Difference between revisions of "Juliet Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (→Links)  | 
				Abarrelfull (talk | contribs)   (→Links)  | 
				||
| Line 37: | Line 37: | ||
# [http://killajoules.wikidot.com/blog:3669 Technip awarded contract by GDF SUEZ E&P UK for the Juliet project]  | # [http://killajoules.wikidot.com/blog:3669 Technip awarded contract by GDF SUEZ E&P UK for the Juliet project]  | ||
# [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea]  | # [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea]  | ||
| − | # [ Neptune Energy uses innovative technology for decommissioning work ]  | + | # [https://a-barrel-full.blogspot.com/2021/12/neptune-energy-uses-innovative.html Neptune Energy uses innovative technology for decommissioning work ]  | 
Revision as of 09:01, 1 December 2021
Summary Information
- Operator: GDF Suez
 - Country: UK
 - Location: 40 kilometers East of the Humberside estuary
 - Production start: 2014
 - Partners: GDF SUEZ (51.56%), First Oil Expro Limited (29.44%) and Hansa Hydrocarbons Limited (19%)
 - Type: Gas
 - Estimated Reserves: Gross 2P reserves amount to 2 billion cubic metres
 - Production Volume:
 
+++ Description
- Juliet, located 39 km east of the Lincolnshire coastline received sanction in June 2012 and will be operated by GDF SUEZ (51.56%) in partnership with First Oil Expro Limited (29.44%) and Hansa Hydrocarbons Limited (19%).
 - First gas is scheduled for late 2013 and gross 2P reserves amount to 2 billion cubic metres
 - The Juliet development will comprise two horizontal subsea wells tied back some 22 km to the Pickerill A platform, on the [[[Pickerill Gas Field]]], operated by Perenco UK Ltd. Existing infrastructure will then transport the Juliet gas to the Theddlethorpe terminal on the Lincolnshire coast.
 
+++ Contractors
- **Technip:** Engineering, procurement, installation and construction for tie back
 - **Xodus Group:** Front end engineering and design (FEED) study
 
+++ History
- 2008 - Juliet exploration drilling successful
 - 2010 - Hansa acquired a stake from First Oil Expro
 - 2012 - UK government approval given
 - 2012 - Investment decision taken
 - 2013 - Technip awarded tie back contract
 - 2014 - First gas produced
 
+++ Geology
Links
- UK Oil and Gas Fields by Approval Date
 - Successful Southern North Sea exploration well
 - Hansa Hydrocarbons acquires interest in Southern North Sea development project
 - Xodus Group wins subsea FEED contract for Juliet field
 - GDF SUEZ to operate two new gas fields in the North Sea: Juliet and Cygnus, UK’s largest gas discovery in last 25 years
 - Technip awarded contract by GDF SUEZ E&P UK for the Juliet project
 - GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea
 - Neptune Energy uses innovative technology for decommissioning work