Difference between revisions of "L10 area Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "=== Summary Information === * Operator: Neptune * Country:  * Location:  * Production start: 1975 * Partners:  * Type: Oil / Gas * Estimated Reserves:  * Production Volume:...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information ===  | === Summary Information ===  | ||
* Operator: Neptune  | * Operator: Neptune  | ||
| − | * Country:    | + | * Country: Netherlands   | 
* Location:    | * Location:    | ||
* Production start: 1975  | * Production start: 1975  | ||
| Line 7: | Line 7: | ||
* Type: Oil / Gas  | * Type: Oil / Gas  | ||
* Estimated Reserves:    | * Estimated Reserves:    | ||
| − | * Production Volume:    | + | * Production Volume:  | 
=== Description ===  | === Description ===  | ||
| Line 16: | Line 16: | ||
=== Contractors ===  | === Contractors ===  | ||
| − | + | * Saipem: Laying of pipeline  | |
=== History ===  | === History ===  | ||
Latest revision as of 21:10, 1 January 2023
Summary Information
- Operator: Neptune
 - Country: Netherlands
 - Location:
 - Production start: 1975
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The L10 Area comprises mature gas fields on the western side of the Dutch North Sea sector centred around the L10-A complex. The focus here is on optimising production and reducing complexity while accelerating recovery and extending recoverable reserves.
 - The Dutch offshore industry originated in the L10 area in the 1970s. Gas production on the Dutch continental shelf began in 1975, three years after the installation of the L10-A drilling platform. The complex now consists of four bridge-linked platforms: a drilling, a production, a riser and a compression platform. The complex includes facilities for up to 64 employees. L10-A is located 62.5 km from Den Helder.
 - The L10-A gathers gas from numerous fields in the area, including Neptune-operated unmanned platforms K12-C/CC, K12-D, K12-G, K12-K, L10-B, L10-E, L10-F, L10-L and L10-M.
 - Produced gas is dried on the riser platform before being exported through the Noordgastransport NGT Gas Pipeline to the processing station in Uithuizen.
 
Contractors
- Saipem: Laying of pipeline
 
History
- 1972 - Installation of the L10-A drilling platform, L10-AD
 - 1975 - L10-AP production platform and the L10-AR riser platform added
 - 1977 - L10-D & L10-E platforms added
 - 1980 - L10-BB - wellhead & L10-F - satellite
 - 1984 - L10-EE - wellhead & L10-G - satellite
 - 1987 - L10-AC compressor platform installed
 - 1988 - L10-L - satellite & L10-S-1 - subsea completion
 - 1997 - L10-S-2, L10-S-3 & L10-S-4 subsea completions
 - 2000 - L10-M - satellite