Difference between revisions of "Hamina LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
Line 14: Line 14:
 
* Unloading capacity:
 
* Unloading capacity:
 
* Send out capacity:
 
* Send out capacity:
* Constructor:
+
* Constructor:  
 +
** Wärtsilä: site filling, soil refurbishment, civil works, infrastructure, full containment storage tank with a combined net volume of 30 000 m3, regasification and gas metering, BOG (boil-off gas handling) system, electrical and control system, unloading, loading system and bunkering and truck loading
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
Line 26: Line 27:
 
=== History ===
 
=== History ===
  
 +
* 2017 - Wärtsilä awarded a turn-key contract for the project
 
* 2022 - The terminal entered service
 
* 2022 - The terminal entered service
  
Line 32: Line 34:
 
-
 
-
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2023/02/wartsila-signs-contract-to-supply-lng.html Wärtsilä signs a contract to supply LNG terminal to Finland]
 
# [https://abarrelfull.blogspot.com/2023/02/hamina-lng-oy-has-started-commercial.html Hamina LNG Oy has started commercial operations]
 
# [https://abarrelfull.blogspot.com/2023/02/hamina-lng-oy-has-started-commercial.html Hamina LNG Oy has started commercial operations]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Finland]]
 
[[category:Finland]]

Latest revision as of 14:40, 4 February 2023

Summary Information

Brief Description

  • A small scale onshore LNG terminal

Technical Details

  • Storage capacity: 30,000m3
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Wärtsilä: site filling, soil refurbishment, civil works, infrastructure, full containment storage tank with a combined net volume of 30 000 m3, regasification and gas metering, BOG (boil-off gas handling) system, electrical and control system, unloading, loading system and bunkering and truck loading

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2017 - Wärtsilä awarded a turn-key contract for the project
  • 2022 - The terminal entered service

Other Information

-

Links

  1. Wärtsilä signs a contract to supply LNG terminal to Finland
  2. Hamina LNG Oy has started commercial operations