<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Islay_Gas_Field</id>
	<title>Islay Gas Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Islay_Gas_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Islay_Gas_Field&amp;action=history"/>
	<updated>2026-04-05T13:33:12Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Islay_Gas_Field&amp;diff=69479&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Total * Country: UK * Location: North Sea * Production start: 2012 * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:   +++ D...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Islay_Gas_Field&amp;diff=69479&amp;oldid=prev"/>
		<updated>2023-09-02T17:26:27Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Total * Country: UK * Location: North Sea * Production start: 2012 * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:   +++ D...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Total&lt;br /&gt;
* Country: UK&lt;br /&gt;
* Location: North Sea&lt;br /&gt;
* Production start: 2012&lt;br /&gt;
* Partners: &lt;br /&gt;
* Type: Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* The Islay Field is located 440 kilometers northeast of Aberdeen in 120 meters of water&lt;br /&gt;
* Islay’s single well is tied-back to the Alwyn North platform, the central platform for the [[Greater Alwyn Oil and Gas Fields]] via existing subsea infrastructure&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **Technip:** Installation of a 6-kilometer ETH-PIP, control umbilical, subsea structures and seabed preparation, including detailed design, engineering and project management&lt;br /&gt;
* **Dril-Quip:** Subsea control system equipment which includes a subsea fiber optic network communication system, two subsea control pods and a HIPPs (High Integrity Pressure Protection) system with its own subsea control pod&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2008 - Islay Gas Field discovered&lt;br /&gt;
* 2010 - Project development approved by UK Goverment&lt;br /&gt;
* 2010 - Technip awarded subsea contract&lt;br /&gt;
* 2012 - First gas produced&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4 Technip awarded Subsea contract for Total Islay in the North Sea]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:dril-quip-inc-awarded-20-million-contract-for-the-su Dril-Quip, Inc. Awarded $20 Million Contract for the Supply of Subsea Control Systems]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2419 North Sea: Islay Field Comes On Stream]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>