Difference between revisions of "Exxon Singapore Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Exxon Website: http://www.exxonmobil.com List of Exxon Mobil Refineries Location: Jurong Island, Singapore Capacity: 30 million tons/annum & 605...")
 
Line 1: Line 1:
−
Summary Information
+
=== Summary Information ===
−
Ownership: Exxon
+
 
−
Website: http://www.exxonmobil.com
+
* Ownership: Exxon
−
List of Exxon Mobil Refineries
+
* Website: http://www.exxonmobil.com
−
Location: Jurong Island, Singapore
+
* List of [[[Exxon Mobil Refineries]]]
−
Capacity: 30 million tons/annum & 605,000 bbl/day
+
* Location: Jurong Island, Singapore
−
Nelson Complexity:
+
* Capacity: 30 million tons/annum & 605,000 bbl/day
−
Refining Depth:
+
* Nelson Complexity:  
−
Brief Description
+
* Refining Depth:
−
ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
+
 
−
Refining Units
+
+++ Brief Description
−
Atmospheric Distillation
+
* ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
−
Vacuum Distillation Unit
+
 
−
Hydrocracker -23,000 bpd
+
+++ Refining Units
−
Continuous catalytic reformer
+
 
−
Visbreaker - 55,000 bpd
+
* [[[Atmospheric Distillation]]]
−
Distillate Dewaxing Unit - 12,000
+
* Vacuum Distillation Unit
−
Hydrogen Unit - 27,900 (Nm3/Hr)
+
* Hydrocracker -23,000 bpd
−
Asphalt Unit
+
* Continuous catalytic reformer  
−
Terminal Capacity
+
* Visbreaker - 55,000 bpd
−
Crude Oil:
+
* Distillate Dewaxing Unit - 12,000
−
Refined Products:
+
* Hydrogen Unit - 27,900 (Nm3/Hr)
−
Crude Supply
+
* Asphalt Unit
−
Can handle a wide range of crudes
+
 
−
Products Produced
+
+++ Terminal Capacity
−
LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
+
 
−
Ongoing Projects
+
* Crude Oil:  
−
In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
+
* Refined Products:  
−
It will come on stream by 2014
+
 
−
Other Information
+
+++ Crude Supply
−
-
+
* Can handle a wide range of crudes  
−
History
+
 
−
1965 - Jurong Refinery comes on stream
+
+++ Products Produced
−
1971 - Jurong Island (PAC) Refinery comes on stream
+
* LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
−
1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
+
 
−
1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
+
+++ Ongoing Projects
−
1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
+
* In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
−
1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
+
* It will come on stream by 2014
−
1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
+
 
−
1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
+
+++ Other Information
−
2014 - Light Oil Desulphurization Unit commissioned
+
* -
−
Relevant Links
+
 
−
Chiyoda Crude Distillation Units
+
+++ History
−
Chiyoda Distillate Dewaxing Units
+
* 1965 - Jurong Refinery comes on stream
−
Chiyoda Sulfur Recovery Units
+
* 1971 - Jurong Island (PAC) Refinery comes on stream
−
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
* 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
−
Chiyoda Hydrogen Manufacturing Units
+
* 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
−
Chiyoda Sweetening Units
+
* 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
−
Chiyoda H2S Removal Units With Amine
+
* 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
−
Chiyoda Vacuum Flasher Vacuum Distillation Units
+
* 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
−
JGC Refinery References
+
* 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
−
Refinery Webpage
+
* 2014 - Light Oil Desulphurization Unit commissioned
−
New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
+
 
−
Exxon's Singapore visbreaker shut for repairs
+
 
−
Industrial Incident at Singapore Refinery
+
 
 +
=== Links ===
 +
 
 +
# [[[Chiyoda Crude Distillation Units]]]
 +
# [[[Chiyoda Distillate Dewaxing Units]]]
 +
# [[[Chiyoda Sulfur Recovery Units]]]
 +
# [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]]
 +
# [[[Chiyoda Hydrogen Manufacturing Units]]]
 +
# [[[Chiyoda Sweetening Units]]]
 +
# [[[Chiyoda H2S Removal Units With Amine]]]
 +
# [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]]
 +
# [[[JGC Refinery References]]]
 +
# [http://www.exxonmobil.com/AP-English/about_who_profile_refinery.aspx Refinery Webpage]
 +
# [http://www.exxonmobil.com/AP-English/news_releases_20101123.aspx New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply]
 +
# [http://gulfnews.com/business/oil-gas/exxon-s-singapore-visbreaker-shut-for-repairs-1.444000 Exxon's Singapore visbreaker shut for repairs]
 +
# [http://killajoules.wikidot.com/blog:687 Industrial Incident at Singapore Refinery]

Revision as of 15:00, 11 September 2022

Summary Information

* List of [[[Exxon Mobil Refineries]]]
  • Location: Jurong Island, Singapore
  • Capacity: 30 million tons/annum & 605,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

+++ Brief Description

  • ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.

+++ Refining Units

  • [[[Atmospheric Distillation]]]
  • Vacuum Distillation Unit
  • Hydrocracker -23,000 bpd
  • Continuous catalytic reformer
  • Visbreaker - 55,000 bpd
  • Distillate Dewaxing Unit - 12,000
  • Hydrogen Unit - 27,900 (Nm3/Hr)
  • Asphalt Unit

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • Can handle a wide range of crudes

+++ Products Produced

  • LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil

+++ Ongoing Projects

  • In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
  • It will come on stream by 2014

+++ Other Information

  • -

+++ History

  • 1965 - Jurong Refinery comes on stream
  • 1971 - Jurong Island (PAC) Refinery comes on stream
  • 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
  • 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
  • 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
  • 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
  • 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
  • 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
  • 2014 - Light Oil Desulphurization Unit commissioned


Links

  1. [[[Chiyoda Crude Distillation Units]]]
  2. [[[Chiyoda Distillate Dewaxing Units]]]
  3. [[[Chiyoda Sulfur Recovery Units]]]
  4. [[[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]]
  5. [[[Chiyoda Hydrogen Manufacturing Units]]]
  6. [[[Chiyoda Sweetening Units]]]
  7. [[[Chiyoda H2S Removal Units With Amine]]]
  8. [[[Chiyoda Vacuum Flasher Vacuum Distillation Units]]]
  9. [[[JGC Refinery References]]]
  10. Refinery Webpage
  11. New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
  12. Exxon's Singapore visbreaker shut for repairs
  13. Industrial Incident at Singapore Refinery