Difference between revisions of "Barossa FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * MODEC: |
+ | ** Front End Engineering Design (FEED) contract for the [[Barossa FPSO]] | ||
+ | ** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems. | ||
=== Status === | === Status === |
Revision as of 14:36, 8 December 2021
Contents
Summary Information
- Name:
- Field:
- Country:
- Ownership:
- Website:
- Field Operated By:
- Capacity: bpd
- Year of Completion:
Brief Description
- -
Contractors
- MODEC:
- Front End Engineering Design (FEED) contract for the Barossa FPSO
- Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
Status
- -
History
- -
Other Information
- -