Difference between revisions of "Sangachal Oil and Gas Processing Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
* Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry. | * Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry. | ||
* Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals | * Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals | ||
| − | * The terminal is fed by | + | * The terminal is fed by [[Shah Deniz Gas Field]] and [[Azeri Chirag Guneshli Oil Field]] |
| − | * The terminal is the starting point of the | + | * The terminal is the starting point of the [[Baku Tbilisi Ceyhan Pipeline]] and the [[South Caucasus Gas Pipeline]] |
=== Contractors === | === Contractors === | ||
Revision as of 16:40, 29 October 2022
Contents
Summary Information
- Ownership: BP
- Website:
- Location:
- Capacity:
- Crude Type:
Brief Description
- Located 55km south of Baku, the Sangachal Terminal is a vital link in Azerbaijan’s oil and gas industry.
- Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
- The terminal is fed by Shah Deniz Gas Field and Azeri Chirag Guneshli Oil Field
- The terminal is the starting point of the Baku Tbilisi Ceyhan Pipeline and the South Caucasus Gas Pipeline
Contractors
- **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
- **Aker Solutions:**
* Heater Treater Upgrade * Engineering and subcontract fabrication of an H2S Scavenging vessel * 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations * Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration * Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
Ongoing Projects
- -
Other Information
- -
History
- 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2