Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Chevron * Country: Nigeria  * Location: OML 49, 161 km Southwest of Lagos * Production start:  * Partners:  * Type: Oil / Gas * Estimated Reser...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 13: | Line 13: | ||
* Prior to the associated gas development project, this gas was simply flared  | * Prior to the associated gas development project, this gas was simply flared  | ||
* The gas is compressed and piped onshore to a liquids extraction plant which removes LPG and condensate  | * The gas is compressed and piped onshore to a liquids extraction plant which removes LPG and condensate  | ||
| − | * Associated gas from the plant is to feed the   | + | * Associated gas from the plant is to feed the [[Escravos Gtl Plant]]  | 
* The field utilises an FSO for the LPG  | * The field utilises an FSO for the LPG  | ||
| Line 36: | Line 36: | ||
+++ Links  | +++ Links  | ||
| − | #   | + | # [[Sofec FPSO References]]  | 
| − | #   | + | # [[International Protective Coatings Fixed Platform References]]  | 
| − | #   | + | # [[Saipem Fixed Offshore Production Facilities Project References]]  | 
# [http://killajoules.wikidot.com/archive:nnpc-chevron-begins-export-of-nigeria-s-lpg NNPC/Chevron Begins Export Of Nigeria's LPG]  | # [http://killajoules.wikidot.com/archive:nnpc-chevron-begins-export-of-nigeria-s-lpg NNPC/Chevron Begins Export Of Nigeria's LPG]  | ||
# [http://killajoules.wikidot.com/archive:chevron-approves-major-expansion-of-huge-escravos-ga Chevron Approves Major Expansion Of Huge Escravos Gas Project In Nigeria]  | # [http://killajoules.wikidot.com/archive:chevron-approves-major-expansion-of-huge-escravos-ga Chevron Approves Major Expansion Of Huge Escravos Gas Project In Nigeria]  | ||
Revision as of 06:22, 8 August 2023
Summary Information
- Operator: Chevron
 - Country: Nigeria
 - Location: OML 49, 161 km Southwest of Lagos
 - Production start:
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- Escravos facilities gather gas from two Chevron-operated shallow ater offshore fields, **Okan** and **Mefa**.
 - Prior to the associated gas development project, this gas was simply flared
 - The gas is compressed and piped onshore to a liquids extraction plant which removes LPG and condensate
 - Associated gas from the plant is to feed the Escravos Gtl Plant
 - The field utilises an FSO for the LPG
 
+++ Contractors
- **HHI:** Manufacture of a production/processing facility for the onshore gas plant & a drilling and production facility for an offshore drilling site
 - **KYE Engineering:** Platform fabrication
 - **Foster Wheeler:** Design verification
 - **McDermott-ETPM:** Pipelines for Escravos Project
 - **Acergy:** Procurement and installation of over 130 km of pipelines, the fabrication and installation of 15 risers and 3 subsea tie-ins and the installation of over 40 crossings
 - **Sofec:** FSO External Turret
 - **Saipem:** Escravos Gas Project Phase 1 Development - T&I
 
+++ History
- 1963 - The Okan field is discovered
 - 1997 - First LPG produced
 - 1997 - Chevron Approves Major Expansion Of Huge Escravos Gas Project
 - 2005 - Hyundai Heavy wins gas processing plant contract
 - 2009 - Acergy awarded engineering, procurement, fabrication, transportation, installation, tie-in and commissioning contract
 
+++ Geology
+++ Links
- Sofec FPSO References
 - International Protective Coatings Fixed Platform References
 - Saipem Fixed Offshore Production Facilities Project References
 - NNPC/Chevron Begins Export Of Nigeria's LPG
 - Chevron Approves Major Expansion Of Huge Escravos Gas Project In Nigeria
 - HHI wins a $620 million order for a gas facility project in Nigeria
 - Foster Wheeler Awarded Engineering Services Contract For HHI/CNL Escravos Gas Project – Phase 3
 - Acergy S.A. awarded $500 million contract offshore Nigeria