<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Papa_Terra_Oil_Field</id>
	<title>Papa Terra Oil Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Papa_Terra_Oil_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Papa_Terra_Oil_Field&amp;action=history"/>
	<updated>2026-04-10T00:44:15Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Papa_Terra_Oil_Field&amp;diff=68697&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Petrobras  * Country: Brazil  * Location: Campos Basin * Production start: 2013 * Partners: Chevron 37.5% * Type: Oil  * Estimated Reserves:  *...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Papa_Terra_Oil_Field&amp;diff=68697&amp;oldid=prev"/>
		<updated>2023-05-12T15:19:36Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Petrobras  * Country: Brazil  * Location: Campos Basin * Production start: 2013 * Partners: Chevron 37.5% * Type: Oil  * Estimated Reserves:  *...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Petrobras &lt;br /&gt;
* Country: Brazil &lt;br /&gt;
* Location: Campos Basin&lt;br /&gt;
* Production start: 2013&lt;br /&gt;
* Partners: Chevron 37.5%&lt;br /&gt;
* Type: Oil &lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* Located in a water depth of 1,200 meters, showing crude oil with an API between 14º and 17º&lt;br /&gt;
* Platform P-61 is a TLWP (Tension-Leg Wellhead Platform) which is connected to [[P 63 FPSO]]&lt;br /&gt;
* Thirteen production wells will be interconnected to P-61&lt;br /&gt;
* The production wells of P-63 are connected to the platform via subsea flexible pipes equipped with electric heating known as IPB (Integrated Production Bundle) and the field’s 18 production wells feature subsea centrifuge pumps.&lt;br /&gt;
* P-63 has a daily production capacity of 140,000 barrels of oil (bopd) and 35 million cubic metres of gas.&lt;br /&gt;
* The SS-88 TAD (Tender Assisted Drilling) semi-submersible unit is anchored next to P-61  &lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **BrasFels:** Design, engineering, construction, maintenance and installation as well as a three-year contract to operate the P-61&lt;br /&gt;
* **McDermott:** Engineering, procurement, construction, installation	 of the TLWP, hull, topsides, tendons, risers&lt;br /&gt;
* **Inocean:** Major parts of the hull and topside structural engineering, technical documentation and drawings for class approval during the conversion of ULCC BW Nisa (323,000 dwt) from tanker to FPSO.&lt;br /&gt;
* **COSCO:** Construction of P-63 FPSO NISA&lt;br /&gt;
* **Nessco:** Communications systems &lt;br /&gt;
* **VME Process:** Fabrication of three (3) 500-ton E-houses&lt;br /&gt;
* **InterMoor:** Design, procurement, fabrication and installation of the drilling and production conductors&lt;br /&gt;
* **Dril-Quip:** Surface production tree systems, production riser systems and a drilling riser system&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2003 - Papa Terra Oil Field discovered&lt;br /&gt;
* 2005 - Declaration of Commercial Potential&lt;br /&gt;
* 2010 - Contract signed for Platform P-61&lt;br /&gt;
* 2012 - P-63 FPSO NISA delivered&lt;br /&gt;
* 2013 - First oil produced&lt;br /&gt;
* 2015 - P61 platform started up&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [[McDermott Platform References]]&lt;br /&gt;
# [[Nessco FPSO References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:declaration-of-commercial-potential-of-new-giant-fie Declaration of Commercial Potential of New Giant Field in the Campos Basin]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:brasfels-tlwp-will-build-the-platform-p-61 BrasFels TLWP will build the platform P-61]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:cosco-dalian-shipyard-delivered-p-63-fpso-nisa-to-pe COSCO Dalian Shipyard delivered P-63 FPSO NISA to Petrobras]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:papa-terra-job-to-inocean Papa Terra-job to Inocean]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:vme-awarded-e-houses-for-petrobras-chevron-s-papa-te VME Awarded E-Houses for Petrobras/Chevron's Papa-Terra P-61 TLWP project Brazil]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:intermoor-awarded-conductor-fabrication-and-installa InterMoor Awarded Conductor Fabrication and Installation for Papa Terra Field]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:dril-quip-inc-awarded-100-million-contract-for-the-s Dril-Quip, Inc. Awarded $100 Million Contract for the Supply of Drilling and Production Equipment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4719 Chevron Confirms First Oil Production from Papa-Terra Offshore Brazil]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5154 Nine platforms that will boost oil production in Brazil]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5802 Start-up of platform P-61 in Papa Terra field]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>