Difference between revisions of "Marjan Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: Saudi Aramco | * Operator: Saudi Aramco | ||
* Country: Saudi Arabia | * Country: Saudi Arabia | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The field extends into Iranian waters where it is known as [[Foroozan Oil Field]] | * The field extends into Iranian waters where it is known as [[Foroozan Oil Field]] | ||
* Associated gas is processed at the [[Khursaniyah Gas Processing Plant]] | * Associated gas is processed at the [[Khursaniyah Gas Processing Plant]] | ||
| Line 16: | Line 16: | ||
* A new [[Tanajib Gas Processing Plant]] will have a gas processing capacity of 2.5 billion standard cubic feet per day | * A new [[Tanajib Gas Processing Plant]] will have a gas processing capacity of 2.5 billion standard cubic feet per day | ||
| − | + | === Contractors === | |
* **HHI:** Platform, Facilities Pile, Bridge | * **HHI:** Platform, Facilities Pile, Bridge | ||
* **McDermott:** | * **McDermott:** | ||
| Line 23: | Line 23: | ||
| − | + | === History === | |
* 2019 - Contracts awarded for increment program | * 2019 - Contracts awarded for increment program | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [[Hyundai Heavy Industries Platform References]] | # [[Hyundai Heavy Industries Platform References]] | ||
# [http://killajoules.wikidot.com/blog:3343 McDermott Awarded North Dome and PDM Projects for Saudi Aramco] | # [http://killajoules.wikidot.com/blog:3343 McDermott Awarded North Dome and PDM Projects for Saudi Aramco] | ||
Revision as of 16:33, 17 January 2023
Contents
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location: Arabian Gulf
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field extends into Iranian waters where it is known as Foroozan Oil Field
- Associated gas is processed at the Khursaniyah Gas Processing Plant
Marjan Increment Program
- Crude oil production capacity at Marjan will be expanded by 300,000 barrels per day
- A new Tanajib Gas Processing Plant will have a gas processing capacity of 2.5 billion standard cubic feet per day
Contractors
- **HHI:** Platform, Facilities Pile, Bridge
- **McDermott:**
- Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
- Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.
History
- 2019 - Contracts awarded for increment program
Geology
Links
- Hyundai Heavy Industries Platform References
- McDermott Awarded North Dome and PDM Projects for Saudi Aramco
- McDermott Awarded Cable Installation Project for Saudi Aramco
- McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia
- Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity