Difference between revisions of "Tolmount Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 33: | Line 33: | ||
# [https://abarrelfull.blogspot.com/2021/12/costain-awarded-feed-study-contract-for.html Costain awarded FEED study contract for Tolmount gas onshore plant at Dimlington] | # [https://abarrelfull.blogspot.com/2021/12/costain-awarded-feed-study-contract-for.html Costain awarded FEED study contract for Tolmount gas onshore plant at Dimlington] | ||
# [https://abarrelfull.blogspot.com/2021/12/rosetti-marino-is-pleased-to-announce.html Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project] | # [https://abarrelfull.blogspot.com/2021/12/rosetti-marino-is-pleased-to-announce.html Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/tolmount-east-success.html Tolmount East success] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
− | [[category:Harbour]] | + | [[category:Harbour Energy]] |
Revision as of 16:50, 2 December 2021
Summary Information
- Operator: Habour Energy
- Country: UK
- Location: Southern North Sea
- Production start: 2021
- Partners: Habour Energy 50%, Dana Petroleum 50%
- Type: Gas
- Estimated Reserves: The field is expected to produce around 90 million boe gross over its lifetime
- Production Volume: 56,000 boe a day at peak production
Description
- The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea.
- It is connected to an onshore gas plant at Dimlington, by a dedicated pipeline, known as the Humber Gathering System
- Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform.
Contractors
- Rosetti Marino: EPCIC contract for the platform
- Costain: FEED study for Tolmount gas onshore plant
History
- 2011 - Tolmont field discovered
- 2013 - Appraisal drilling carried out
- 2016 - Premier oil acquired a 50% stake
- 2018 - Rosetti Marino awarded the EPCIC contract for the platform
- 2020 - The HGS Tolmount platform was successfully installed
- 2021 - Tolmont east was sanctioned
Geology
Links
- Completion of Strategic Review of North Sea E&P Business – divestiture of UK Exploration & Production Business to Premier Oil
- Costain awarded FEED study contract for Tolmount gas onshore plant at Dimlington
- Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project
- Tolmount East success