Difference between revisions of "Shaheen Petrochemical Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 8: | Line 8: | ||
| === The Project === | === The Project === | ||
| * Description: The project is located on the site of the [[S-Oil Ulsan Refinery]]. The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers | * Description: The project is located on the site of the [[S-Oil Ulsan Refinery]]. The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers | ||
| − | *  | + | * The plant will use TC2C technology, the first time it has been used commercially | 
| + | * Constructors: | ||
| + | ** Hyundai E&C consortium: Package 1 construction | ||
| + | ** DL E&C: TC2C construction | ||
| * Licensors: | * Licensors: | ||
| + | ** Aramco and Lummus Technology: TC2C technology | ||
| === Production Units === | === Production Units === | ||
| − | + | * TC2C Unit | |
| + | * Mixed feed steam crqcker | ||
| === Raw Materials Supply === | === Raw Materials Supply === | ||
| − | *  | + | * The plant will process residual products into naphtha | 
| === Products Produced === | === Products Produced === | ||
| Line 30: | Line 35: | ||
| === Links === | === Links === | ||
| # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/south-korean-president-and-aramco-ceo.html South Korean President and Aramco CEO attend S-OIL’s $7bn Shaheen groundbreaking] | # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/south-korean-president-and-aramco-ceo.html South Korean President and Aramco CEO attend S-OIL’s $7bn Shaheen groundbreaking] | ||
| + | # [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/dl-e-participates-in-its-largest.html DL E&C Participates in its Largest Petrochemical Project Ever] | ||
| [[category:Petrochemical]] | [[category:Petrochemical]] | ||
| [[category:South Korea]] | [[category:South Korea]] | ||
| [[category:Saudi Aramco]] | [[category:Saudi Aramco]] | ||
Revision as of 07:26, 16 March 2023
Contents
Summary Information
- Ownership: S-Oil (Saudi Aramco)
- Website:
- Wikipage:
- Location: Ulusan, South Korea
The Project
- Description: The project is located on the site of the S-Oil Ulsan Refinery. The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers
- The plant will use TC2C technology, the first time it has been used commercially
- Constructors:
- Hyundai E&C consortium: Package 1 construction
- DL E&C: TC2C construction
 
- Licensors:
- Aramco and Lummus Technology: TC2C technology
 
Production Units
- TC2C Unit
- Mixed feed steam crqcker
Raw Materials Supply
- The plant will process residual products into naphtha
Products Produced
- -
Other Information
- -
History
- 2022 - Project launched
- 2023 - Groundbreaking ceremony held for the project
