<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Fletcher_Finucane_Oil_Field</id>
	<title>Fletcher Finucane Oil Field - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Fletcher_Finucane_Oil_Field"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Fletcher_Finucane_Oil_Field&amp;action=history"/>
	<updated>2026-04-12T20:34:40Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Fletcher_Finucane_Oil_Field&amp;diff=71616&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information * Operator: Santos * Country: Australia  * Location: North West Shelf * Production start: 2013 * Partners: Santos - 48%,  Kufpec, JX Nippon * Type: Oil / G...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Fletcher_Finucane_Oil_Field&amp;diff=71616&amp;oldid=prev"/>
		<updated>2023-11-27T07:47:34Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information * Operator: Santos * Country: Australia  * Location: North West Shelf * Production start: 2013 * Partners: Santos - 48%,  Kufpec, JX Nippon * Type: Oil / G...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
* Operator: Santos&lt;br /&gt;
* Country: Australia &lt;br /&gt;
* Location: North West Shelf&lt;br /&gt;
* Production start: 2013&lt;br /&gt;
* Partners: Santos - 48%,  Kufpec, JX Nippon&lt;br /&gt;
* Type: Oil / Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
+++ Description&lt;br /&gt;
* The project is a three well sub-sea tie back to the existing Santos-operated floating production, storage and offloading facility located at [[Mutineer Exeter Oil Field]]&lt;br /&gt;
* The [[Modec Venture 11 FPSO]] is installed in 156 meters (512 feet) water depth and has an oil processing capacity of 100,000 barrels of oil per day, gas handling of 2-3 million cubic feet per day, produced water treatment of up to 125,000 barrels per day, topsides water injection facilities for 150,000 barrels per day and storage capacity of 930,000 barrels&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ Contractors&lt;br /&gt;
* **Technip:** Project management, engineering and the supply of 31 kilometers of 10.2” and 9” production flowlines*, along with 22 kilometers of 3” service lines&lt;br /&gt;
* **JDR:** Design, manufacture and supply of Subsea Production Umbilicals and Subsea Power Cables&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2012 - Fletcher Finucane oil development sanctioned&lt;br /&gt;
* 2013 - First oil from Finucane field&lt;br /&gt;
&lt;br /&gt;
+++ Geology&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
+++ Links&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1928 Fletcher Finucane oil development sanctioned; Santos lifts interest in project]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:jdr-completes-successful-delivery-of-complex-project JDR Completes Successful Delivery Of Complex Project For Santos]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2164 Technip awarded flexible supply contract for Fletcher Finucane development in Australia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4244 First Oil from Finucane South Field, North West Shelf, Australia]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>