Difference between revisions of "Marjan Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Saudi Aramco * Country: Saudi Arabia * Location: Arabian Gulf * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * P...")
 
Line 16: Line 16:
 
* **HHI:** Platform, Facilities Pile, Bridge
 
* **HHI:** Platform, Facilities Pile, Bridge
 
* **McDermott:**  
 
* **McDermott:**  
* Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
+
** Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
* Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.
+
** Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.
  
  
 
+++ History
 
+++ History
*  
+
* 2019 - Contracts awarded for increment program
  
 
+++ Geology
 
+++ Geology
Line 31: Line 31:
 
# [http://killajoules.wikidot.com/blog:3344 McDermott Awarded Cable Installation Project for Saudi Aramco]
 
# [http://killajoules.wikidot.com/blog:3344 McDermott Awarded Cable Installation Project for Saudi Aramco]
 
# [http://killajoules.wikidot.com/blog:5765 McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia]
 
# [http://killajoules.wikidot.com/blog:5765 McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia]
 +
# [https://abarrelfull.blogspot.com/2023/01/saudi-aramco-awards-contracts-valued-at.html Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity]
 +
 +
[[category:Field]]
 +
[[category:Saudi Arabia]]
 +
[[category:Saudi Aramco]]

Revision as of 14:47, 17 January 2023

Summary Information

  • Operator: Saudi Aramco
  • Country: Saudi Arabia
  • Location: Arabian Gulf
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **HHI:** Platform, Facilities Pile, Bridge
  • **McDermott:**
    • Procurement, fabrication, transportation and installation of three electrified production deck modules (PDM’s)
    • Engineering, procurement, construction, installation (“EPCI”) and replacement of the decks of two existing tie-in platforms, as well as the removal and salvage of existing gas turbine generators, and the installation of two new 115kV subsea power and communication cables.


+++ History

  • 2019 - Contracts awarded for increment program

+++ Geology

+++ Links

  1. Hyundai Heavy Industries Platform References
  2. McDermott Awarded North Dome and PDM Projects for Saudi Aramco
  3. McDermott Awarded Cable Installation Project for Saudi Aramco
  4. McDermott Awarded Initial Work for the Marjan Gas Oil Separation Plant (GOSP’s) Power Supply Generation System Offshore Saudi Arabia
  5. Saudi Aramco awards contracts valued at $18 billion to increase Marjan and Berri oilfields’ production capacity