Difference between revisions of "Kirishi Refinery"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 25: | Line 25: | ||
=== Crude Supply ===  | === Crude Supply ===  | ||
-  | -  | ||
| − | === Products Produced  | + | === Products Produced ===  | 
* unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG  | * unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG  | ||
| − | === Projects  | + | === Projects ===  | 
* For full details see [[Kirishi Refinery Project]]  | * For full details see [[Kirishi Refinery Project]]  | ||
* The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.  | * The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.  | ||
* The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.  | * The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.  | ||
| + | |||
=== History ===  | === History ===  | ||
* 1966 - Refinery was commissioned  | * 1966 - Refinery was commissioned  | ||
Revision as of 17:03, 22 March 2020
Contents
Summary Information
- Ownership: Surgutneftegas
 - Website:
 - Location: Leningradskaya Oblast, North-West of Russia
 - Capacity: 11.5 million tons/annum & 230,000 bbl/day
 - Nelson Complexity:
 - Refining Depth:
 
Brief Description
- A large high complexity refinery, capable of producing EURO V products.
 
Refining Units
- Atmospheric Distillation
 - Reformer
 - Diesel Hydrotreatment
 - Isomerization
 - Residue Hydrocracker - 60,000 bpd
 - Visbreaker
 - Amine regeneration unit
 - Sulfur recovery unit
 
Terminal Capacity
- Crude Oil:
 - Refined Products:
 
Crude Supply
-
Products Produced
- unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG
 
Projects
- For full details see Kirishi Refinery Project
 - The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.
 - The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.
 
History
- 1966 - Refinery was commissioned
 - 1996 - Kirishi started production of diesel fuel with a maximum of 500 ppm of sulfur
 - 2008 - Upgrading project launched
 - 2013 - Kirishi Refinery Project completed
 
Other Information
-