Goliat
- ABB wins $60 million oil and gas order in Norway
- Hyundai Heavy Industries Hands Over the World’s Largest Cylindrical FPSO
- Goliat platform on its way to the field location