Difference between revisions of "Tiffany Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (→Links)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
* Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen.  | * Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen.  | ||
* The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform.    | * The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform.    | ||
| Line 15: | Line 15: | ||
* Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]]  | * Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]]  | ||
| − | + | === Contractors ===  | |
* **Consorzio Ital Offshore:** Platform construction  | * **Consorzio Ital Offshore:** Platform construction  | ||
* **Saipem:** Tiffany Platform T&I  | * **Saipem:** Tiffany Platform T&I  | ||
| Line 24: | Line 24: | ||
* **Bibby Offshore:** Toni well conversation to gas lift  | * **Bibby Offshore:** Toni well conversation to gas lift  | ||
| − | + | === History ===  | |
* 1990 - Government approval granted for Tiffany & Toni  | * 1990 - Government approval granted for Tiffany & Toni  | ||
* 1993 - First oil from Tiffany  | * 1993 - First oil from Tiffany  | ||
| Line 31: | Line 31: | ||
* 2005 - Toni field converted to gas life  | * 2005 - Toni field converted to gas life  | ||
| − | + | === Geology ===  | |
| − | *    | + | *  | 
=== Links ===  | === Links ===  | ||
Revision as of 12:14, 22 September 2022
Summary Information
- Operator: CNR International
 - Country: UK
 - Location: Central North Sea
 - Production start:
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen.
 - The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform.
 - Oil from the fields is exported from the Tiffany platform via a short link to the Brae – Forties oil pipelines and onward to shore at Cruden Bay in North East Scotland.
 - Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]]
 
Contractors
- **Consorzio Ital Offshore:** Platform construction
 - **Saipem:** Tiffany Platform T&I
 - **SLP Engineering:** Thelma Manifold Structure
 - **Seaway Heavy Lifting:** T & I for the Thelma Manifold Structure
 - **VWS Westgarth:** Water Treatment
 - **Subsea 7:** Replacement subsea control modules (SCMs) and flexibles jumpers
 - **Bibby Offshore:** Toni well conversation to gas lift
 
History
- 1990 - Government approval granted for Tiffany & Toni
 - 1993 - First oil from Tiffany
 - 1995 - Approval for Thelma
 - 2004 - CNR acquired a major stake from ENI
 - 2005 - Toni field converted to gas life
 
Geology
Links
- List Of Oil Production Platforms In The UK
 - VWS Westgarth FPSO References
 - Seaway Heavy Lifting Oil And Gas References
 - FoundOcean Europe Subsea References
 - Saipem Europe Fixed Offshore Production Facilities Project R
 - Bibby Offshore Subsea References
 - Canadian Natural Resources Limited Announces The Acquisition Of UK North Sea Core Properties
 - Subsea 7 Announces North Sea Contract for CNR