Difference between revisions of "Shandong LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 32: | Line 32: | ||
* 2010 - Sinopec has started building its first liquefied natural gas (LNG) receiving terminal in Qingdao  | * 2010 - Sinopec has started building its first liquefied natural gas (LNG) receiving terminal in Qingdao  | ||
* 2014 - Terminal commissioned  | * 2014 - Terminal commissioned  | ||
| + | * 2021 - Terminal expanded to 7.0 mtpa  | ||
=== Other Information ===  | === Other Information ===  | ||
Revision as of 14:26, 7 January 2022
Contents
Summary Information
- Ownership: Sinopec
 - Website: http://english.sinopec.com/
 - Location: Qingdao, Shandong Province
 - Capacity: 3.0 million tons/annum
 - Status: In operation
 
Brief Description
- A small liquefaction plant with 2 tanks
 
Technical Details
- Storage capacity: Two 160,000 cubic meter storage tanks
 - Unloading capacity: The jetty is able to dock LNG carriers with shipping capacity ranging from 80,000 to 270,000 cubic meters
 - Send out capacity:
 - Constructor:
- **SOFREGAZ:** The FEED and also provided services for detailed engineering, procurement, commissioning/start-up and training.
 - **LPEC:** EPCC contractor
 
 
Ongoing Projects/Project Status
- The project was completed in 2014
 
Suppliers / Customers
- Suppliers: 2 million tons of Gas is to be supplied by PNG LNG Terminal
 - Customers: The terminal is connected to the Qingning Natural Gas Pipeline
 
History
- 2008 - Shandong Qingdao LNG project environmental impact evaluation was announced to the public
 - 2009 - Purchase agreement signed with PNG LNG
 - 2010 - FEED & EPC contract awarded
 - 2010 - Sinopec has started building its first liquefied natural gas (LNG) receiving terminal in Qingdao
 - 2014 - Terminal commissioned
 - 2021 - Terminal expanded to 7.0 mtpa
 
Other Information
- -