Difference between revisions of "Barossa FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Name: | + | * Name: Barossa FPSO |
− | * Field: | + | * Field: [[Barossa Area Oil and Gas Field Development]] |
− | * Country: | + | * Country: Australia |
* Ownership: | * Ownership: | ||
* Website: | * Website: | ||
− | * Field Operated By: | + | * Field Operated By: Santos |
* Capacity: bpd | * Capacity: bpd | ||
− | * Year of Completion: | + | * Year of Completion: Expected 2023 |
=== Brief Description === | === Brief Description === |
Revision as of 14:38, 8 December 2021
Contents
Summary Information
- Name: Barossa FPSO
- Field: Barossa Area Oil and Gas Field Development
- Country: Australia
- Ownership:
- Website:
- Field Operated By: Santos
- Capacity: bpd
- Year of Completion: Expected 2023
Brief Description
- The Barossa FPSO is MODEC's largest size of "Gas FPSO" to date, which will be able to export over 600 million standard cubic feet of gas per day as well as store up to 650,000 barrels of condensate for export. It has been designed to withstand a 100-year cyclone event at a water depth of 260 meters and located some 300 kilometers off north of Darwin, Australia.
Contractors
- MODEC:
- Front End Engineering Design (FEED) contract for the Barossa FPSO
- Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
Status
- -
History
- -
Other Information
- -