Difference between revisions of "N05-A Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 1: | Line 1: | ||
| === Summary Information === | === Summary Information === | ||
| − | * Operator:   | + | * Operator: One Dyas | 
| − | * Country:   | + | * Country: https://onedyas.com/ | 
| − | * Location:   | + | * Location: North Sea, Netherlands | 
| * Production start:   | * Production start:   | ||
| − | * Partners:   | + | * Partners: ONE-Dyas, Hansa Hydrocarbons and EBN | 
| − | * Type:  | + | * Type: Gas | 
| * Estimated Reserves:   | * Estimated Reserves:   | ||
| * Production Volume:   | * Production Volume:   | ||
| === Description === | === Description === | ||
| − | *   | + | * The largest new gas development in the Netherlands in the last 15 years. | 
| + | * The expected volume to be produced from the N05-A field and surrounding prospects is 4.5 to 13 BCM  | ||
| === Contractors === | === Contractors === | ||
| − | * Allseas:   | + | * Allseas: Pipeline installation and burial | 
| + | * Heerema Marine Contractors: Platform installation | ||
| + | |||
| === History === | === History === | ||
| Line 23: | Line 26: | ||
| === Links === | === Links === | ||
| # [https://abarrelfull.blogspot.com/2023/03/one-dyas-invests-in-energy-transition.html ONE-Dyas invests in energy transition together with Dutch companies] | # [https://abarrelfull.blogspot.com/2023/03/one-dyas-invests-in-energy-transition.html ONE-Dyas invests in energy transition together with Dutch companies] | ||
| + | # [https://abarrelfull.blogspot.com/2023/03/north-sea-gas-development-calls-for.html North Sea gas development calls for Dutch expertise] | ||
Revision as of 16:35, 18 March 2023
Summary Information
- Operator: One Dyas
- Country: https://onedyas.com/
- Location: North Sea, Netherlands
- Production start:
- Partners: ONE-Dyas, Hansa Hydrocarbons and EBN
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The largest new gas development in the Netherlands in the last 15 years.
- The expected volume to be produced from the N05-A field and surrounding prospects is 4.5 to 13 BCM
Contractors
- Allseas: Pipeline installation and burial
- Heerema Marine Contractors: Platform installation
History
- 2023 - Final investment decision
