<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Adria_LNG_Terminal</id>
	<title>Adria LNG Terminal - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/index.php?action=history&amp;feed=atom&amp;title=Adria_LNG_Terminal"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Adria_LNG_Terminal&amp;action=history"/>
	<updated>2026-09-30T18:52:15Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Adria_LNG_Terminal&amp;diff=62778&amp;oldid=prev</id>
		<title>Abarrelfull: Created page with &quot;Summary Information  Ownership: Adria LNG, E-on, OMV, Total Website: http://www.adria-lng.hr/ Location: Croatia Capacity: 10 billion cubic metres (bcm) per annum Status: Plann...&quot;</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Adria_LNG_Terminal&amp;diff=62778&amp;oldid=prev"/>
		<updated>2020-08-20T17:04:25Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Summary Information  Ownership: Adria LNG, E-on, OMV, Total Website: http://www.adria-lng.hr/ Location: Croatia Capacity: 10 billion cubic metres (bcm) per annum Status: Plann...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Summary Information&lt;br /&gt;
&lt;br /&gt;
Ownership: Adria LNG, E-on, OMV, Total&lt;br /&gt;
Website: http://www.adria-lng.hr/&lt;br /&gt;
Location: Croatia&lt;br /&gt;
Capacity: 10 billion cubic metres (bcm) per annum&lt;br /&gt;
Status: Planned&lt;br /&gt;
Brief Description&lt;br /&gt;
&lt;br /&gt;
Final capacity of the terminal corresponds to 10 billion Ncbm/year. The terminal facility comprises : a LNG carrier berthing, unloading facilities, full containment storage tanks (3 x 120.000 cbm), vaporisation and transportation facilities&lt;br /&gt;
Technical Details&lt;br /&gt;
&lt;br /&gt;
Storage capacity:&lt;br /&gt;
Unloading capacity: It will be designed for LNG tankers carrying up to 265,000 cubic metres.&lt;br /&gt;
Send out capacity:&lt;br /&gt;
Constructor:&lt;br /&gt;
Tractabel: Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications&lt;br /&gt;
Ongoing Projects/Project Status&lt;br /&gt;
&lt;br /&gt;
Final investment decision is yet to be made&lt;br /&gt;
The Croatian government is considering their own competing project&lt;br /&gt;
Suppliers / Customers&lt;br /&gt;
&lt;br /&gt;
Suppliers:&lt;br /&gt;
Customers:&lt;br /&gt;
History&lt;br /&gt;
&lt;br /&gt;
1993 - Tractabel awarded contract for Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications&lt;br /&gt;
2007 - Conceptual engineering study prepared&lt;br /&gt;
2009 - Sofregaz awarded FEED contract&lt;br /&gt;
Other Information&lt;br /&gt;
&lt;br /&gt;
-&lt;br /&gt;
=== Links ===&lt;br /&gt;
&lt;br /&gt;
Tractebel Engineering LNG References&lt;br /&gt;
Croatia wants concrete moves on LNG terminal&lt;br /&gt;
Total Studies an LNG Receiving Terminal in Croatia&lt;br /&gt;
Krk Island - CROATIA - LNG TERMINAL - FEED&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>