Difference between revisions of "Svalin Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: Statoil * Country: Norway * Location: Located in Block 25/11 in the North Sea, between the [[[Grane Oil Field | Grane]]] and [Balder...")
 
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
* Operator: Statoil  
 
* Operator: Statoil  
 
* Country: Norway
 
* Country: Norway
* Location: Located in Block 25/11 in the North Sea, between the [[[Grane Oil Field | Grane]]] and [[[Balder Oil Field | Balder]]] fields
+
* Location: Located in Block 25/11 in the North Sea, between the [[Grane Oil Field]] and [[Balder Oil Field]]
* Production start:  
+
* Production start: 2014
 
* Partners: Statoil, operator (57%), Petoro AS (30%), ExxonMobil E&P Norway (13%)
 
* Partners: Statoil, operator (57%), Petoro AS (30%), ExxonMobil E&P Norway (13%)
 
* Type: Oil & Gas
 
* Type: Oil & Gas
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
* The Svalin field lies about six kilometres south-west of the [[[Grane Oil Field | Grane]]] platform at a water depth of 125 metres.
+
* The Svalin field lies about six kilometres south-west of the [[Grane Oil Field]] platform at a water depth of 125 metres.
* The Svalin development will be tied back to the [[[Grane Oil Field | Grane]]] platform. Svalin M will be produced by a well drilled from the Grane platform, while Svalin C will be a subsea development with a six-kilometre-long flowline to the Grane platform. The hydrocarbons will utilise shared processing and export facilities
+
* The Svalin development is tied back to the [[Grane Oil Field]] platform. Svalin M produces by a well drilled from the Grane platform, while Svalin C is a subsea development with a six-kilometre-long flowline to the Grane platform. The hydrocarbons utilise shared processing and export facilities
  
 
=== Contractors ===
 
=== Contractors ===
* **Aker Solutions:**
+
* Aker Solutions:
* Two subsea trees, one four-slot integrated template structure with process distribution manifold, subsea and topside production control systems, wellhead systems and remote connection systems
+
** Two subsea trees, one four-slot integrated template structure with process distribution manifold, subsea and topside production control systems, wellhead systems and remote connection systems
* Six kilometre long control umbilical, connectors, engineering and project management
+
** Six kilometre long control umbilical, connectors, engineering and project management
  
 
=== History ===
 
=== History ===

Latest revision as of 18:40, 19 October 2020

Summary Information

  • Operator: Statoil
  • Country: Norway
  • Location: Located in Block 25/11 in the North Sea, between the Grane Oil Field and Balder Oil Field
  • Production start: 2014
  • Partners: Statoil, operator (57%), Petoro AS (30%), ExxonMobil E&P Norway (13%)
  • Type: Oil & Gas
  • Estimated Reserves: 75 million barrels oil equivalent
  • Production Volume:

Description

  • The Svalin field lies about six kilometres south-west of the Grane Oil Field platform at a water depth of 125 metres.
  • The Svalin development is tied back to the Grane Oil Field platform. Svalin M produces by a well drilled from the Grane platform, while Svalin C is a subsea development with a six-kilometre-long flowline to the Grane platform. The hydrocarbons utilise shared processing and export facilities

Contractors

  • Aker Solutions:
    • Two subsea trees, one four-slot integrated template structure with process distribution manifold, subsea and topside production control systems, wellhead systems and remote connection systems
    • Six kilometre long control umbilical, connectors, engineering and project management

History

  • 1992 - C Svalin discovered
  • 2008 - Svalin M discovered
  • 2011 - Aker Solutions awarded the engineering, procurement and construction of the subsea production system
  • 2012 - Aker awarded umbilical contract
  • 2012 - Statoil submitted their plan for development and operation (PDO) to the Ministry of Petroleum and Energy
  • 2012 - The Ministry of Petroleum and Energy (MPE) approved the Plan for Development and Operation (PDO)
  • 2014 - Svalin C production begins

Geology

  • There is oil and associated gas in Paleocene to Lower Eocene sandstones in the Heimdal and Balder Formations at a depth of approximately 1 750 metres. The sandstones are deposited as sub-marine fans.

Links

  1. Svalin, NPD
  2. Aker Solutions ASA : Subsea production system award to Aker Solutions
  3. Aker Solutions wins Svalin umbilical contract
  4. Fast-track development of the Svalin field in the North Sea
  5. Development of Svalin approved
  6. Fram H-North and Svalin C production begins