Difference between revisions of "Barossa FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 15: Line 15:
  
 
=== Contractors ===
 
=== Contractors ===
*  
+
* MODEC:
 +
** Front End Engineering Design (FEED) contract for the [[Barossa FPSO]]
 +
** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
  
 
=== Status ===
 
=== Status ===

Revision as of 14:36, 8 December 2021

Summary Information

  • Name:
  • Field:
  • Country:
  • Ownership:
  • Website:
  • Field Operated By:
  • Capacity: bpd
  • Year of Completion:

Brief Description

  • -

Contractors

  • MODEC:
    • Front End Engineering Design (FEED) contract for the Barossa FPSO
    • Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.

Status

  • -

History

  • -

Other Information

  • -

Links

  1. MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips