Difference between revisions of "Chiba Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Cosmo Oil Website: http://www.cosmo-oil.co.jp/ Location: Chiba, Japan Capacity: 11.2 million tons/annum & 240,000 bbl/day Nelson Complexity: Ref...")
 
Line 1: Line 1:
−
Summary Information
+
=== Summary Information ===
−
Ownership: Cosmo Oil
+
* Ownership: Cosmo Oil
−
Website: http://www.cosmo-oil.co.jp/
+
* Website: http://www.cosmo-oil.co.jp/
−
Location: Chiba, Japan
+
* Location: Chiba, Japan
−
Capacity: 11.2 million tons/annum & 240,000 bbl/day
+
* Capacity: 11.2 million tons/annum & 240,000 bbl/day
−
Nelson Complexity:
+
* Nelson Complexity:
−
Refining Depth:
+
* Refining Depth:
−
Refining Units
+
=== Refining Units ===
−
Atmospheric Distillation 110,000 bpd + 130,000 bpd
+
* Atmospheric Distillation 110,000 bpd + 130,000 bpd
−
Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
+
* Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
−
Prefractionator Unit 23,000 bpd
+
* Prefractionator Unit 23,000 bpd
−
Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
+
* Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
−
Reformate Splitter 9,000 bpd + 20,000 bpd
+
* Reformate Splitter 9,000 bpd + 20,000 bpd
−
Fluid Catalytic Cracking Unit 40,000 bpd
+
* Fluid Catalytic Cracking Unit 40,000 bpd
−
FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
+
* FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
−
Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
+
* Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
−
Isomerization Unit 6,000 bpd
+
* Isomerization Unit 6,000 bpd
−
Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
+
* Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
−
Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
+
* Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
−
Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
+
* Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
−
No.1 Hydrogen Producing Unit 648,000 m³N / day
+
* No.1 Hydrogen Producing Unit 648,000 m³N / day
−
No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
+
* No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
−
Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
+
* Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
−
Blown Asphalt Unit 3,600 t / month
+
* Blown Asphalt Unit 3,600 t / month
−
Terminal Capacity
+
=== Terminal Capacity
−
Crude Oil: (13units) 930,000kl
+
* Crude Oil: (13units) 930,000kl
−
Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
+
* Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
−
Lubricating Oil Tanks (66units) 24,000kl
+
* Lubricating Oil Tanks (66units) 24,000kl
−
Sulfur Tanks (2units) 13,200kl
+
* Sulfur Tanks (2units) 13,200kl
−
Asphalt Tanks (20units) 28,000kl
+
* Asphalt Tanks (20units) 28,000kl
−
LPG Tanks (23units) 52,700kl
+
* LPG Tanks (23units) 52,700kl
−
Crude Supply
+
=== Crude Supply ===
−
Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait
+
* Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait
−
Products Produced
+
=== Products Produced ===
−
LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur
+
* LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur
−
Ongoing Projects
+
===  Projects ===
 
-
 
-
−
Other Information
+
=== Other Information ===
 
-
 
-
−
History
+
=== History ===
−
1963 - Refinery commissioned
+
* 1963 - Refinery commissioned
−
1967 - Asphalt Unit commissioned
+
* 1967 - Asphalt Unit commissioned
−
1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
+
* 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
−
1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
+
* 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
−
2006 - Fire and explosion in the desulfurization unit
+
* 2006 - Fire and explosion in the desulfurization unit
−
2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
+
* 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
−
2011 - Refinery fire occurs after an earthquake
+
* 2011 - Refinery fire occurs after an earthquake
−
2012 - Restart of CDU damaged in the fire
+
* 2012 - Restart of CDU damaged in the fire
−
Relevant Links
+
===  Links ===
−
Refinery Webpage
+
# [http://www.cosmo-oil.co.jp/eng/company/chiba.html Refinery Webpage]
−
Japanese Refining Capacities
+
# [http://www.paj.gr.jp/english/statis/data/08/精製設備一覧(2010)E.xls Japanese Refining Capacities]
−
Chiyoda Crude Distillation Units
+
# [[[Chiyoda Crude Distillation Units]]]
−
Chiyoda Blown Asphalt Bitumen Units
+
# [[[Chiyoda Blown Asphalt Bitumen Units]]]
−
Chiyoda Residuum Hydrodesulfurization Units
+
# [[[Chiyoda Residuum Hydrodesulfurization Units]]]
−
Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
+
# [[[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]]
−
Chiyoda Hydrogen Manufacturing Units
+
# [[[Chiyoda Hydrogen Manufacturing Units]]]
−
Chiyoda Sulfur Recovery Units
+
# [[[Chiyoda Sulfur Recovery Units]]]
−
Chiyoda H2S Removal Units With Amine
+
# [[[Chiyoda H2S Removal Units With Amine]]]
−
Chiyoda Sour Water Stripping Units
+
# [[[Chiyoda Sour Water Stripping Units]]]
−
Reduction of CDU Nameplate Capacity
+
# [http://killajoules.wikidot.com/archive:reduction-of-cdu-nameplate-capacity Reduction of CDU Nameplate Capacity]
−
Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
+
# [http://killajoules.wikidot.com/blog:2258 Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery]
−
Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
+
# [http://killajoules.wikidot.com/blog:2296 Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery]
−
Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
+
# [http://killajoules.wikidot.com/blog:2390 Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection]
−
Cosmo Oil, Implementation of Restructuring of Refinery Supply
+
# [http://killajoules.wikidot.com/blog:4415 Cosmo Oil, Implementation of Restructuring of Refinery Supply]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:Japan]]

Revision as of 20:18, 28 March 2020

Summary Information

  • Ownership: Cosmo Oil
  • Website: http://www.cosmo-oil.co.jp/
  • Location: Chiba, Japan
  • Capacity: 11.2 million tons/annum & 240,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Refining Units

  • Atmospheric Distillation 110,000 bpd + 130,000 bpd
  • Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
  • Prefractionator Unit 23,000 bpd
  • Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
  • Reformate Splitter 9,000 bpd + 20,000 bpd
  • Fluid Catalytic Cracking Unit 40,000 bpd
  • FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
  • Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
  • Isomerization Unit 6,000 bpd
  • Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
  • Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
  • Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
  • No.1 Hydrogen Producing Unit 648,000 m³N / day
  • No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
  • Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
  • Blown Asphalt Unit 3,600 t / month

=== Terminal Capacity

  • Crude Oil: (13units) 930,000kl
  • Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
  • Lubricating Oil Tanks (66units) 24,000kl
  • Sulfur Tanks (2units) 13,200kl
  • Asphalt Tanks (20units) 28,000kl
  • LPG Tanks (23units) 52,700kl

Crude Supply

  • Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait

Products Produced

  • LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur

Projects

-

Other Information

-

History

  • 1963 - Refinery commissioned
  • 1967 - Asphalt Unit commissioned
  • 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
  • 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
  • 2006 - Fire and explosion in the desulfurization unit
  • 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
  • 2011 - Refinery fire occurs after an earthquake
  • 2012 - Restart of CDU damaged in the fire

Links

  1. Refinery Webpage
  2. Japanese Refining Capacities
  3. [[[Chiyoda Crude Distillation Units]]]
  4. [[[Chiyoda Blown Asphalt Bitumen Units]]]
  5. [[[Chiyoda Residuum Hydrodesulfurization Units]]]
  6. [[[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]]
  7. [[[Chiyoda Hydrogen Manufacturing Units]]]
  8. [[[Chiyoda Sulfur Recovery Units]]]
  9. [[[Chiyoda H2S Removal Units With Amine]]]
  10. [[[Chiyoda Sour Water Stripping Units]]]
  11. Reduction of CDU Nameplate Capacity
  12. Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  13. Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  14. Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
  15. Cosmo Oil, Implementation of Restructuring of Refinery Supply