<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://www.abarrelfull.co.uk/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Abarrelfull</id>
	<title>A Barrel Full - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://www.abarrelfull.co.uk/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Abarrelfull"/>
	<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/Special:Contributions/Abarrelfull"/>
	<updated>2026-04-04T01:16:08Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.33.1</generator>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76628</id>
		<title>Hazira LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76628"/>
		<updated>2026-01-28T16:03:47Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Hazira LNG, (Shell / Total)&lt;br /&gt;
* Website: http://www.haziralng.com/&lt;br /&gt;
** List of [[Shell LNG Terminals]]&lt;br /&gt;
* Location: Hazira, Gujarat, India &lt;br /&gt;
* Capacity: 2.5 million tons/annum &lt;br /&gt;
* Status: In Operation&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* Hazira LNG Terminal is designed as a 5 million ton import terminal&lt;br /&gt;
* It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each &lt;br /&gt;
* Unloading capacity:&lt;br /&gt;
* Send out capacity: &lt;br /&gt;
* Constructor: &lt;br /&gt;
** Designed by Shell Global Solutions (SGSI) &lt;br /&gt;
** Managing Contractors  – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium)&lt;br /&gt;
** Tanks – Punj Lloyd Limited &lt;br /&gt;
** Causeway and spurs – Larsen &amp;amp;Toubro Jetty - &lt;br /&gt;
** Afcons Civil Building – Simplex    &lt;br /&gt;
** **Tractebel Engineering:** Executing FEED, EPC ITB &amp;amp; selection of EPC Contractor and Owner's Engineering services for the expansion&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project is designed to be expandable to 5 million tons capacity&lt;br /&gt;
* It is currently undergoing expansion which will be completed in 2012&lt;br /&gt;
* In addition, there is potential to expanded to 10 million tons&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes&lt;br /&gt;
* Customers: Connected to the local grid, to serve both industrial and domestic customers.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2005 - Terminal commences operations&lt;br /&gt;
* 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal  | Qatargas 4]]&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell]&lt;br /&gt;
# [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India]&lt;br /&gt;
# [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012]&lt;br /&gt;
# [[Punj Lloyd Pipeline References]]&lt;br /&gt;
# [[Saipem LNG References]]&lt;br /&gt;
# [[Tractebel Engineering LNG References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76627</id>
		<title>Punj Lloyd Pipeline References</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76627"/>
		<updated>2026-01-28T16:02:36Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# [[Shah Gas Field]]&lt;br /&gt;
#*  Gas Gathering Package 1– Abu Dhabi Development Co Ltd&lt;br /&gt;
#* Engineering, procurement, installation, commissioning assistance of eight well pad systems, (16” dia) 18 km four inter-pad lines (24” dia) 31 km four transfer lines and flow lines from the individual wells to their associated well pad. &lt;br /&gt;
#* Facilities include leak detection, Cathodic Protection, wellhead control, flow gathering and measurement,	pressure protection, flare and drain, fire and gas detection, telecommunication and security systems etc., near the Shah processing facility in western region of Abu Dhabi&lt;br /&gt;
#* Ongoing Aug 2014&lt;br /&gt;
# Sabah Sarawak Gas Pipeline - 2&lt;br /&gt;
#* Malaysia - Sabah Sarawak&lt;br /&gt;
#* Petronas Carigali&lt;br /&gt;
#* Engineering, procurement, construction and commissioning of 36&amp;quot; 521 km gas pipeline from Kimanis, Sabah to Bintulu, Sarawak,	with Cathodic Protection, compressor stations, metering stations, intermediate scraper stations and launcher station, receiver station, 22 block valve stations, six future tap off points along the pipeline, SCADA, telecommunication, leak detection, fire &amp;amp; gas system and a gas management system.&lt;br /&gt;
#* Ongoing Jul 2012&lt;br /&gt;
				&lt;br /&gt;
				&lt;br /&gt;
			&lt;br /&gt;
			&lt;br /&gt;
				&lt;br /&gt;
3	Strategic Gas	Qatar Petroleum	Engineering, procurement and construction of (36” dia) 124 km and	Ongoing&lt;br /&gt;
	Transmission,		87 km twin pipeline, OFC laying, station work, construction of six	Jun 2011&lt;br /&gt;
	Qatar		block valve stations, modification and expansion of existing stations	&lt;br /&gt;
			and construction of new station, relocation of 11 KV overhead	&lt;br /&gt;
			power line in the pipeline route.	&lt;br /&gt;
&lt;br /&gt;
4	El Khoms-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline Gas		&lt;br /&gt;
	Compressor		&lt;br /&gt;
	Stations, Libya		&lt;br /&gt;
5	Melita-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline, Libya		&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Balance work of (34’’ dia) 157 km gas pipeline, civil and mechanical  Ongoing&lt;br /&gt;
&lt;br /&gt;
work on gas metering stations, compressor stations at Sidra and	Jun 2011&lt;br /&gt;
&lt;br /&gt;
Wachkah including SCADA and telecommunication.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (34” dia) 98 km	Ongoing&lt;br /&gt;
&lt;br /&gt;
pipeline from Melita to Tripoli with (24” dia) 21 km branchline	Jun 2011&lt;br /&gt;
&lt;br /&gt;
including gas reducing, metering, compression stations and&lt;br /&gt;
&lt;br /&gt;
telecommunication work.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
6	Dahej-Vijaipur	Gas Authority of	Construction of (48&amp;quot; dia) 145.43 km natural gas pipeline from Dahej	Ongoing,&lt;br /&gt;
	Pipeline	India Ltd	to Jambudi, Spread-1, OFC laying, mechanical, electrical and	Feb 2011&lt;br /&gt;
	Upgradation		instrumentation work at Dahej despatch station, six sectionalising	&lt;br /&gt;
			valve stations, one intermediate pigging station, including civil,	&lt;br /&gt;
			structural and architectural work.	&lt;br /&gt;
7	Oil &amp;amp; Gas Export	Agip KCO	Detailed engineering, procurement and construction of (24” dia)	Onging&lt;br /&gt;
	Pipelines,		49.5 km oil pipeline with two crossings by horizontal directional	Dec 2010&lt;br /&gt;
	Kashagan,		drilling method and 90 km gas pipeline in Atyrau region of western	&lt;br /&gt;
	Kazakhstan		Kazakhstan.	&lt;br /&gt;
8	Darod-Jafrabad	Gujarat State	Engineering, procurement and construction of (24&amp;quot; dia) 103 km	Ongoing&lt;br /&gt;
	Pipeline	Petronet Ltd	crude oil pipeline, Section B from Tana to Jafrabad.	Sep 2010&lt;br /&gt;
9	Multi Product	Qatar Petroleum	Engineering, procurement, construction and installation of (18&amp;quot; dia)	Ongoing&lt;br /&gt;
	Pipeline, Qatar		46 km multiproduct pipeline, OFC laying from Messaieed refinery to	Aug 2010&lt;br /&gt;
			Doha depot and station work at Mesaieed refinery and Doha depot	&lt;br /&gt;
			including demolition.	&lt;br /&gt;
10	Doha Urban	Qatar Petroleum	Engineering, procurement, construction and commissioning of	Ongoing&lt;br /&gt;
	Pipeline		(36”, 12’’ and 8’’ dia) 97.2 km gas pipelines, three new stations,	Aug 2010&lt;br /&gt;
	Relocation,		six modification stations, decommissioning of existing pipelines and	&lt;br /&gt;
	Qatar		demolition of nine existing stations.	&lt;br /&gt;
11	Reliance	Cairn Energy	Engineering, procurement, construction, installation, testing and	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	commissioning of heated and insulated (24” dia) 7.2 km crude oil	Jun 2010&lt;br /&gt;
			insulated pipeline, corrosion coated, PUF insulation completed	&lt;br /&gt;
			with Skin Effect Tubing and HDPE outer sleeve and cables of heat	&lt;br /&gt;
			tracing.	&lt;br /&gt;
12	Essar Spurline	Cairn Energy	Procurement, construction and Installation of (24&amp;quot; dia) 3.3 km	Completed&lt;br /&gt;
		India Pty Ltd	crude oil insulated spurline and receiving facility within Essar Oil	May 2010&lt;br /&gt;
			Refinery for Mangla Development Pipeline, OFC laying, 3.3 km	&lt;br /&gt;
			Skin Effect Heat Management System, mechanical, electrical and	&lt;br /&gt;
			instrumentation work at AGI Salaya &amp;amp; Essar Receiving Facility	&lt;br /&gt;
			including civil, structural and architectural work.	&lt;br /&gt;
13	Mangla	Cairn Energy	Engineering, procurement and construction of (24&amp;quot; dia) 57 km crude	Completed&lt;br /&gt;
	Development	India Pty Ltd	oil insulated pipeline and (8&amp;quot; dia) 57 km gas pipeline upto Salaya	Apr 2010&lt;br /&gt;
	Pipeline I &amp;amp; II		AGI Station, 56.52 km Skin Effect Heat Management System,	&lt;br /&gt;
			mechanical, electrical, civil, structural and architectural work.	&lt;br /&gt;
14	Radhanpur	Cairn Energy	Engineering, procurement and construction of (10&amp;quot; dia) 22 km	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	crude oil insulated pipeline upto IOCL Radhanpur Terminal, OFC	Mar 2010&lt;br /&gt;
			laying, skin Effect Heat Management System, mechanical, electrical,	&lt;br /&gt;
			instrumentation, civil, structural and architectural work.	&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Stabilisation and Sweetening	Train, Aksai		&lt;br /&gt;
#* Installation of 26,000 inch dia piping and equipment erection at Karachaganak Oil &amp;amp; Gas Condensate Field in Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# Ras Laffan Olefins Co&lt;br /&gt;
#* UAE&lt;br /&gt;
#* Ethylene and Butene Pipelines, 		&lt;br /&gt;
#* Construction of (14’’ dia) 129.6 km, (10’’ dia) 5.1 km dense phase ethylene pipelines and (3’’ dia) 5.1 km butane pipeline from Ras Laffan to Mesaieed including scraper launcher, receiver, four block valve stations, satellite and station S, Cathodic Protection, OFC, pre-commissioning and commissioning assistance.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Karachaganak-Uralsk Gas Pipeline&lt;br /&gt;
#* Laying of pipeline by HDD across five rivers Gnyloy Lake, Ural,	Barabastau, Karoba and Utva with a total length 3320 m. Executed longest HDD crossing of Ural River, 1015 m in Kazakhstan.&lt;br /&gt;
#* Completed Oct 2009&lt;br /&gt;
&lt;br /&gt;
	&lt;br /&gt;
18	OGC Pipelines,	Oman Gas Co	Engineering, procurement and construction of :	Completed&lt;br /&gt;
	Oman		• (24’’ dia) 40 km Murayrat-Barka, Russayl Looplines	Sep 2009&lt;br /&gt;
			• Barka PRT Expansion	&lt;br /&gt;
			• (32” dia) 252 km Saih Rawl-Mukhaizna Loopline	&lt;br /&gt;
			• Three compressor stations at Nimr including scraper launcher,	&lt;br /&gt;
			receiver, seven block valve stations, Cathodic Protection, SCADA	&lt;br /&gt;
			telecommunication, pre-commissioning and commissioning.	&lt;br /&gt;
19	Asab Gas	Eastern Bechtel	Construction of (16” dia) 82 km pipeline from Habshan to Asab,	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase II	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
20	Onshore Gas	Eastern Bechtel	Construction of (24”, 20” dia) 105 km pipeline from Habshan to	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi Ruwais, UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase III	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
21	Dabhol Panvel	Gas Authority of	Engineering, procurement and commissioning of (30&amp;quot; dia) 50.3 km	Completed&lt;br /&gt;
	Pipeline Phase II	India Ltd	natural gas pipeline from Ambewadi despatch terminal to Usar	Jun 2009&lt;br /&gt;
			receiver terminal including spurlines to NITCO, and two	&lt;br /&gt;
			sectionalising valve stations, one crossing by HDD across	&lt;br /&gt;
			Amba river.	&lt;br /&gt;
22	East-West	Reliance Gas	Construction of (48&amp;quot; dia) 2.3 km natural gas pipeline in the western	Completed&lt;br /&gt;
	Gas Pipeline	Transportation	mountain range with steep slope upto 70O by cable crane system	Feb 2009&lt;br /&gt;
	(Bhivpuri Ghat)	Infrastructure Ltd	with specialised crew.	&lt;br /&gt;
23	East-West Gas	Reliance Gas	Construction and laying of (48&amp;quot; dia) 117.5 km natural gas pipeline	Completed&lt;br /&gt;
	Pipeline	Transportation	with automatic / semi-automatic welding technology, including three	Jan 2009&lt;br /&gt;
	Spread 6A &amp;amp; 6B	Infrastructure Ltd	sectionalising valve stations and two compressor stations.	&lt;br /&gt;
24	Eastern Gas	Dolphin Energy	Engineering, procurement and construction of 260 km OFC with	Completed&lt;br /&gt;
	Distribution	Ltd (DEL)	earthwork along the Jebel Ali – Taweela – Maqta - Al Ain pipeline,	Nov 2008&lt;br /&gt;
	System Upgrade,		mechanical and coating repairs on pipelines and restoration of	&lt;br /&gt;
	UAE		damaged berms.	&lt;br /&gt;
&lt;br /&gt;
# [[Bu Hasa Oil Field]]&lt;br /&gt;
#* Adco&lt;br /&gt;
#* Flowlines &amp;amp; WellHeads	&lt;br /&gt;
#* Wellhead, flow line, water injection line installations, tie-in to existing injection header, tie-ins at header/manifold, physical tagging. including pre-commissioning and commissioning support.&lt;br /&gt;
#* Oct 2008&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
26	South Sumatra	PT Perusahaan	&lt;br /&gt;
	to West Java Gas	Gas Negara/JFE	&lt;br /&gt;
	Pipeline Phase I,	Engineering	&lt;br /&gt;
	Sumatra		&lt;br /&gt;
27	Dabhol Panvel	Gas Authority of	&lt;br /&gt;
	Pipeline Phase I	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (32” dia) 270 km	Completed&lt;br /&gt;
&lt;br /&gt;
onshore pipeline installation from Pagardewa to Labuhan Maringgai,  Sept 2008&lt;br /&gt;
&lt;br /&gt;
including sectionalising valve stations, civil, mechanical, piping,&lt;br /&gt;
&lt;br /&gt;
instrumentation, insulation work at Pagardewa, Terbanggi Besar and&lt;br /&gt;
&lt;br /&gt;
Labuhan Maringgai, Indonesia.&lt;br /&gt;
&lt;br /&gt;
Residual engineering, procurement (excluding supply of line pipe)	Completed&lt;br /&gt;
&lt;br /&gt;
installation, testing, commissioning of pipeline and associated	Feb 2008&lt;br /&gt;
&lt;br /&gt;
facilities for (30” dia) 113 km pipeline including EGP, permanent pig&lt;br /&gt;
&lt;br /&gt;
launcher, receiver, signalers, actuators for actuated valves, CCVT/&lt;br /&gt;
&lt;br /&gt;
TEG, permanent Cathodic Protection System, interference surveys&lt;br /&gt;
&lt;br /&gt;
and implementation of mitigation measures for CP System.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
28	Dahej-Uran	Gas Authority&lt;br /&gt;
	Pipeline	of India&lt;br /&gt;
29	Mundra Delhi	Hindustan&lt;br /&gt;
	Pipeline	Petroleum&lt;br /&gt;
		Corp Ltd&lt;br /&gt;
30	South Sumatra	PT Perusahaan&lt;br /&gt;
	to West Java Gas	Gas Negara&lt;br /&gt;
	Pipeline, Phase II	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Laying of	(30” dia) 144 km pipeline and associated facilities	Completed&lt;br /&gt;
including eight crossings by horizontal directional drilling method.	May 2007&lt;br /&gt;
Laying of	(18” dia) 434 km, (16” dia) 73 km and (8” dia) 35.7 km	Completed&lt;br /&gt;
pipeline and associated facilities including construction, testing,	May 2007&lt;br /&gt;
pre-commissioning and commissioning assistance.	&lt;br /&gt;
&lt;br /&gt;
Design, construction, testing and mechanical completion of (32” dia) Completed 270 km pipeline from Pagardewa to Labuhan Maringgai and (28” dia) Mar 2007 4 km pipeline from Pagardewa receiving point to Pagardewa Station&lt;br /&gt;
&lt;br /&gt;
including 9 crossings by HDD, 24 core OFC laying, 4 sectional valve stations and Cathodic Protection at Sumatra, Indonesia.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
31	Mumbai-	Bharat Petroleum	Supply, construction of (16” dia) 332 km pipeline and piping systems, Completed&lt;br /&gt;
	Manmad-	Corp Ltd	Cathodic Protection, road/rail/water crossings, pre – commissioning	Mar 2007&lt;br /&gt;
	Manglya Pipeline		including terminal piping work, commissioning assistance and	&lt;br /&gt;
			hook-up work at terminals, associated mechanical, civil, structural,	&lt;br /&gt;
			architectural, electrical, telecom and instrumentation work from	&lt;br /&gt;
			Manglya Despatch Terminal to sectionalising valve station at Manglya	&lt;br /&gt;
			to Piyala/Bijwasan.	&lt;br /&gt;
32	Pune-Solapur	Hindustan	Procurement, construction, pre-commissioning and commissioning	Completed&lt;br /&gt;
	Pipeline	Petroleum	assistance for (14” dia) 182 km and (12” dia) 161 km pipeline,	Mar 2007&lt;br /&gt;
		Corp Ltd	including 9 sectionalising valve stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, rotating equipment, Cathodic	&lt;br /&gt;
			Protection, instrumentation and OFC laying work.	&lt;br /&gt;
33	Huwailah Field	Abu Dhabi Co	Construction of flowlines &amp;amp; transfer line (10’’ dia) 30 km in Huwaila,	Completed&lt;br /&gt;
	Development	for Onshore	UAE.	Dec 2006&lt;br /&gt;
		Oil Operations		&lt;br /&gt;
		(ADCO)/Matrix		&lt;br /&gt;
		Construction		&lt;br /&gt;
# [[Tengiz Oil Field]]&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* Large and Small-Bore Pipelines for TCO Asset Development&lt;br /&gt;
#* Tengizchevroil (TCO)/PFD International LLC (Parsons/Fluor Daniel JV)&lt;br /&gt;
#* Construction of pipelines and flow lines 408 km LTCS piping fabrication (181,000 inch dia), erection (115,000 inch metre) and high pressure thick walled injection piping work upto 63 mm,	HPPE pipe fusion welding and laying, equipment installation, civil, structural, painting, insulation work at Tengiz, Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2006	&lt;br /&gt;
# [[Tambora Gas Field]]&lt;br /&gt;
#* Indonesia&lt;br /&gt;
#* Tambora Phase II, &lt;br /&gt;
#* Total E&amp;amp;P&lt;br /&gt;
#* Engineering, procurement, supply and construction of gas pipeline&lt;br /&gt;
#* Completed&lt;br /&gt;
#* EPSC 2 for	Indonesie	network in swamp risers and dogleg installation to Gathering Testing&lt;br /&gt;
#* Jun 2006&lt;br /&gt;
	Pipeline Network,		Satellite Stations (GTS) and wellhead platforms:	&lt;br /&gt;
	Indonesia		•  24” dia line	&lt;br /&gt;
			•  8” dia flow lines and 2” piggy back as gas instrument line	&lt;br /&gt;
			•  5 km crossing of existing facilities and river by Horizontal	&lt;br /&gt;
			Directional Drilling method	&lt;br /&gt;
			•  2 river crossings by open cut method	&lt;br /&gt;
&lt;br /&gt;
# [[Hazira LNG Terminal]] - 36&lt;br /&gt;
#* India&lt;br /&gt;
#* BG Exploration Marketing and Production / Kvaerner Power &amp;amp; Gas&lt;br /&gt;
#* Civil, mechanical and structural work for construction at ONGC&lt;br /&gt;
#* Completed Jan 2006&lt;br /&gt;
&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
37	Oman Gas	Petroleum	Engineering, procurement and construction of (48” dia) 265 km	Completed&lt;br /&gt;
	Export Line,	Development	gas pipeline from KP 24.5 to BVS 09A including Cathodic	Nov 2005&lt;br /&gt;
	Oman	Oman LLC	Protection, 10 block valve stations, telecommunication, pre-	&lt;br /&gt;
			commissioning and commissioning assistance.	&lt;br /&gt;
38	Mora Sachin	Gujarat Gas	Construction of natural gas pipeline of (16” dia) 25 km and (12” dia)	Completed&lt;br /&gt;
	Palsana Pipeline	Co Ltd	11 km including installation of valve stations, pig launchers, pig	Oct 2005&lt;br /&gt;
			receivers, header fabrication, uploading, installation and hook-up of	&lt;br /&gt;
			metering skid, pre-commissioning and commissioning assistance	&lt;br /&gt;
			and Tapi river crossing by Horizontal Directional Drilling method.	&lt;br /&gt;
# [[Baku Tbilisi Ceyhan Pipeline]]&lt;br /&gt;
#* Turkey&lt;br /&gt;
#* Botas/BTC Co/British Petroleum/ILF Consulting Engineers	&lt;br /&gt;
#* Engineering, procurement and construction of crude oil pipeline (42” dia) 207 km and (34” dia) 124 km from pumping station No. 4 near Sivas to tank terminal at Ceyhan on the Mediterranean Sea, including Cathodic Protection, 13 block valve station and commissioning assistance.&lt;br /&gt;
#* Jul 2005&lt;br /&gt;
		&lt;br /&gt;
			&lt;br /&gt;
				&lt;br /&gt;
40	Baku-Tbilisi-	Spie Capag	Construction of (46” dia) 53.4 km of crude oil pipeline and	Completed&lt;br /&gt;
	Ceyhan and	– Petrofac	(42” dia) 53.4 km of gas pipeline from KP 178 to KP 250 including	Feb 2005&lt;br /&gt;
	South Caucasus	International Ltd	Cathodic Protection, laying of HDP duct for optic fibre cable &amp;amp; block	&lt;br /&gt;
	Pipeline		valve stations at Georgia.	&lt;br /&gt;
41	Shore Approach	Gujarat Adani	Construction of shore approach pipeline (48” dia) 1 km at Mundra	Completed&lt;br /&gt;
	Pipeline	Port Ltd/Valentine	Port, Gujarat.	Feb 2005&lt;br /&gt;
		Maritime Ltd		&lt;br /&gt;
42	Dahej-Vijaipur	Gas Authority	Engineering, procurement, fabrication, transportation, construction,	Completed&lt;br /&gt;
	Gas Pipeline	of India Ltd/	testing, drying, pre-commissioning and commissioning of (42” dia)	Feb 2004&lt;br /&gt;
		Engineers	506 km and (36” dia) 6.6 km Dahej Vijaipur pipeline project including	&lt;br /&gt;
		India Ltd	associated facilities like sectionalising stations, intermediate scraper	&lt;br /&gt;
			stations, scraper launcher / receiver station, CP-cum-repeater	&lt;br /&gt;
			stations, laying of optical fibre work of spread I, II, III &amp;amp; IVB of the	&lt;br /&gt;
			pipeline system.	&lt;br /&gt;
43	Mumbai-	Bharat Petroleum	Construction of (14” dia) 189.15 km multi-product pipeline from	Completed&lt;br /&gt;
	Manmad Pipeline Corp Ltd/	Shirpur to Manglya, including sectionalising valve stations, scraper	May 2003&lt;br /&gt;
	Extension	Engineers	receiver, intermediate pigging stations, Cathodic Protection, OFC	&lt;br /&gt;
		India Ltd	laying and Narmada river crossing 950 m by Horizontal Directional	&lt;br /&gt;
			Drilling method.&lt;br /&gt;
# KAM Pipeline - 44&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* PetroKazakhstan&lt;br /&gt;
#* Construction of (16” dia) 177 km crude oil pipeline from [[Kumkol Oil Field]] to Dhuzaly via Aryskum, including block valves, pig launchers and receivers, Cathodic Protection System and OFC.&lt;br /&gt;
#* Completed Apr 2003&lt;br /&gt;
				&lt;br /&gt;
45	Vizag-	Gas Authority	Installation of (10” dia) 176.23 km of LPG pipeline from SV-25 to	Completed&lt;br /&gt;
	Secunderabad	of India Ltd/	Secunderabad, including installation of Cathodic Protection System,	Mar 2003&lt;br /&gt;
	Pipeline	Engineers	OFC laying in HDPE duct and 12 Nos. sectionalising valve stations,	&lt;br /&gt;
		India Ltd	intermediate pigging station at Suryapet and receipt terminal	&lt;br /&gt;
			at Secunderabad.	&lt;br /&gt;
46	KG Basin	Gas Authority	Design, engineering and laying of combination of (18” dia) pipe	Completed&lt;br /&gt;
	Phase-II Pipeline	of India Ltd/	and 6.625” CS conduit with 2 x 50 mm HDPE interducts across	Oct 2002&lt;br /&gt;
		Engineers	two rivers, Vainetyam Godavari (1,704 m) and Gowthami Godavari	&lt;br /&gt;
		India Ltd	(1,769 m), at Andhra Pradesh.	&lt;br /&gt;
&lt;br /&gt;
47 Mangalore-	Petronet MHB	&lt;br /&gt;
Bangalore	Ltd/Engineers	&lt;br /&gt;
Pipeline	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Installation of (24”/20” dia) 363.5 km pipeline, including installation   Completed&lt;br /&gt;
&lt;br /&gt;
of Cathodic Protection System, OFC laying and 15 Nos. stations	Jul 2002&lt;br /&gt;
&lt;br /&gt;
comprising sectionalising valve stations, intermediate pigging station,&lt;br /&gt;
&lt;br /&gt;
despatch/receiving terminals and intermediate pumping stations for&lt;br /&gt;
&lt;br /&gt;
multi-product pipeline.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
48	Amboli-Jhagadia	Gujarat Gas	Design engineering and laying of bundle of pipes (24” dia) 1,248 m	Completed&lt;br /&gt;
	Gas Pipeline	Co Ltd	pipe with 2 Nos. 3” CS with 2” HDPE interduct conduit with OFC	Apr 2002&lt;br /&gt;
			across Narmada river by Horizontal Directional Drilling method.	&lt;br /&gt;
49	Barauni-Patna	Indian Oil	Laying of (20” dia) 1,900 m pipeline with 3” CS conduit interducted	Completed&lt;br /&gt;
	Replacement	Corp Ltd	with 2” HDPE conduit across the Ganges river by Horizontal	Mar 2002&lt;br /&gt;
	Pipeline		Directional Drilling method.	&lt;br /&gt;
50	Mathura-Tundla	Indian Oil	Installation of (16” dia) API 5L Grade X 65 1,008 m pipeline across	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	Yamuna river by Horizontal Directional Drilling method.	Jun 2000&lt;br /&gt;
51	Jamnagar-Loni	Gas Authority	Laying and installation of (16”/12” dia) 435 km LPG pipelines and	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	associated systems/facilities for Sections III and IV.	May 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
52	Jamnagar-Loni	Gas Authority	Installation of (12” dia) API 5L Grade X 65 650 m pipeline and OFC	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	across Yamuna river by Horizontal Directional Drilling method.	Apr 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
53	Outfall-Jetty-MTF Reliance Ports	Construction of civil foundation, supply fabrication and erection	Completed&lt;br /&gt;
	Area Pipeline	and Terminals	of pipe racks and pipe supports, fabrication and installation of	Jul 1999&lt;br /&gt;
		Ltd	aboveground and underground pipelines (2 x 48” dia, 6 x 24” dia,	&lt;br /&gt;
			1 x 16” dia, 1 x 12” dia, 2 x 10” dia and 1 x 8” dia CS pipes with	&lt;br /&gt;
			2 x 24” dia and 1 x 4” dia GRE pipes) at Jamnagar Refinery.	&lt;br /&gt;
54	Mumbai-Manmad Bharat Petroleum	Construction of (18” dia) 253 km multi-product pipeline from Mahul	Completed&lt;br /&gt;
	Pipeline	Corp Ltd/	Refinery to Marketing Terminal at Manmad, including 47 km of city	May 1999&lt;br /&gt;
		Engineers	area, Horizontal Directional Drilling of Ulhas river, 125 km through	&lt;br /&gt;
		India Ltd	rocky terrain. Laying, splicing, jointing of OFC.	&lt;br /&gt;
55	Hazira-	Gujarat Gas	Laying of (18” dia) 75 km gas pipeline.	Completed&lt;br /&gt;
	Ankleshwar	Co Ltd		May 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
56	Effluent Outfall	Indian	Engineering, procurement and construction of 20” dia effluent	Completed&lt;br /&gt;
	System	Petrochemicals	discharge systems into Gulf of Khambhat for IPCL Gandhar gas	May 1999&lt;br /&gt;
		Corp Ltd/	processing complex at Dahej, comprising 4.5 km long onshore	&lt;br /&gt;
		Engineers	section and 3.1 km long offshore section, complete with diffuser.	&lt;br /&gt;
		India Ltd		&lt;br /&gt;
57	Beanibazar-	Gas Transmission	Construction of twin-line (20” dia) 18 km natural gas pipeline,	Completed&lt;br /&gt;
	Kailashtilla	Co Ltd	including interconnecting pipelines at gas fields in Bangladesh.	Apr 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
58	Propylene	Reliance	Fabrication and erection of 12” dia aboveground and underground	Completed&lt;br /&gt;
	Pipeline in MTF	Industries Ltd	piping and allied underground work such as Cathodic Protection of	Mar 1999&lt;br /&gt;
	Area		piping at Jamnagar Refinery.	&lt;br /&gt;
59	Thal-Usar-Thal	Gas Authority	Laying of twin-gas pipeline of (26”/20” dia) 20 km from RCF complex	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	at Thal to LPG recovery terminal at Usar.	May 1998&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
&lt;br /&gt;
# Haldia-Barauni Crude Oil Pipeline   &lt;br /&gt;
#* Indian Oil Corp Ltd&lt;br /&gt;
#* Installation of (18” dia) API 5L Grade X 65 724 m pipeline and OFC across Rupnarayan river and Harohar river by Horizontal Directional Drilling method.&lt;br /&gt;
#* Completed Apr 1998&lt;br /&gt;
&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
61	Multi-product	Kumpunan Juri	Construction of (16” dia) 128 km multi-product pipeline from Melaka	Completed&lt;br /&gt;
	Pipeline	Teknik Sdn. Bhd.,	Refinery along the west coast of Malaysian Peninsula to Kuala	Jul 1997&lt;br /&gt;
		NKK Corp and	Lumpur International Airport and a new distribution terminal at Klang	&lt;br /&gt;
		Nichimen Corp	Valley for Petronas and Shell Malaysia.	&lt;br /&gt;
		(Joint Venture)		&lt;br /&gt;
62	Gas	Gas Authority	Detailed engineering, procurement, construction and pre-	Completed&lt;br /&gt;
	Rehabilitation	of India Ltd/	commissioning of pipeline system of 349 km section of Bijaipur-	Mar 1997&lt;br /&gt;
	and Expansion	Engineers	Dadri gas pipeline; Bijaipur-Burda (36” dia) 170 km; Bhojera-Dadri	&lt;br /&gt;
		India Ltd	(36” dia) 165 km and (14” dia) 14 km spurline to Faridabad, including	&lt;br /&gt;
			sectionalising stations, scraper stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, Cathodic Protection,	&lt;br /&gt;
			instrumentation and laying of OFC work.	&lt;br /&gt;
63	Raw Water	Reliance	Construction and laying of (48” dia) 20 km raw water pipeline,	Completed&lt;br /&gt;
	System	Industries and	approach bridge and intake well on Tapi river at Hazira.	Feb 1996&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
64	Kandla-Bhatinda	Skoda Export/	Laying of 557 km product pipeline: Sanganer-Karnal (22” dia)	Completed&lt;br /&gt;
	Pipeline	Indian Oil Corp	339 km and Karnal-Bhatinda (14” dia) 218 km, 10 Horizontal	Feb 1996&lt;br /&gt;
			Directional Drilling crossing of canals. Laying, splicing,	&lt;br /&gt;
			jointing of OFC.	&lt;br /&gt;
65	Perennial River	Gas Authority	Installation of (12” dia) API 5L Grade X 42 874 m pipeline across	Completed&lt;br /&gt;
	Crossing	of India Ltd/	Sabarmati river by Horizontal Directional Drilling method.	Feb 1996&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
66	NGL Pipeline	Reliance	Fabrication, laying and testing of (18” dia) 7 km NGL/HSD pipelines	Completed&lt;br /&gt;
		Industries Ltd	from RIL to ONGC and interconnection with Essar lines for SBM	Dec 1995&lt;br /&gt;
			Project at RIL Hazira.	&lt;br /&gt;
&lt;br /&gt;
# [[Bassein Oil And Gas Field]]&lt;br /&gt;
#* Oil and Natural Gas Corp Ltd&lt;br /&gt;
#* Hyundai Heavy Industries Ltd&lt;br /&gt;
#* South Bassein - Hazira Trunkline&lt;br /&gt;
 #* Laying of (42” dia) 21 km onshore portion of pipeline, including shore approach and tidal flats&lt;br /&gt;
#* May 1995&lt;br /&gt;
				&lt;br /&gt;
				&lt;br /&gt;
68	Gandhar-Zanor	Gas Authority of	Laying of (18” dia) 40 km gas pipeline to NTPC plant in Gujarat.	Completed&lt;br /&gt;
	Pipeline	India Ltd		Mar 1995&lt;br /&gt;
69	JNPT Pipeline	Reliance	Laying of twin (8” dia) 23 km and (16” dia) 6 km product pipeline	Completed&lt;br /&gt;
		Industries and	from Kalamboli to Nhava Sheva.	Dec 1994&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
70	RSEB Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Gamnewalan to	Completed&lt;br /&gt;
	Pipeline	India Ltd	Ramgarh in Rajasthan.	Apr 1994&lt;br /&gt;
71	Balongan-Jakarta PT Trihasra	Laying of (16” dia) 210 km multi-product pipeline through marshes,	Completed&lt;br /&gt;
	Product Pipeline	Bimanusa	city area and multiple crossings in Indonesia.	Dec 1993&lt;br /&gt;
		Tunggal/		&lt;br /&gt;
		Pertamina		&lt;br /&gt;
72	Jarn Yaphour	Abu Dhabi	Construction of wellheads, flow lines, manifold, transfer line and	Completed&lt;br /&gt;
	Field	National Oil	related work in association with Sigma Specialised Engineering	Oct 1993&lt;br /&gt;
	Development	Co Ltd/	and Construction Ltd, Abu Dhabi, UAE.	&lt;br /&gt;
	(Upstream)	Snamprogetti		&lt;br /&gt;
&lt;br /&gt;
73 Raw Water Intake Chambal&lt;br /&gt;
&lt;br /&gt;
System	Fertilisers and&lt;br /&gt;
&lt;br /&gt;
Chemicals Ltd&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Design, procurement, erection and commissioning of raw water	Completed&lt;br /&gt;
&lt;br /&gt;
system comprising approach bridge, intake well, tunnel, pumping	Jun 1993&lt;br /&gt;
&lt;br /&gt;
station and (24” dia) 7 km pipeline for Gadepan plant.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
74	Grasim Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Thal to Grasim plant	Completed&lt;br /&gt;
	Pipeline	India Ltd/PDIL	in Raigad District, Maharashtra, including laying of pipeline across	Nov 1992&lt;br /&gt;
			Kundalika river (span 1,200 m).	&lt;br /&gt;
75	City Gas	Gujarat Gas	Laying of 11 km of pipeline for Surat Gas Distribution Grid, including	Completed&lt;br /&gt;
	Distribution	Co Ltd	associated facilities.	May 1991&lt;br /&gt;
	System			&lt;br /&gt;
76	Gandhar-Bharuch Oil and Natural	Laying of (18” dia) 42 km gas pipeline to GNFC fertiliser plant	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	at Bharuch.	Mar 1991&lt;br /&gt;
77	Dahej-Gandhar	Oil and Natural	Laying of (8” dia) 40 km gas pipeline in Gujarat.	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd		May 1989&lt;br /&gt;
78	Kalol-Navagam	Oil and Natural	Laying of (14” dia) 80 km oil pipeline from North Kadi CTF to	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	Navagam in Gujarat.	Mar 1989&lt;br /&gt;
79	Haldia-	Indian Oil	Laying section of (12” dia) 18.5 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	18.5 km existing corroded pipeline in West Bengal.	May 1987&lt;br /&gt;
	Pipeline Phase II			&lt;br /&gt;
80	Haldia-Barauni	Indian Oil	Laying section of (12” dia) 25 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	25 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
81	Haldia-	Indian Oil	Laying section of (12” dia) 30 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	30 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
	Pipeline, Phase I			&lt;br /&gt;
82	Mumbai-Pune	Hindustan	Laying of (14” dia) 160 km pipeline for transportation of petroleum	Completed&lt;br /&gt;
	Product Pipeline	Petroleum Corp	products through the western mountain range, highly congested	Dec 1985&lt;br /&gt;
		Ltd/Indian Oil	city areas and the crossing of marshy areas, rivers and highways.	&lt;br /&gt;
		Corp Ltd		&lt;br /&gt;
83	Ankleshwar-	Oil and	Reconditioning of (16” dia) and (14” dia) 30 km crude oil pipeline	Completed&lt;br /&gt;
	Baroda Pipeline	Natural Gas	in Gujarat.	Feb 1985&lt;br /&gt;
		Commission Ltd&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76626</id>
		<title>Hazira LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76626"/>
		<updated>2026-01-28T16:00:02Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;+++ Summary Information&lt;br /&gt;
&lt;br /&gt;
* Ownership: Hazira LNG, (Shell / Total)&lt;br /&gt;
* Website: http://www.haziralng.com/&lt;br /&gt;
** List of [[Shell LNG Terminals]]&lt;br /&gt;
* Location: Hazira, Gujarat, India &lt;br /&gt;
* Capacity: 2.5 million tons/annum &lt;br /&gt;
* Status: In Operation&lt;br /&gt;
&lt;br /&gt;
+++ Brief Description&lt;br /&gt;
* Hazira LNG Terminal is designed as a 5 million ton import terminal&lt;br /&gt;
* It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible&lt;br /&gt;
&lt;br /&gt;
+++ Technical Details&lt;br /&gt;
* Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each &lt;br /&gt;
* Unloading capacity:&lt;br /&gt;
* Send out capacity: &lt;br /&gt;
* Constructor: &lt;br /&gt;
** Designed by Shell Global Solutions (SGSI) &lt;br /&gt;
** Managing Contractors  – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium)&lt;br /&gt;
** Tanks – Punj Lloyd Limited &lt;br /&gt;
** Causeway and spurs – Larsen &amp;amp;Toubro Jetty - &lt;br /&gt;
** Afcons Civil Building – Simplex    &lt;br /&gt;
** **Tractebel Engineering:** Executing FEED, EPC ITB &amp;amp; selection of EPC Contractor and Owner's Engineering services for the expansion&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ Ongoing Projects/Project Status&lt;br /&gt;
* The project is designed to be expandable to 5 million tons capacity&lt;br /&gt;
* It is currently undergoing expansion which will be completed in 2012&lt;br /&gt;
* In addition, there is potential to expanded to 10 million tons&lt;br /&gt;
&lt;br /&gt;
+++ Suppliers / Customers&lt;br /&gt;
* Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes&lt;br /&gt;
* Customers: Connected to the local grid, to serve both industrial and domestic customers.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2005 - Terminal commences operations&lt;br /&gt;
* 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal  | Qatargas 4]]&lt;br /&gt;
&lt;br /&gt;
+++ Other Information&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
+++ Relevant Links&lt;br /&gt;
# [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell]&lt;br /&gt;
# [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India]&lt;br /&gt;
# [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012]&lt;br /&gt;
# [[Tractebel Engineering LNG References]]&lt;br /&gt;
# [[Saipem LNG References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76625</id>
		<title>Hazira LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Hazira_LNG_Terminal&amp;diff=76625"/>
		<updated>2026-01-28T15:59:44Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;+++ Summary Information&lt;br /&gt;
&lt;br /&gt;
* Ownership: Hazira LNG, (Shell / Total)&lt;br /&gt;
* Website: http://www.haziralng.com/&lt;br /&gt;
 * List of [[[Shell LNG Terminals]]] &lt;br /&gt;
* Location: Hazira, Gujarat, India &lt;br /&gt;
* Capacity: 2.5 million tons/annum &lt;br /&gt;
* Status: In Operation&lt;br /&gt;
&lt;br /&gt;
+++ Brief Description&lt;br /&gt;
* Hazira LNG Terminal is designed as a 5 million ton import terminal&lt;br /&gt;
* It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible&lt;br /&gt;
&lt;br /&gt;
+++ Technical Details&lt;br /&gt;
* Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each &lt;br /&gt;
* Unloading capacity:&lt;br /&gt;
* Send out capacity: &lt;br /&gt;
* Constructor: &lt;br /&gt;
** Designed by Shell Global Solutions (SGSI) &lt;br /&gt;
** Managing Contractors  – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium)&lt;br /&gt;
** Tanks – Punj Lloyd Limited &lt;br /&gt;
** Causeway and spurs – Larsen &amp;amp;Toubro Jetty - &lt;br /&gt;
** Afcons Civil Building – Simplex    &lt;br /&gt;
** **Tractebel Engineering:** Executing FEED, EPC ITB &amp;amp; selection of EPC Contractor and Owner's Engineering services for the expansion&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ Ongoing Projects/Project Status&lt;br /&gt;
* The project is designed to be expandable to 5 million tons capacity&lt;br /&gt;
* It is currently undergoing expansion which will be completed in 2012&lt;br /&gt;
* In addition, there is potential to expanded to 10 million tons&lt;br /&gt;
&lt;br /&gt;
+++ Suppliers / Customers&lt;br /&gt;
* Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes&lt;br /&gt;
* Customers: Connected to the local grid, to serve both industrial and domestic customers.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
+++ History&lt;br /&gt;
* 2005 - Terminal commences operations&lt;br /&gt;
* 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal  | Qatargas 4]]&lt;br /&gt;
&lt;br /&gt;
+++ Other Information&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
+++ Relevant Links&lt;br /&gt;
# [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell]&lt;br /&gt;
# [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India]&lt;br /&gt;
# [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012]&lt;br /&gt;
# [[Tractebel Engineering LNG References]]&lt;br /&gt;
# [[Saipem LNG References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76624</id>
		<title>Karakuduk Oil and Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76624"/>
		<updated>2026-01-28T15:42:53Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Links */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Lukoil &lt;br /&gt;
* Country: Kazakhstan &lt;br /&gt;
* Location: Mangistau Region&lt;br /&gt;
* Production start: &lt;br /&gt;
* Partners: &lt;br /&gt;
* Type: Oil / Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Karakuduk field is located in the coastal zone of the Caspian Sea, on the north-eastern part of the Buzachi peninsula.&lt;br /&gt;
* The field has a central processing unit and a gas treatment unit&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 1972 - Karakuduk Oil And Gas Field discovered&lt;br /&gt;
* 1998 - Commercial development launched&lt;br /&gt;
* 2005 - Lukoil become a partner&lt;br /&gt;
* 2008 - Gas treatment unit was commissioned&lt;br /&gt;
* 2015 - Sinopec acquired the field from Lukoil&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.lukoil.com/materials/doc/FactBook/2012/part03eng.pdf Lukoil Factbook 2012]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:10-millionth-ton-of-oil-produced-on-karakuduk-field 10-Millionth Ton Of Oil Produced On Karakuduk Field In Kazakhstan]&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:Kazakhstan]]&lt;br /&gt;
[[category:Sinopec]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76623</id>
		<title>Karakuduk Oil and Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76623"/>
		<updated>2026-01-28T15:42:17Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Lukoil &lt;br /&gt;
* Country: Kazakhstan &lt;br /&gt;
* Location: Mangistau Region&lt;br /&gt;
* Production start: &lt;br /&gt;
* Partners: &lt;br /&gt;
* Type: Oil / Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Karakuduk field is located in the coastal zone of the Caspian Sea, on the north-eastern part of the Buzachi peninsula.&lt;br /&gt;
* The field has a central processing unit and a gas treatment unit&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 1972 - Karakuduk Oil And Gas Field discovered&lt;br /&gt;
* 1998 - Commercial development launched&lt;br /&gt;
* 2005 - Lukoil become a partner&lt;br /&gt;
* 2008 - Gas treatment unit was commissioned&lt;br /&gt;
* 2015 - Sinopec acquired the field from Lukoil&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.lukoil.com/materials/doc/FactBook/2012/part03eng.pdf Lukoil Factbook 2012]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:10-millionth-ton-of-oil-produced-on-karakuduk-field 10-Millionth Ton Of Oil Produced On Karakuduk Field In Kazakhstan]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76622</id>
		<title>Karakuduk Oil and Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Karakuduk_Oil_and_Gas_Field&amp;diff=76622"/>
		<updated>2026-01-28T12:26:00Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Lukoil &lt;br /&gt;
* Country: Kazakhstan &lt;br /&gt;
* Location: Mangistau Region&lt;br /&gt;
* Production start: &lt;br /&gt;
* Partners: &lt;br /&gt;
* Type: Oil / Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Karakuduk field is located in the coastal zone of the Caspian Sea, on the north-eastern part of the Buzachi peninsula.&lt;br /&gt;
* The field has a central processing unit and a gas treatment unit&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 1972 - Karakuduk Oil And Gas Field discovered&lt;br /&gt;
* 1998 - Commercial development launched&lt;br /&gt;
* 2005 - Lukoil become a partner&lt;br /&gt;
* 2008 - Gas treatment unit was commissioned&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.lukoil.com/materials/doc/FactBook/2012/part03eng.pdf Lukoil Factbook 2012]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:10-millionth-ton-of-oil-produced-on-karakuduk-field 10-Millionth Ton Of Oil Produced On Karakuduk Field In Kazakhstan]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kumkol_Oil_Field&amp;diff=76621</id>
		<title>Kumkol Oil Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kumkol_Oil_Field&amp;diff=76621"/>
		<updated>2026-01-28T12:09:15Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: PetroKazakhstan&lt;br /&gt;
* Country: Kazakhstan &lt;br /&gt;
* Location: &lt;br /&gt;
* Production start: 1986&lt;br /&gt;
* Partners: CNPC &amp;amp; KMG&lt;br /&gt;
* Type: Oil&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Kumkol field is located in the southern part of the Turgai Depression (southern Kazakhstan)&lt;br /&gt;
* Oil is delivered to export via the [[Caspian Pipeline Consortium Oil Pipeline]] and is also supplied to the [[Shymkent Refinery]]&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 1984 - Kumkol Oil Field discovered&lt;br /&gt;
* 1986 - Commercial development launched&lt;br /&gt;
* 1991 - Hurricane Hydrocarbons became a partner&lt;br /&gt;
* 2005 - CNPC acquired Hurricane&lt;br /&gt;
* 2007 - KMG became a 50% partner&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.lukoil.com/materials/doc/FactBook/2012/part03eng.pdf Lukoil Factbook 2012]&lt;br /&gt;
# [https://petrokazakhstan.kz/en/about-the-company-2/company-history-en/ PetroKazakhstan history]&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:Kazakhstan]]&lt;br /&gt;
[[category:CNPC]]&lt;br /&gt;
[[category:KMG]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76620</id>
		<title>Punj Lloyd Pipeline References</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76620"/>
		<updated>2026-01-28T12:08:10Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# [[Shah Gas Field]]&lt;br /&gt;
#*  Gas Gathering Package 1– Abu Dhabi Development Co Ltd&lt;br /&gt;
#* Engineering, procurement, installation, commissioning assistance of eight well pad systems, (16” dia) 18 km four inter-pad lines (24” dia) 31 km four transfer lines and flow lines from the individual wells to their associated well pad. &lt;br /&gt;
#* Facilities include leak detection, Cathodic Protection, wellhead control, flow gathering and measurement,	pressure protection, flare and drain, fire and gas detection, telecommunication and security systems etc., near the Shah processing facility in western region of Abu Dhabi&lt;br /&gt;
#* Ongoing Aug 2014&lt;br /&gt;
# Sabah Sarawak Gas Pipeline - 2&lt;br /&gt;
#* Malaysia - Sabah Sarawak&lt;br /&gt;
#* Petronas Carigali&lt;br /&gt;
#* Engineering, procurement, construction and commissioning of 36&amp;quot; 521 km gas pipeline from Kimanis, Sabah to Bintulu, Sarawak,	with Cathodic Protection, compressor stations, metering stations, intermediate scraper stations and launcher station, receiver station, 22 block valve stations, six future tap off points along the pipeline, SCADA, telecommunication, leak detection, fire &amp;amp; gas system and a gas management system.&lt;br /&gt;
#* Ongoing Jul 2012&lt;br /&gt;
				&lt;br /&gt;
				&lt;br /&gt;
			&lt;br /&gt;
			&lt;br /&gt;
				&lt;br /&gt;
3	Strategic Gas	Qatar Petroleum	Engineering, procurement and construction of (36” dia) 124 km and	Ongoing&lt;br /&gt;
	Transmission,		87 km twin pipeline, OFC laying, station work, construction of six	Jun 2011&lt;br /&gt;
	Qatar		block valve stations, modification and expansion of existing stations	&lt;br /&gt;
			and construction of new station, relocation of 11 KV overhead	&lt;br /&gt;
			power line in the pipeline route.	&lt;br /&gt;
&lt;br /&gt;
4	El Khoms-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline Gas		&lt;br /&gt;
	Compressor		&lt;br /&gt;
	Stations, Libya		&lt;br /&gt;
5	Melita-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline, Libya		&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Balance work of (34’’ dia) 157 km gas pipeline, civil and mechanical  Ongoing&lt;br /&gt;
&lt;br /&gt;
work on gas metering stations, compressor stations at Sidra and	Jun 2011&lt;br /&gt;
&lt;br /&gt;
Wachkah including SCADA and telecommunication.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (34” dia) 98 km	Ongoing&lt;br /&gt;
&lt;br /&gt;
pipeline from Melita to Tripoli with (24” dia) 21 km branchline	Jun 2011&lt;br /&gt;
&lt;br /&gt;
including gas reducing, metering, compression stations and&lt;br /&gt;
&lt;br /&gt;
telecommunication work.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
6	Dahej-Vijaipur	Gas Authority of	Construction of (48&amp;quot; dia) 145.43 km natural gas pipeline from Dahej	Ongoing,&lt;br /&gt;
	Pipeline	India Ltd	to Jambudi, Spread-1, OFC laying, mechanical, electrical and	Feb 2011&lt;br /&gt;
	Upgradation		instrumentation work at Dahej despatch station, six sectionalising	&lt;br /&gt;
			valve stations, one intermediate pigging station, including civil,	&lt;br /&gt;
			structural and architectural work.	&lt;br /&gt;
7	Oil &amp;amp; Gas Export	Agip KCO	Detailed engineering, procurement and construction of (24” dia)	Onging&lt;br /&gt;
	Pipelines,		49.5 km oil pipeline with two crossings by horizontal directional	Dec 2010&lt;br /&gt;
	Kashagan,		drilling method and 90 km gas pipeline in Atyrau region of western	&lt;br /&gt;
	Kazakhstan		Kazakhstan.	&lt;br /&gt;
8	Darod-Jafrabad	Gujarat State	Engineering, procurement and construction of (24&amp;quot; dia) 103 km	Ongoing&lt;br /&gt;
	Pipeline	Petronet Ltd	crude oil pipeline, Section B from Tana to Jafrabad.	Sep 2010&lt;br /&gt;
9	Multi Product	Qatar Petroleum	Engineering, procurement, construction and installation of (18&amp;quot; dia)	Ongoing&lt;br /&gt;
	Pipeline, Qatar		46 km multiproduct pipeline, OFC laying from Messaieed refinery to	Aug 2010&lt;br /&gt;
			Doha depot and station work at Mesaieed refinery and Doha depot	&lt;br /&gt;
			including demolition.	&lt;br /&gt;
10	Doha Urban	Qatar Petroleum	Engineering, procurement, construction and commissioning of	Ongoing&lt;br /&gt;
	Pipeline		(36”, 12’’ and 8’’ dia) 97.2 km gas pipelines, three new stations,	Aug 2010&lt;br /&gt;
	Relocation,		six modification stations, decommissioning of existing pipelines and	&lt;br /&gt;
	Qatar		demolition of nine existing stations.	&lt;br /&gt;
11	Reliance	Cairn Energy	Engineering, procurement, construction, installation, testing and	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	commissioning of heated and insulated (24” dia) 7.2 km crude oil	Jun 2010&lt;br /&gt;
			insulated pipeline, corrosion coated, PUF insulation completed	&lt;br /&gt;
			with Skin Effect Tubing and HDPE outer sleeve and cables of heat	&lt;br /&gt;
			tracing.	&lt;br /&gt;
12	Essar Spurline	Cairn Energy	Procurement, construction and Installation of (24&amp;quot; dia) 3.3 km	Completed&lt;br /&gt;
		India Pty Ltd	crude oil insulated spurline and receiving facility within Essar Oil	May 2010&lt;br /&gt;
			Refinery for Mangla Development Pipeline, OFC laying, 3.3 km	&lt;br /&gt;
			Skin Effect Heat Management System, mechanical, electrical and	&lt;br /&gt;
			instrumentation work at AGI Salaya &amp;amp; Essar Receiving Facility	&lt;br /&gt;
			including civil, structural and architectural work.	&lt;br /&gt;
13	Mangla	Cairn Energy	Engineering, procurement and construction of (24&amp;quot; dia) 57 km crude	Completed&lt;br /&gt;
	Development	India Pty Ltd	oil insulated pipeline and (8&amp;quot; dia) 57 km gas pipeline upto Salaya	Apr 2010&lt;br /&gt;
	Pipeline I &amp;amp; II		AGI Station, 56.52 km Skin Effect Heat Management System,	&lt;br /&gt;
			mechanical, electrical, civil, structural and architectural work.	&lt;br /&gt;
14	Radhanpur	Cairn Energy	Engineering, procurement and construction of (10&amp;quot; dia) 22 km	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	crude oil insulated pipeline upto IOCL Radhanpur Terminal, OFC	Mar 2010&lt;br /&gt;
			laying, skin Effect Heat Management System, mechanical, electrical,	&lt;br /&gt;
			instrumentation, civil, structural and architectural work.	&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Stabilisation and Sweetening	Train, Aksai		&lt;br /&gt;
#* Installation of 26,000 inch dia piping and equipment erection at Karachaganak Oil &amp;amp; Gas Condensate Field in Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# Ras Laffan Olefins Co&lt;br /&gt;
#* UAE&lt;br /&gt;
#* Ethylene and Butene Pipelines, 		&lt;br /&gt;
#* Construction of (14’’ dia) 129.6 km, (10’’ dia) 5.1 km dense phase ethylene pipelines and (3’’ dia) 5.1 km butane pipeline from Ras Laffan to Mesaieed including scraper launcher, receiver, four block valve stations, satellite and station S, Cathodic Protection, OFC, pre-commissioning and commissioning assistance.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Karachaganak-Uralsk Gas Pipeline&lt;br /&gt;
#* Laying of pipeline by HDD across five rivers Gnyloy Lake, Ural,	Barabastau, Karoba and Utva with a total length 3320 m. Executed longest HDD crossing of Ural River, 1015 m in Kazakhstan.&lt;br /&gt;
#* Completed Oct 2009&lt;br /&gt;
&lt;br /&gt;
	&lt;br /&gt;
18	OGC Pipelines,	Oman Gas Co	Engineering, procurement and construction of :	Completed&lt;br /&gt;
	Oman		• (24’’ dia) 40 km Murayrat-Barka, Russayl Looplines	Sep 2009&lt;br /&gt;
			• Barka PRT Expansion	&lt;br /&gt;
			• (32” dia) 252 km Saih Rawl-Mukhaizna Loopline	&lt;br /&gt;
			• Three compressor stations at Nimr including scraper launcher,	&lt;br /&gt;
			receiver, seven block valve stations, Cathodic Protection, SCADA	&lt;br /&gt;
			telecommunication, pre-commissioning and commissioning.	&lt;br /&gt;
19	Asab Gas	Eastern Bechtel	Construction of (16” dia) 82 km pipeline from Habshan to Asab,	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase II	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
20	Onshore Gas	Eastern Bechtel	Construction of (24”, 20” dia) 105 km pipeline from Habshan to	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi Ruwais, UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase III	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
21	Dabhol Panvel	Gas Authority of	Engineering, procurement and commissioning of (30&amp;quot; dia) 50.3 km	Completed&lt;br /&gt;
	Pipeline Phase II	India Ltd	natural gas pipeline from Ambewadi despatch terminal to Usar	Jun 2009&lt;br /&gt;
			receiver terminal including spurlines to NITCO, and two	&lt;br /&gt;
			sectionalising valve stations, one crossing by HDD across	&lt;br /&gt;
			Amba river.	&lt;br /&gt;
22	East-West	Reliance Gas	Construction of (48&amp;quot; dia) 2.3 km natural gas pipeline in the western	Completed&lt;br /&gt;
	Gas Pipeline	Transportation	mountain range with steep slope upto 70O by cable crane system	Feb 2009&lt;br /&gt;
	(Bhivpuri Ghat)	Infrastructure Ltd	with specialised crew.	&lt;br /&gt;
23	East-West Gas	Reliance Gas	Construction and laying of (48&amp;quot; dia) 117.5 km natural gas pipeline	Completed&lt;br /&gt;
	Pipeline	Transportation	with automatic / semi-automatic welding technology, including three	Jan 2009&lt;br /&gt;
	Spread 6A &amp;amp; 6B	Infrastructure Ltd	sectionalising valve stations and two compressor stations.	&lt;br /&gt;
24	Eastern Gas	Dolphin Energy	Engineering, procurement and construction of 260 km OFC with	Completed&lt;br /&gt;
	Distribution	Ltd (DEL)	earthwork along the Jebel Ali – Taweela – Maqta - Al Ain pipeline,	Nov 2008&lt;br /&gt;
	System Upgrade,		mechanical and coating repairs on pipelines and restoration of	&lt;br /&gt;
	UAE		damaged berms.	&lt;br /&gt;
&lt;br /&gt;
# [[Bu Hasa Oil Field]]&lt;br /&gt;
#* Adco&lt;br /&gt;
#* Flowlines &amp;amp; WellHeads	&lt;br /&gt;
#* Wellhead, flow line, water injection line installations, tie-in to existing injection header, tie-ins at header/manifold, physical tagging. including pre-commissioning and commissioning support.&lt;br /&gt;
#* Oct 2008&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
26	South Sumatra	PT Perusahaan	&lt;br /&gt;
	to West Java Gas	Gas Negara/JFE	&lt;br /&gt;
	Pipeline Phase I,	Engineering	&lt;br /&gt;
	Sumatra		&lt;br /&gt;
27	Dabhol Panvel	Gas Authority of	&lt;br /&gt;
	Pipeline Phase I	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (32” dia) 270 km	Completed&lt;br /&gt;
&lt;br /&gt;
onshore pipeline installation from Pagardewa to Labuhan Maringgai,  Sept 2008&lt;br /&gt;
&lt;br /&gt;
including sectionalising valve stations, civil, mechanical, piping,&lt;br /&gt;
&lt;br /&gt;
instrumentation, insulation work at Pagardewa, Terbanggi Besar and&lt;br /&gt;
&lt;br /&gt;
Labuhan Maringgai, Indonesia.&lt;br /&gt;
&lt;br /&gt;
Residual engineering, procurement (excluding supply of line pipe)	Completed&lt;br /&gt;
&lt;br /&gt;
installation, testing, commissioning of pipeline and associated	Feb 2008&lt;br /&gt;
&lt;br /&gt;
facilities for (30” dia) 113 km pipeline including EGP, permanent pig&lt;br /&gt;
&lt;br /&gt;
launcher, receiver, signalers, actuators for actuated valves, CCVT/&lt;br /&gt;
&lt;br /&gt;
TEG, permanent Cathodic Protection System, interference surveys&lt;br /&gt;
&lt;br /&gt;
and implementation of mitigation measures for CP System.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
28	Dahej-Uran	Gas Authority&lt;br /&gt;
	Pipeline	of India&lt;br /&gt;
29	Mundra Delhi	Hindustan&lt;br /&gt;
	Pipeline	Petroleum&lt;br /&gt;
		Corp Ltd&lt;br /&gt;
30	South Sumatra	PT Perusahaan&lt;br /&gt;
	to West Java Gas	Gas Negara&lt;br /&gt;
	Pipeline, Phase II	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Laying of	(30” dia) 144 km pipeline and associated facilities	Completed&lt;br /&gt;
including eight crossings by horizontal directional drilling method.	May 2007&lt;br /&gt;
Laying of	(18” dia) 434 km, (16” dia) 73 km and (8” dia) 35.7 km	Completed&lt;br /&gt;
pipeline and associated facilities including construction, testing,	May 2007&lt;br /&gt;
pre-commissioning and commissioning assistance.	&lt;br /&gt;
&lt;br /&gt;
Design, construction, testing and mechanical completion of (32” dia) Completed 270 km pipeline from Pagardewa to Labuhan Maringgai and (28” dia) Mar 2007 4 km pipeline from Pagardewa receiving point to Pagardewa Station&lt;br /&gt;
&lt;br /&gt;
including 9 crossings by HDD, 24 core OFC laying, 4 sectional valve stations and Cathodic Protection at Sumatra, Indonesia.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
31	Mumbai-	Bharat Petroleum	Supply, construction of (16” dia) 332 km pipeline and piping systems, Completed&lt;br /&gt;
	Manmad-	Corp Ltd	Cathodic Protection, road/rail/water crossings, pre – commissioning	Mar 2007&lt;br /&gt;
	Manglya Pipeline		including terminal piping work, commissioning assistance and	&lt;br /&gt;
			hook-up work at terminals, associated mechanical, civil, structural,	&lt;br /&gt;
			architectural, electrical, telecom and instrumentation work from	&lt;br /&gt;
			Manglya Despatch Terminal to sectionalising valve station at Manglya	&lt;br /&gt;
			to Piyala/Bijwasan.	&lt;br /&gt;
32	Pune-Solapur	Hindustan	Procurement, construction, pre-commissioning and commissioning	Completed&lt;br /&gt;
	Pipeline	Petroleum	assistance for (14” dia) 182 km and (12” dia) 161 km pipeline,	Mar 2007&lt;br /&gt;
		Corp Ltd	including 9 sectionalising valve stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, rotating equipment, Cathodic	&lt;br /&gt;
			Protection, instrumentation and OFC laying work.	&lt;br /&gt;
33	Huwailah Field	Abu Dhabi Co	Construction of flowlines &amp;amp; transfer line (10’’ dia) 30 km in Huwaila,	Completed&lt;br /&gt;
	Development	for Onshore	UAE.	Dec 2006&lt;br /&gt;
		Oil Operations		&lt;br /&gt;
		(ADCO)/Matrix		&lt;br /&gt;
		Construction		&lt;br /&gt;
# [[Tengiz Oil Field]]&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* Large and Small-Bore Pipelines for TCO Asset Development&lt;br /&gt;
#* Tengizchevroil (TCO)/PFD International LLC (Parsons/Fluor Daniel JV)&lt;br /&gt;
#* Construction of pipelines and flow lines 408 km LTCS piping fabrication (181,000 inch dia), erection (115,000 inch metre) and high pressure thick walled injection piping work upto 63 mm,	HPPE pipe fusion welding and laying, equipment installation, civil, structural, painting, insulation work at Tengiz, Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2006	&lt;br /&gt;
# [[Tambora Gas Field]]&lt;br /&gt;
#* Indonesia&lt;br /&gt;
#* Tambora Phase II, &lt;br /&gt;
#* Total E&amp;amp;P&lt;br /&gt;
#* Engineering, procurement, supply and construction of gas pipeline&lt;br /&gt;
#* Completed&lt;br /&gt;
#* EPSC 2 for	Indonesie	network in swamp risers and dogleg installation to Gathering Testing&lt;br /&gt;
#* Jun 2006&lt;br /&gt;
	Pipeline Network,		Satellite Stations (GTS) and wellhead platforms:	&lt;br /&gt;
	Indonesia		•  24” dia line	&lt;br /&gt;
			•  8” dia flow lines and 2” piggy back as gas instrument line	&lt;br /&gt;
			•  5 km crossing of existing facilities and river by Horizontal	&lt;br /&gt;
			Directional Drilling method	&lt;br /&gt;
			•  2 river crossings by open cut method	&lt;br /&gt;
&lt;br /&gt;
36 Direct Gas	BG Exploration	&lt;br /&gt;
Marketing	and Production	&lt;br /&gt;
	India Ltd/	&lt;br /&gt;
	Kvaerner Power	&lt;br /&gt;
	Gas	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Civil, mechanical and structural work for construction at ONGC	Completed&lt;br /&gt;
&lt;br /&gt;
Plant, Hazira.	Jan 2006&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
37	Oman Gas	Petroleum	Engineering, procurement and construction of (48” dia) 265 km	Completed&lt;br /&gt;
	Export Line,	Development	gas pipeline from KP 24.5 to BVS 09A including Cathodic	Nov 2005&lt;br /&gt;
	Oman	Oman LLC	Protection, 10 block valve stations, telecommunication, pre-	&lt;br /&gt;
			commissioning and commissioning assistance.	&lt;br /&gt;
38	Mora Sachin	Gujarat Gas	Construction of natural gas pipeline of (16” dia) 25 km and (12” dia)	Completed&lt;br /&gt;
	Palsana Pipeline	Co Ltd	11 km including installation of valve stations, pig launchers, pig	Oct 2005&lt;br /&gt;
			receivers, header fabrication, uploading, installation and hook-up of	&lt;br /&gt;
			metering skid, pre-commissioning and commissioning assistance	&lt;br /&gt;
			and Tapi river crossing by Horizontal Directional Drilling method.	&lt;br /&gt;
# [[Baku Tbilisi Ceyhan Pipeline]]&lt;br /&gt;
#* Turkey&lt;br /&gt;
#* Botas/BTC Co/British Petroleum/ILF Consulting Engineers	&lt;br /&gt;
#* Engineering, procurement and construction of crude oil pipeline (42” dia) 207 km and (34” dia) 124 km from pumping station No. 4 near Sivas to tank terminal at Ceyhan on the Mediterranean Sea, including Cathodic Protection, 13 block valve station and commissioning assistance.&lt;br /&gt;
#* Jul 2005&lt;br /&gt;
		&lt;br /&gt;
			&lt;br /&gt;
				&lt;br /&gt;
40	Baku-Tbilisi-	Spie Capag	Construction of (46” dia) 53.4 km of crude oil pipeline and	Completed&lt;br /&gt;
	Ceyhan and	– Petrofac	(42” dia) 53.4 km of gas pipeline from KP 178 to KP 250 including	Feb 2005&lt;br /&gt;
	South Caucasus	International Ltd	Cathodic Protection, laying of HDP duct for optic fibre cable &amp;amp; block	&lt;br /&gt;
	Pipeline		valve stations at Georgia.	&lt;br /&gt;
41	Shore Approach	Gujarat Adani	Construction of shore approach pipeline (48” dia) 1 km at Mundra	Completed&lt;br /&gt;
	Pipeline	Port Ltd/Valentine	Port, Gujarat.	Feb 2005&lt;br /&gt;
		Maritime Ltd		&lt;br /&gt;
42	Dahej-Vijaipur	Gas Authority	Engineering, procurement, fabrication, transportation, construction,	Completed&lt;br /&gt;
	Gas Pipeline	of India Ltd/	testing, drying, pre-commissioning and commissioning of (42” dia)	Feb 2004&lt;br /&gt;
		Engineers	506 km and (36” dia) 6.6 km Dahej Vijaipur pipeline project including	&lt;br /&gt;
		India Ltd	associated facilities like sectionalising stations, intermediate scraper	&lt;br /&gt;
			stations, scraper launcher / receiver station, CP-cum-repeater	&lt;br /&gt;
			stations, laying of optical fibre work of spread I, II, III &amp;amp; IVB of the	&lt;br /&gt;
			pipeline system.	&lt;br /&gt;
43	Mumbai-	Bharat Petroleum	Construction of (14” dia) 189.15 km multi-product pipeline from	Completed&lt;br /&gt;
	Manmad Pipeline Corp Ltd/	Shirpur to Manglya, including sectionalising valve stations, scraper	May 2003&lt;br /&gt;
	Extension	Engineers	receiver, intermediate pigging stations, Cathodic Protection, OFC	&lt;br /&gt;
		India Ltd	laying and Narmada river crossing 950 m by Horizontal Directional	&lt;br /&gt;
			Drilling method.&lt;br /&gt;
# KAM Pipeline - 44&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* PetroKazakhstan&lt;br /&gt;
#* Construction of (16” dia) 177 km crude oil pipeline from [[Kumkol Oil Field]] to Dhuzaly via Aryskum, including block valves, pig launchers and receivers, Cathodic Protection System and OFC.&lt;br /&gt;
#* Completed Apr 2003&lt;br /&gt;
				&lt;br /&gt;
45	Vizag-	Gas Authority	Installation of (10” dia) 176.23 km of LPG pipeline from SV-25 to	Completed&lt;br /&gt;
	Secunderabad	of India Ltd/	Secunderabad, including installation of Cathodic Protection System,	Mar 2003&lt;br /&gt;
	Pipeline	Engineers	OFC laying in HDPE duct and 12 Nos. sectionalising valve stations,	&lt;br /&gt;
		India Ltd	intermediate pigging station at Suryapet and receipt terminal	&lt;br /&gt;
			at Secunderabad.	&lt;br /&gt;
46	KG Basin	Gas Authority	Design, engineering and laying of combination of (18” dia) pipe	Completed&lt;br /&gt;
	Phase-II Pipeline	of India Ltd/	and 6.625” CS conduit with 2 x 50 mm HDPE interducts across	Oct 2002&lt;br /&gt;
		Engineers	two rivers, Vainetyam Godavari (1,704 m) and Gowthami Godavari	&lt;br /&gt;
		India Ltd	(1,769 m), at Andhra Pradesh.	&lt;br /&gt;
&lt;br /&gt;
47 Mangalore-	Petronet MHB	&lt;br /&gt;
Bangalore	Ltd/Engineers	&lt;br /&gt;
Pipeline	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Installation of (24”/20” dia) 363.5 km pipeline, including installation   Completed&lt;br /&gt;
&lt;br /&gt;
of Cathodic Protection System, OFC laying and 15 Nos. stations	Jul 2002&lt;br /&gt;
&lt;br /&gt;
comprising sectionalising valve stations, intermediate pigging station,&lt;br /&gt;
&lt;br /&gt;
despatch/receiving terminals and intermediate pumping stations for&lt;br /&gt;
&lt;br /&gt;
multi-product pipeline.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
48	Amboli-Jhagadia	Gujarat Gas	Design engineering and laying of bundle of pipes (24” dia) 1,248 m	Completed&lt;br /&gt;
	Gas Pipeline	Co Ltd	pipe with 2 Nos. 3” CS with 2” HDPE interduct conduit with OFC	Apr 2002&lt;br /&gt;
			across Narmada river by Horizontal Directional Drilling method.	&lt;br /&gt;
49	Barauni-Patna	Indian Oil	Laying of (20” dia) 1,900 m pipeline with 3” CS conduit interducted	Completed&lt;br /&gt;
	Replacement	Corp Ltd	with 2” HDPE conduit across the Ganges river by Horizontal	Mar 2002&lt;br /&gt;
	Pipeline		Directional Drilling method.	&lt;br /&gt;
50	Mathura-Tundla	Indian Oil	Installation of (16” dia) API 5L Grade X 65 1,008 m pipeline across	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	Yamuna river by Horizontal Directional Drilling method.	Jun 2000&lt;br /&gt;
51	Jamnagar-Loni	Gas Authority	Laying and installation of (16”/12” dia) 435 km LPG pipelines and	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	associated systems/facilities for Sections III and IV.	May 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
52	Jamnagar-Loni	Gas Authority	Installation of (12” dia) API 5L Grade X 65 650 m pipeline and OFC	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	across Yamuna river by Horizontal Directional Drilling method.	Apr 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
53	Outfall-Jetty-MTF Reliance Ports	Construction of civil foundation, supply fabrication and erection	Completed&lt;br /&gt;
	Area Pipeline	and Terminals	of pipe racks and pipe supports, fabrication and installation of	Jul 1999&lt;br /&gt;
		Ltd	aboveground and underground pipelines (2 x 48” dia, 6 x 24” dia,	&lt;br /&gt;
			1 x 16” dia, 1 x 12” dia, 2 x 10” dia and 1 x 8” dia CS pipes with	&lt;br /&gt;
			2 x 24” dia and 1 x 4” dia GRE pipes) at Jamnagar Refinery.	&lt;br /&gt;
54	Mumbai-Manmad Bharat Petroleum	Construction of (18” dia) 253 km multi-product pipeline from Mahul	Completed&lt;br /&gt;
	Pipeline	Corp Ltd/	Refinery to Marketing Terminal at Manmad, including 47 km of city	May 1999&lt;br /&gt;
		Engineers	area, Horizontal Directional Drilling of Ulhas river, 125 km through	&lt;br /&gt;
		India Ltd	rocky terrain. Laying, splicing, jointing of OFC.	&lt;br /&gt;
55	Hazira-	Gujarat Gas	Laying of (18” dia) 75 km gas pipeline.	Completed&lt;br /&gt;
	Ankleshwar	Co Ltd		May 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
56	Effluent Outfall	Indian	Engineering, procurement and construction of 20” dia effluent	Completed&lt;br /&gt;
	System	Petrochemicals	discharge systems into Gulf of Khambhat for IPCL Gandhar gas	May 1999&lt;br /&gt;
		Corp Ltd/	processing complex at Dahej, comprising 4.5 km long onshore	&lt;br /&gt;
		Engineers	section and 3.1 km long offshore section, complete with diffuser.	&lt;br /&gt;
		India Ltd		&lt;br /&gt;
57	Beanibazar-	Gas Transmission	Construction of twin-line (20” dia) 18 km natural gas pipeline,	Completed&lt;br /&gt;
	Kailashtilla	Co Ltd	including interconnecting pipelines at gas fields in Bangladesh.	Apr 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
58	Propylene	Reliance	Fabrication and erection of 12” dia aboveground and underground	Completed&lt;br /&gt;
	Pipeline in MTF	Industries Ltd	piping and allied underground work such as Cathodic Protection of	Mar 1999&lt;br /&gt;
	Area		piping at Jamnagar Refinery.	&lt;br /&gt;
59	Thal-Usar-Thal	Gas Authority	Laying of twin-gas pipeline of (26”/20” dia) 20 km from RCF complex	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	at Thal to LPG recovery terminal at Usar.	May 1998&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
&lt;br /&gt;
# Haldia-Barauni Crude Oil Pipeline   &lt;br /&gt;
#* Indian Oil Corp Ltd&lt;br /&gt;
#* Installation of (18” dia) API 5L Grade X 65 724 m pipeline and OFC across Rupnarayan river and Harohar river by Horizontal Directional Drilling method.&lt;br /&gt;
#* Completed Apr 1998&lt;br /&gt;
&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
61	Multi-product	Kumpunan Juri	Construction of (16” dia) 128 km multi-product pipeline from Melaka	Completed&lt;br /&gt;
	Pipeline	Teknik Sdn. Bhd.,	Refinery along the west coast of Malaysian Peninsula to Kuala	Jul 1997&lt;br /&gt;
		NKK Corp and	Lumpur International Airport and a new distribution terminal at Klang	&lt;br /&gt;
		Nichimen Corp	Valley for Petronas and Shell Malaysia.	&lt;br /&gt;
		(Joint Venture)		&lt;br /&gt;
62	Gas	Gas Authority	Detailed engineering, procurement, construction and pre-	Completed&lt;br /&gt;
	Rehabilitation	of India Ltd/	commissioning of pipeline system of 349 km section of Bijaipur-	Mar 1997&lt;br /&gt;
	and Expansion	Engineers	Dadri gas pipeline; Bijaipur-Burda (36” dia) 170 km; Bhojera-Dadri	&lt;br /&gt;
		India Ltd	(36” dia) 165 km and (14” dia) 14 km spurline to Faridabad, including	&lt;br /&gt;
			sectionalising stations, scraper stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, Cathodic Protection,	&lt;br /&gt;
			instrumentation and laying of OFC work.	&lt;br /&gt;
63	Raw Water	Reliance	Construction and laying of (48” dia) 20 km raw water pipeline,	Completed&lt;br /&gt;
	System	Industries and	approach bridge and intake well on Tapi river at Hazira.	Feb 1996&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
64	Kandla-Bhatinda	Skoda Export/	Laying of 557 km product pipeline: Sanganer-Karnal (22” dia)	Completed&lt;br /&gt;
	Pipeline	Indian Oil Corp	339 km and Karnal-Bhatinda (14” dia) 218 km, 10 Horizontal	Feb 1996&lt;br /&gt;
			Directional Drilling crossing of canals. Laying, splicing,	&lt;br /&gt;
			jointing of OFC.	&lt;br /&gt;
65	Perennial River	Gas Authority	Installation of (12” dia) API 5L Grade X 42 874 m pipeline across	Completed&lt;br /&gt;
	Crossing	of India Ltd/	Sabarmati river by Horizontal Directional Drilling method.	Feb 1996&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
66	NGL Pipeline	Reliance	Fabrication, laying and testing of (18” dia) 7 km NGL/HSD pipelines	Completed&lt;br /&gt;
		Industries Ltd	from RIL to ONGC and interconnection with Essar lines for SBM	Dec 1995&lt;br /&gt;
			Project at RIL Hazira.	&lt;br /&gt;
&lt;br /&gt;
# [[Bassein Oil And Gas Field]]&lt;br /&gt;
#* Oil and Natural Gas Corp Ltd&lt;br /&gt;
#* Hyundai Heavy Industries Ltd&lt;br /&gt;
#* South Bassein - Hazira Trunkline&lt;br /&gt;
 #* Laying of (42” dia) 21 km onshore portion of pipeline, including shore approach and tidal flats&lt;br /&gt;
#* May 1995&lt;br /&gt;
				&lt;br /&gt;
				&lt;br /&gt;
68	Gandhar-Zanor	Gas Authority of	Laying of (18” dia) 40 km gas pipeline to NTPC plant in Gujarat.	Completed&lt;br /&gt;
	Pipeline	India Ltd		Mar 1995&lt;br /&gt;
69	JNPT Pipeline	Reliance	Laying of twin (8” dia) 23 km and (16” dia) 6 km product pipeline	Completed&lt;br /&gt;
		Industries and	from Kalamboli to Nhava Sheva.	Dec 1994&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
70	RSEB Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Gamnewalan to	Completed&lt;br /&gt;
	Pipeline	India Ltd	Ramgarh in Rajasthan.	Apr 1994&lt;br /&gt;
71	Balongan-Jakarta PT Trihasra	Laying of (16” dia) 210 km multi-product pipeline through marshes,	Completed&lt;br /&gt;
	Product Pipeline	Bimanusa	city area and multiple crossings in Indonesia.	Dec 1993&lt;br /&gt;
		Tunggal/		&lt;br /&gt;
		Pertamina		&lt;br /&gt;
72	Jarn Yaphour	Abu Dhabi	Construction of wellheads, flow lines, manifold, transfer line and	Completed&lt;br /&gt;
	Field	National Oil	related work in association with Sigma Specialised Engineering	Oct 1993&lt;br /&gt;
	Development	Co Ltd/	and Construction Ltd, Abu Dhabi, UAE.	&lt;br /&gt;
	(Upstream)	Snamprogetti		&lt;br /&gt;
&lt;br /&gt;
73 Raw Water Intake Chambal&lt;br /&gt;
&lt;br /&gt;
System	Fertilisers and&lt;br /&gt;
&lt;br /&gt;
Chemicals Ltd&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Design, procurement, erection and commissioning of raw water	Completed&lt;br /&gt;
&lt;br /&gt;
system comprising approach bridge, intake well, tunnel, pumping	Jun 1993&lt;br /&gt;
&lt;br /&gt;
station and (24” dia) 7 km pipeline for Gadepan plant.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
74	Grasim Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Thal to Grasim plant	Completed&lt;br /&gt;
	Pipeline	India Ltd/PDIL	in Raigad District, Maharashtra, including laying of pipeline across	Nov 1992&lt;br /&gt;
			Kundalika river (span 1,200 m).	&lt;br /&gt;
75	City Gas	Gujarat Gas	Laying of 11 km of pipeline for Surat Gas Distribution Grid, including	Completed&lt;br /&gt;
	Distribution	Co Ltd	associated facilities.	May 1991&lt;br /&gt;
	System			&lt;br /&gt;
76	Gandhar-Bharuch Oil and Natural	Laying of (18” dia) 42 km gas pipeline to GNFC fertiliser plant	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	at Bharuch.	Mar 1991&lt;br /&gt;
77	Dahej-Gandhar	Oil and Natural	Laying of (8” dia) 40 km gas pipeline in Gujarat.	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd		May 1989&lt;br /&gt;
78	Kalol-Navagam	Oil and Natural	Laying of (14” dia) 80 km oil pipeline from North Kadi CTF to	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	Navagam in Gujarat.	Mar 1989&lt;br /&gt;
79	Haldia-	Indian Oil	Laying section of (12” dia) 18.5 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	18.5 km existing corroded pipeline in West Bengal.	May 1987&lt;br /&gt;
	Pipeline Phase II			&lt;br /&gt;
80	Haldia-Barauni	Indian Oil	Laying section of (12” dia) 25 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	25 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
81	Haldia-	Indian Oil	Laying section of (12” dia) 30 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	30 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
	Pipeline, Phase I			&lt;br /&gt;
82	Mumbai-Pune	Hindustan	Laying of (14” dia) 160 km pipeline for transportation of petroleum	Completed&lt;br /&gt;
	Product Pipeline	Petroleum Corp	products through the western mountain range, highly congested	Dec 1985&lt;br /&gt;
		Ltd/Indian Oil	city areas and the crossing of marshy areas, rivers and highways.	&lt;br /&gt;
		Corp Ltd		&lt;br /&gt;
83	Ankleshwar-	Oil and	Reconditioning of (16” dia) and (14” dia) 30 km crude oil pipeline	Completed&lt;br /&gt;
	Baroda Pipeline	Natural Gas	in Gujarat.	Feb 1985&lt;br /&gt;
		Commission Ltd&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76619</id>
		<title>Punj Lloyd Pipeline References</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Punj_Lloyd_Pipeline_References&amp;diff=76619"/>
		<updated>2026-01-28T12:04:13Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# [[Shah Gas Field]]&lt;br /&gt;
#*  Gas Gathering Package 1– Abu Dhabi Development Co Ltd&lt;br /&gt;
#* Engineering, procurement, installation, commissioning assistance of eight well pad systems, (16” dia) 18 km four inter-pad lines (24” dia) 31 km four transfer lines and flow lines from the individual wells to their associated well pad. &lt;br /&gt;
#* Facilities include leak detection, Cathodic Protection, wellhead control, flow gathering and measurement,	pressure protection, flare and drain, fire and gas detection, telecommunication and security systems etc., near the Shah processing facility in western region of Abu Dhabi&lt;br /&gt;
#* Ongoing Aug 2014&lt;br /&gt;
2	Sabah Sarawak	Petronas Carigali	Engineering, procurement, construction and commissioning of (36&amp;quot;	Ongoing&lt;br /&gt;
	Gas Pipeline,	Sdn Bhd	dia) 521 km gas pipeline from Kimanis, Sabah to Bintulu, Sarawak,	Jul 2012&lt;br /&gt;
	Malaysia		with Cathodic Protection, compressor stations, metering stations,	&lt;br /&gt;
			intermediate scraper stations and launcher station, receiver station,	&lt;br /&gt;
			22 block valve stations, six future tap off points along the pipeline,	&lt;br /&gt;
			SCADA, telecommunication, leak detection, fire &amp;amp; gas system and a	&lt;br /&gt;
			gas management system.	&lt;br /&gt;
3	Strategic Gas	Qatar Petroleum	Engineering, procurement and construction of (36” dia) 124 km and	Ongoing&lt;br /&gt;
	Transmission,		87 km twin pipeline, OFC laying, station work, construction of six	Jun 2011&lt;br /&gt;
	Qatar		block valve stations, modification and expansion of existing stations	&lt;br /&gt;
			and construction of new station, relocation of 11 KV overhead	&lt;br /&gt;
			power line in the pipeline route.	&lt;br /&gt;
&lt;br /&gt;
4	El Khoms-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline Gas		&lt;br /&gt;
	Compressor		&lt;br /&gt;
	Stations, Libya		&lt;br /&gt;
5	Melita-Tripoli	Sirte Oil Co	&lt;br /&gt;
	Pipeline, Libya		&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Balance work of (34’’ dia) 157 km gas pipeline, civil and mechanical  Ongoing&lt;br /&gt;
&lt;br /&gt;
work on gas metering stations, compressor stations at Sidra and	Jun 2011&lt;br /&gt;
&lt;br /&gt;
Wachkah including SCADA and telecommunication.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (34” dia) 98 km	Ongoing&lt;br /&gt;
&lt;br /&gt;
pipeline from Melita to Tripoli with (24” dia) 21 km branchline	Jun 2011&lt;br /&gt;
&lt;br /&gt;
including gas reducing, metering, compression stations and&lt;br /&gt;
&lt;br /&gt;
telecommunication work.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
6	Dahej-Vijaipur	Gas Authority of	Construction of (48&amp;quot; dia) 145.43 km natural gas pipeline from Dahej	Ongoing,&lt;br /&gt;
	Pipeline	India Ltd	to Jambudi, Spread-1, OFC laying, mechanical, electrical and	Feb 2011&lt;br /&gt;
	Upgradation		instrumentation work at Dahej despatch station, six sectionalising	&lt;br /&gt;
			valve stations, one intermediate pigging station, including civil,	&lt;br /&gt;
			structural and architectural work.	&lt;br /&gt;
7	Oil &amp;amp; Gas Export	Agip KCO	Detailed engineering, procurement and construction of (24” dia)	Onging&lt;br /&gt;
	Pipelines,		49.5 km oil pipeline with two crossings by horizontal directional	Dec 2010&lt;br /&gt;
	Kashagan,		drilling method and 90 km gas pipeline in Atyrau region of western	&lt;br /&gt;
	Kazakhstan		Kazakhstan.	&lt;br /&gt;
8	Darod-Jafrabad	Gujarat State	Engineering, procurement and construction of (24&amp;quot; dia) 103 km	Ongoing&lt;br /&gt;
	Pipeline	Petronet Ltd	crude oil pipeline, Section B from Tana to Jafrabad.	Sep 2010&lt;br /&gt;
9	Multi Product	Qatar Petroleum	Engineering, procurement, construction and installation of (18&amp;quot; dia)	Ongoing&lt;br /&gt;
	Pipeline, Qatar		46 km multiproduct pipeline, OFC laying from Messaieed refinery to	Aug 2010&lt;br /&gt;
			Doha depot and station work at Mesaieed refinery and Doha depot	&lt;br /&gt;
			including demolition.	&lt;br /&gt;
10	Doha Urban	Qatar Petroleum	Engineering, procurement, construction and commissioning of	Ongoing&lt;br /&gt;
	Pipeline		(36”, 12’’ and 8’’ dia) 97.2 km gas pipelines, three new stations,	Aug 2010&lt;br /&gt;
	Relocation,		six modification stations, decommissioning of existing pipelines and	&lt;br /&gt;
	Qatar		demolition of nine existing stations.	&lt;br /&gt;
11	Reliance	Cairn Energy	Engineering, procurement, construction, installation, testing and	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	commissioning of heated and insulated (24” dia) 7.2 km crude oil	Jun 2010&lt;br /&gt;
			insulated pipeline, corrosion coated, PUF insulation completed	&lt;br /&gt;
			with Skin Effect Tubing and HDPE outer sleeve and cables of heat	&lt;br /&gt;
			tracing.	&lt;br /&gt;
12	Essar Spurline	Cairn Energy	Procurement, construction and Installation of (24&amp;quot; dia) 3.3 km	Completed&lt;br /&gt;
		India Pty Ltd	crude oil insulated spurline and receiving facility within Essar Oil	May 2010&lt;br /&gt;
			Refinery for Mangla Development Pipeline, OFC laying, 3.3 km	&lt;br /&gt;
			Skin Effect Heat Management System, mechanical, electrical and	&lt;br /&gt;
			instrumentation work at AGI Salaya &amp;amp; Essar Receiving Facility	&lt;br /&gt;
			including civil, structural and architectural work.	&lt;br /&gt;
13	Mangla	Cairn Energy	Engineering, procurement and construction of (24&amp;quot; dia) 57 km crude	Completed&lt;br /&gt;
	Development	India Pty Ltd	oil insulated pipeline and (8&amp;quot; dia) 57 km gas pipeline upto Salaya	Apr 2010&lt;br /&gt;
	Pipeline I &amp;amp; II		AGI Station, 56.52 km Skin Effect Heat Management System,	&lt;br /&gt;
			mechanical, electrical, civil, structural and architectural work.	&lt;br /&gt;
14	Radhanpur	Cairn Energy	Engineering, procurement and construction of (10&amp;quot; dia) 22 km	Completed&lt;br /&gt;
	Spurline	India Pty Ltd	crude oil insulated pipeline upto IOCL Radhanpur Terminal, OFC	Mar 2010&lt;br /&gt;
			laying, skin Effect Heat Management System, mechanical, electrical,	&lt;br /&gt;
			instrumentation, civil, structural and architectural work.	&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Stabilisation and Sweetening	Train, Aksai		&lt;br /&gt;
#* Installation of 26,000 inch dia piping and equipment erection at Karachaganak Oil &amp;amp; Gas Condensate Field in Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# Ras Laffan Olefins Co&lt;br /&gt;
#* UAE&lt;br /&gt;
#* Ethylene and Butene Pipelines, 		&lt;br /&gt;
#* Construction of (14’’ dia) 129.6 km, (10’’ dia) 5.1 km dense phase ethylene pipelines and (3’’ dia) 5.1 km butane pipeline from Ras Laffan to Mesaieed including scraper launcher, receiver, four block valve stations, satellite and station S, Cathodic Protection, OFC, pre-commissioning and commissioning assistance.&lt;br /&gt;
#* Completed: Dec 2009&lt;br /&gt;
# [[Karachaganak Oil and Gas Field]]&lt;br /&gt;
#* Karachaganak Petroleum Operating B.V. (KPO)&lt;br /&gt;
#* Karachaganak-Uralsk Gas Pipeline&lt;br /&gt;
#* Laying of pipeline by HDD across five rivers Gnyloy Lake, Ural,	Barabastau, Karoba and Utva with a total length 3320 m. Executed longest HDD crossing of Ural River, 1015 m in Kazakhstan.&lt;br /&gt;
#* Completed Oct 2009&lt;br /&gt;
&lt;br /&gt;
	&lt;br /&gt;
18	OGC Pipelines,	Oman Gas Co	Engineering, procurement and construction of :	Completed&lt;br /&gt;
	Oman		• (24’’ dia) 40 km Murayrat-Barka, Russayl Looplines	Sep 2009&lt;br /&gt;
			• Barka PRT Expansion	&lt;br /&gt;
			• (32” dia) 252 km Saih Rawl-Mukhaizna Loopline	&lt;br /&gt;
			• Three compressor stations at Nimr including scraper launcher,	&lt;br /&gt;
			receiver, seven block valve stations, Cathodic Protection, SCADA	&lt;br /&gt;
			telecommunication, pre-commissioning and commissioning.	&lt;br /&gt;
19	Asab Gas	Eastern Bechtel	Construction of (16” dia) 82 km pipeline from Habshan to Asab,	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase II	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
20	Onshore Gas	Eastern Bechtel	Construction of (24”, 20” dia) 105 km pipeline from Habshan to	Completed&lt;br /&gt;
	Development	Co Ltd/Abu Dhabi Ruwais, UAE including block valve stations.	Aug 2009&lt;br /&gt;
	Phase III	Gas Industries Ltd		&lt;br /&gt;
		(GASCO)		&lt;br /&gt;
21	Dabhol Panvel	Gas Authority of	Engineering, procurement and commissioning of (30&amp;quot; dia) 50.3 km	Completed&lt;br /&gt;
	Pipeline Phase II	India Ltd	natural gas pipeline from Ambewadi despatch terminal to Usar	Jun 2009&lt;br /&gt;
			receiver terminal including spurlines to NITCO, and two	&lt;br /&gt;
			sectionalising valve stations, one crossing by HDD across	&lt;br /&gt;
			Amba river.	&lt;br /&gt;
22	East-West	Reliance Gas	Construction of (48&amp;quot; dia) 2.3 km natural gas pipeline in the western	Completed&lt;br /&gt;
	Gas Pipeline	Transportation	mountain range with steep slope upto 70O by cable crane system	Feb 2009&lt;br /&gt;
	(Bhivpuri Ghat)	Infrastructure Ltd	with specialised crew.	&lt;br /&gt;
23	East-West Gas	Reliance Gas	Construction and laying of (48&amp;quot; dia) 117.5 km natural gas pipeline	Completed&lt;br /&gt;
	Pipeline	Transportation	with automatic / semi-automatic welding technology, including three	Jan 2009&lt;br /&gt;
	Spread 6A &amp;amp; 6B	Infrastructure Ltd	sectionalising valve stations and two compressor stations.	&lt;br /&gt;
24	Eastern Gas	Dolphin Energy	Engineering, procurement and construction of 260 km OFC with	Completed&lt;br /&gt;
	Distribution	Ltd (DEL)	earthwork along the Jebel Ali – Taweela – Maqta - Al Ain pipeline,	Nov 2008&lt;br /&gt;
	System Upgrade,		mechanical and coating repairs on pipelines and restoration of	&lt;br /&gt;
	UAE		damaged berms.	&lt;br /&gt;
&lt;br /&gt;
# [[Bu Hasa Oil Field]]&lt;br /&gt;
#* Adco&lt;br /&gt;
#* Flowlines &amp;amp; WellHeads	&lt;br /&gt;
#* Wellhead, flow line, water injection line installations, tie-in to existing injection header, tie-ins at header/manifold, physical tagging. including pre-commissioning and commissioning support.&lt;br /&gt;
#* Oct 2008&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
26	South Sumatra	PT Perusahaan	&lt;br /&gt;
	to West Java Gas	Gas Negara/JFE	&lt;br /&gt;
	Pipeline Phase I,	Engineering	&lt;br /&gt;
	Sumatra		&lt;br /&gt;
27	Dabhol Panvel	Gas Authority of	&lt;br /&gt;
	Pipeline Phase I	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Engineering, procurement and construction of (32” dia) 270 km	Completed&lt;br /&gt;
&lt;br /&gt;
onshore pipeline installation from Pagardewa to Labuhan Maringgai,  Sept 2008&lt;br /&gt;
&lt;br /&gt;
including sectionalising valve stations, civil, mechanical, piping,&lt;br /&gt;
&lt;br /&gt;
instrumentation, insulation work at Pagardewa, Terbanggi Besar and&lt;br /&gt;
&lt;br /&gt;
Labuhan Maringgai, Indonesia.&lt;br /&gt;
&lt;br /&gt;
Residual engineering, procurement (excluding supply of line pipe)	Completed&lt;br /&gt;
&lt;br /&gt;
installation, testing, commissioning of pipeline and associated	Feb 2008&lt;br /&gt;
&lt;br /&gt;
facilities for (30” dia) 113 km pipeline including EGP, permanent pig&lt;br /&gt;
&lt;br /&gt;
launcher, receiver, signalers, actuators for actuated valves, CCVT/&lt;br /&gt;
&lt;br /&gt;
TEG, permanent Cathodic Protection System, interference surveys&lt;br /&gt;
&lt;br /&gt;
and implementation of mitigation measures for CP System.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
28	Dahej-Uran	Gas Authority&lt;br /&gt;
	Pipeline	of India&lt;br /&gt;
29	Mundra Delhi	Hindustan&lt;br /&gt;
	Pipeline	Petroleum&lt;br /&gt;
		Corp Ltd&lt;br /&gt;
30	South Sumatra	PT Perusahaan&lt;br /&gt;
	to West Java Gas	Gas Negara&lt;br /&gt;
	Pipeline, Phase II	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Laying of	(30” dia) 144 km pipeline and associated facilities	Completed&lt;br /&gt;
including eight crossings by horizontal directional drilling method.	May 2007&lt;br /&gt;
Laying of	(18” dia) 434 km, (16” dia) 73 km and (8” dia) 35.7 km	Completed&lt;br /&gt;
pipeline and associated facilities including construction, testing,	May 2007&lt;br /&gt;
pre-commissioning and commissioning assistance.	&lt;br /&gt;
&lt;br /&gt;
Design, construction, testing and mechanical completion of (32” dia) Completed 270 km pipeline from Pagardewa to Labuhan Maringgai and (28” dia) Mar 2007 4 km pipeline from Pagardewa receiving point to Pagardewa Station&lt;br /&gt;
&lt;br /&gt;
including 9 crossings by HDD, 24 core OFC laying, 4 sectional valve stations and Cathodic Protection at Sumatra, Indonesia.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
31	Mumbai-	Bharat Petroleum	Supply, construction of (16” dia) 332 km pipeline and piping systems, Completed&lt;br /&gt;
	Manmad-	Corp Ltd	Cathodic Protection, road/rail/water crossings, pre – commissioning	Mar 2007&lt;br /&gt;
	Manglya Pipeline		including terminal piping work, commissioning assistance and	&lt;br /&gt;
			hook-up work at terminals, associated mechanical, civil, structural,	&lt;br /&gt;
			architectural, electrical, telecom and instrumentation work from	&lt;br /&gt;
			Manglya Despatch Terminal to sectionalising valve station at Manglya	&lt;br /&gt;
			to Piyala/Bijwasan.	&lt;br /&gt;
32	Pune-Solapur	Hindustan	Procurement, construction, pre-commissioning and commissioning	Completed&lt;br /&gt;
	Pipeline	Petroleum	assistance for (14” dia) 182 km and (12” dia) 161 km pipeline,	Mar 2007&lt;br /&gt;
		Corp Ltd	including 9 sectionalising valve stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, rotating equipment, Cathodic	&lt;br /&gt;
			Protection, instrumentation and OFC laying work.	&lt;br /&gt;
33	Huwailah Field	Abu Dhabi Co	Construction of flowlines &amp;amp; transfer line (10’’ dia) 30 km in Huwaila,	Completed&lt;br /&gt;
	Development	for Onshore	UAE.	Dec 2006&lt;br /&gt;
		Oil Operations		&lt;br /&gt;
		(ADCO)/Matrix		&lt;br /&gt;
		Construction		&lt;br /&gt;
# [[Tengiz Oil Field]]&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* Large and Small-Bore Pipelines for TCO Asset Development&lt;br /&gt;
#* Tengizchevroil (TCO)/PFD International LLC (Parsons/Fluor Daniel JV)&lt;br /&gt;
#* Construction of pipelines and flow lines 408 km LTCS piping fabrication (181,000 inch dia), erection (115,000 inch metre) and high pressure thick walled injection piping work upto 63 mm,	HPPE pipe fusion welding and laying, equipment installation, civil, structural, painting, insulation work at Tengiz, Kazakhstan.&lt;br /&gt;
#* Completed: Dec 2006	&lt;br /&gt;
# [[Tambora Gas Field]]&lt;br /&gt;
#* Indonesia&lt;br /&gt;
#* Tambora Phase II, &lt;br /&gt;
#* Total E&amp;amp;P&lt;br /&gt;
#* Engineering, procurement, supply and construction of gas pipeline&lt;br /&gt;
#* Completed&lt;br /&gt;
#* EPSC 2 for	Indonesie	network in swamp risers and dogleg installation to Gathering Testing&lt;br /&gt;
#* Jun 2006&lt;br /&gt;
	Pipeline Network,		Satellite Stations (GTS) and wellhead platforms:	&lt;br /&gt;
	Indonesia		•  24” dia line	&lt;br /&gt;
			•  8” dia flow lines and 2” piggy back as gas instrument line	&lt;br /&gt;
			•  5 km crossing of existing facilities and river by Horizontal	&lt;br /&gt;
			Directional Drilling method	&lt;br /&gt;
			•  2 river crossings by open cut method	&lt;br /&gt;
&lt;br /&gt;
36 Direct Gas	BG Exploration	&lt;br /&gt;
Marketing	and Production	&lt;br /&gt;
	India Ltd/	&lt;br /&gt;
	Kvaerner Power	&lt;br /&gt;
	Gas	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Civil, mechanical and structural work for construction at ONGC	Completed&lt;br /&gt;
&lt;br /&gt;
Plant, Hazira.	Jan 2006&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
37	Oman Gas	Petroleum	Engineering, procurement and construction of (48” dia) 265 km	Completed&lt;br /&gt;
	Export Line,	Development	gas pipeline from KP 24.5 to BVS 09A including Cathodic	Nov 2005&lt;br /&gt;
	Oman	Oman LLC	Protection, 10 block valve stations, telecommunication, pre-	&lt;br /&gt;
			commissioning and commissioning assistance.	&lt;br /&gt;
38	Mora Sachin	Gujarat Gas	Construction of natural gas pipeline of (16” dia) 25 km and (12” dia)	Completed&lt;br /&gt;
	Palsana Pipeline	Co Ltd	11 km including installation of valve stations, pig launchers, pig	Oct 2005&lt;br /&gt;
			receivers, header fabrication, uploading, installation and hook-up of	&lt;br /&gt;
			metering skid, pre-commissioning and commissioning assistance	&lt;br /&gt;
			and Tapi river crossing by Horizontal Directional Drilling method.	&lt;br /&gt;
# [[Baku Tbilisi Ceyhan Pipeline]]&lt;br /&gt;
#* Turkey&lt;br /&gt;
#* Botas/BTC Co/British Petroleum/ILF Consulting Engineers	&lt;br /&gt;
#* Engineering, procurement and construction of crude oil pipeline (42” dia) 207 km and (34” dia) 124 km from pumping station No. 4 near Sivas to tank terminal at Ceyhan on the Mediterranean Sea, including Cathodic Protection, 13 block valve station and commissioning assistance.&lt;br /&gt;
#* Jul 2005&lt;br /&gt;
		&lt;br /&gt;
			&lt;br /&gt;
				&lt;br /&gt;
40	Baku-Tbilisi-	Spie Capag	Construction of (46” dia) 53.4 km of crude oil pipeline and	Completed&lt;br /&gt;
	Ceyhan and	– Petrofac	(42” dia) 53.4 km of gas pipeline from KP 178 to KP 250 including	Feb 2005&lt;br /&gt;
	South Caucasus	International Ltd	Cathodic Protection, laying of HDP duct for optic fibre cable &amp;amp; block	&lt;br /&gt;
	Pipeline		valve stations at Georgia.	&lt;br /&gt;
41	Shore Approach	Gujarat Adani	Construction of shore approach pipeline (48” dia) 1 km at Mundra	Completed&lt;br /&gt;
	Pipeline	Port Ltd/Valentine	Port, Gujarat.	Feb 2005&lt;br /&gt;
		Maritime Ltd		&lt;br /&gt;
42	Dahej-Vijaipur	Gas Authority	Engineering, procurement, fabrication, transportation, construction,	Completed&lt;br /&gt;
	Gas Pipeline	of India Ltd/	testing, drying, pre-commissioning and commissioning of (42” dia)	Feb 2004&lt;br /&gt;
		Engineers	506 km and (36” dia) 6.6 km Dahej Vijaipur pipeline project including	&lt;br /&gt;
		India Ltd	associated facilities like sectionalising stations, intermediate scraper	&lt;br /&gt;
			stations, scraper launcher / receiver station, CP-cum-repeater	&lt;br /&gt;
			stations, laying of optical fibre work of spread I, II, III &amp;amp; IVB of the	&lt;br /&gt;
			pipeline system.	&lt;br /&gt;
43	Mumbai-	Bharat Petroleum	Construction of (14” dia) 189.15 km multi-product pipeline from	Completed&lt;br /&gt;
	Manmad Pipeline Corp Ltd/	Shirpur to Manglya, including sectionalising valve stations, scraper	May 2003&lt;br /&gt;
	Extension	Engineers	receiver, intermediate pigging stations, Cathodic Protection, OFC	&lt;br /&gt;
		India Ltd	laying and Narmada river crossing 950 m by Horizontal Directional	&lt;br /&gt;
			Drilling method.&lt;br /&gt;
# KAM Pipeline - 44&lt;br /&gt;
#* Kazakhstan&lt;br /&gt;
#* PetroKazakhstan&lt;br /&gt;
#* Construction of (16” dia) 177 km crude oil pipeline from [[Kumkol Oil Field]] to Dhuzaly via Aryskum, including block valves, pig launchers and receivers, Cathodic Protection System and OFC.&lt;br /&gt;
#* Completed Apr 2003&lt;br /&gt;
				&lt;br /&gt;
45	Vizag-	Gas Authority	Installation of (10” dia) 176.23 km of LPG pipeline from SV-25 to	Completed&lt;br /&gt;
	Secunderabad	of India Ltd/	Secunderabad, including installation of Cathodic Protection System,	Mar 2003&lt;br /&gt;
	Pipeline	Engineers	OFC laying in HDPE duct and 12 Nos. sectionalising valve stations,	&lt;br /&gt;
		India Ltd	intermediate pigging station at Suryapet and receipt terminal	&lt;br /&gt;
			at Secunderabad.	&lt;br /&gt;
46	KG Basin	Gas Authority	Design, engineering and laying of combination of (18” dia) pipe	Completed&lt;br /&gt;
	Phase-II Pipeline	of India Ltd/	and 6.625” CS conduit with 2 x 50 mm HDPE interducts across	Oct 2002&lt;br /&gt;
		Engineers	two rivers, Vainetyam Godavari (1,704 m) and Gowthami Godavari	&lt;br /&gt;
		India Ltd	(1,769 m), at Andhra Pradesh.	&lt;br /&gt;
&lt;br /&gt;
47 Mangalore-	Petronet MHB	&lt;br /&gt;
Bangalore	Ltd/Engineers	&lt;br /&gt;
Pipeline	India Ltd	&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Installation of (24”/20” dia) 363.5 km pipeline, including installation   Completed&lt;br /&gt;
&lt;br /&gt;
of Cathodic Protection System, OFC laying and 15 Nos. stations	Jul 2002&lt;br /&gt;
&lt;br /&gt;
comprising sectionalising valve stations, intermediate pigging station,&lt;br /&gt;
&lt;br /&gt;
despatch/receiving terminals and intermediate pumping stations for&lt;br /&gt;
&lt;br /&gt;
multi-product pipeline.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
48	Amboli-Jhagadia	Gujarat Gas	Design engineering and laying of bundle of pipes (24” dia) 1,248 m	Completed&lt;br /&gt;
	Gas Pipeline	Co Ltd	pipe with 2 Nos. 3” CS with 2” HDPE interduct conduit with OFC	Apr 2002&lt;br /&gt;
			across Narmada river by Horizontal Directional Drilling method.	&lt;br /&gt;
49	Barauni-Patna	Indian Oil	Laying of (20” dia) 1,900 m pipeline with 3” CS conduit interducted	Completed&lt;br /&gt;
	Replacement	Corp Ltd	with 2” HDPE conduit across the Ganges river by Horizontal	Mar 2002&lt;br /&gt;
	Pipeline		Directional Drilling method.	&lt;br /&gt;
50	Mathura-Tundla	Indian Oil	Installation of (16” dia) API 5L Grade X 65 1,008 m pipeline across	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	Yamuna river by Horizontal Directional Drilling method.	Jun 2000&lt;br /&gt;
51	Jamnagar-Loni	Gas Authority	Laying and installation of (16”/12” dia) 435 km LPG pipelines and	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	associated systems/facilities for Sections III and IV.	May 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
52	Jamnagar-Loni	Gas Authority	Installation of (12” dia) API 5L Grade X 65 650 m pipeline and OFC	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	across Yamuna river by Horizontal Directional Drilling method.	Apr 2000&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
53	Outfall-Jetty-MTF Reliance Ports	Construction of civil foundation, supply fabrication and erection	Completed&lt;br /&gt;
	Area Pipeline	and Terminals	of pipe racks and pipe supports, fabrication and installation of	Jul 1999&lt;br /&gt;
		Ltd	aboveground and underground pipelines (2 x 48” dia, 6 x 24” dia,	&lt;br /&gt;
			1 x 16” dia, 1 x 12” dia, 2 x 10” dia and 1 x 8” dia CS pipes with	&lt;br /&gt;
			2 x 24” dia and 1 x 4” dia GRE pipes) at Jamnagar Refinery.	&lt;br /&gt;
54	Mumbai-Manmad Bharat Petroleum	Construction of (18” dia) 253 km multi-product pipeline from Mahul	Completed&lt;br /&gt;
	Pipeline	Corp Ltd/	Refinery to Marketing Terminal at Manmad, including 47 km of city	May 1999&lt;br /&gt;
		Engineers	area, Horizontal Directional Drilling of Ulhas river, 125 km through	&lt;br /&gt;
		India Ltd	rocky terrain. Laying, splicing, jointing of OFC.	&lt;br /&gt;
55	Hazira-	Gujarat Gas	Laying of (18” dia) 75 km gas pipeline.	Completed&lt;br /&gt;
	Ankleshwar	Co Ltd		May 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
56	Effluent Outfall	Indian	Engineering, procurement and construction of 20” dia effluent	Completed&lt;br /&gt;
	System	Petrochemicals	discharge systems into Gulf of Khambhat for IPCL Gandhar gas	May 1999&lt;br /&gt;
		Corp Ltd/	processing complex at Dahej, comprising 4.5 km long onshore	&lt;br /&gt;
		Engineers	section and 3.1 km long offshore section, complete with diffuser.	&lt;br /&gt;
		India Ltd		&lt;br /&gt;
57	Beanibazar-	Gas Transmission	Construction of twin-line (20” dia) 18 km natural gas pipeline,	Completed&lt;br /&gt;
	Kailashtilla	Co Ltd	including interconnecting pipelines at gas fields in Bangladesh.	Apr 1999&lt;br /&gt;
	Pipeline			&lt;br /&gt;
58	Propylene	Reliance	Fabrication and erection of 12” dia aboveground and underground	Completed&lt;br /&gt;
	Pipeline in MTF	Industries Ltd	piping and allied underground work such as Cathodic Protection of	Mar 1999&lt;br /&gt;
	Area		piping at Jamnagar Refinery.	&lt;br /&gt;
59	Thal-Usar-Thal	Gas Authority	Laying of twin-gas pipeline of (26”/20” dia) 20 km from RCF complex	Completed&lt;br /&gt;
	Pipeline	of India Ltd/	at Thal to LPG recovery terminal at Usar.	May 1998&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
&lt;br /&gt;
# Haldia-Barauni Crude Oil Pipeline   &lt;br /&gt;
#* Indian Oil Corp Ltd&lt;br /&gt;
#* Installation of (18” dia) API 5L Grade X 65 724 m pipeline and OFC across Rupnarayan river and Harohar river by Horizontal Directional Drilling method.&lt;br /&gt;
#* Completed Apr 1998&lt;br /&gt;
&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
61	Multi-product	Kumpunan Juri	Construction of (16” dia) 128 km multi-product pipeline from Melaka	Completed&lt;br /&gt;
	Pipeline	Teknik Sdn. Bhd.,	Refinery along the west coast of Malaysian Peninsula to Kuala	Jul 1997&lt;br /&gt;
		NKK Corp and	Lumpur International Airport and a new distribution terminal at Klang	&lt;br /&gt;
		Nichimen Corp	Valley for Petronas and Shell Malaysia.	&lt;br /&gt;
		(Joint Venture)		&lt;br /&gt;
62	Gas	Gas Authority	Detailed engineering, procurement, construction and pre-	Completed&lt;br /&gt;
	Rehabilitation	of India Ltd/	commissioning of pipeline system of 349 km section of Bijaipur-	Mar 1997&lt;br /&gt;
	and Expansion	Engineers	Dadri gas pipeline; Bijaipur-Burda (36” dia) 170 km; Bhojera-Dadri	&lt;br /&gt;
		India Ltd	(36” dia) 165 km and (14” dia) 14 km spurline to Faridabad, including	&lt;br /&gt;
			sectionalising stations, scraper stations, associated mechanical,	&lt;br /&gt;
			civil, structural, architectural, electrical, Cathodic Protection,	&lt;br /&gt;
			instrumentation and laying of OFC work.	&lt;br /&gt;
63	Raw Water	Reliance	Construction and laying of (48” dia) 20 km raw water pipeline,	Completed&lt;br /&gt;
	System	Industries and	approach bridge and intake well on Tapi river at Hazira.	Feb 1996&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
64	Kandla-Bhatinda	Skoda Export/	Laying of 557 km product pipeline: Sanganer-Karnal (22” dia)	Completed&lt;br /&gt;
	Pipeline	Indian Oil Corp	339 km and Karnal-Bhatinda (14” dia) 218 km, 10 Horizontal	Feb 1996&lt;br /&gt;
			Directional Drilling crossing of canals. Laying, splicing,	&lt;br /&gt;
			jointing of OFC.	&lt;br /&gt;
65	Perennial River	Gas Authority	Installation of (12” dia) API 5L Grade X 42 874 m pipeline across	Completed&lt;br /&gt;
	Crossing	of India Ltd/	Sabarmati river by Horizontal Directional Drilling method.	Feb 1996&lt;br /&gt;
		Engineers		&lt;br /&gt;
		India Ltd		&lt;br /&gt;
66	NGL Pipeline	Reliance	Fabrication, laying and testing of (18” dia) 7 km NGL/HSD pipelines	Completed&lt;br /&gt;
		Industries Ltd	from RIL to ONGC and interconnection with Essar lines for SBM	Dec 1995&lt;br /&gt;
			Project at RIL Hazira.	&lt;br /&gt;
&lt;br /&gt;
# [[Bassein Oil And Gas Field]]&lt;br /&gt;
#* Oil and Natural Gas Corp Ltd&lt;br /&gt;
#* Hyundai Heavy Industries Ltd&lt;br /&gt;
#* South Bassein - Hazira Trunkline&lt;br /&gt;
 #* Laying of (42” dia) 21 km onshore portion of pipeline, including shore approach and tidal flats&lt;br /&gt;
#* May 1995&lt;br /&gt;
				&lt;br /&gt;
				&lt;br /&gt;
68	Gandhar-Zanor	Gas Authority of	Laying of (18” dia) 40 km gas pipeline to NTPC plant in Gujarat.	Completed&lt;br /&gt;
	Pipeline	India Ltd		Mar 1995&lt;br /&gt;
69	JNPT Pipeline	Reliance	Laying of twin (8” dia) 23 km and (16” dia) 6 km product pipeline	Completed&lt;br /&gt;
		Industries and	from Kalamboli to Nhava Sheva.	Dec 1994&lt;br /&gt;
		Infrastructure Ltd		&lt;br /&gt;
70	RSEB Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Gamnewalan to	Completed&lt;br /&gt;
	Pipeline	India Ltd	Ramgarh in Rajasthan.	Apr 1994&lt;br /&gt;
71	Balongan-Jakarta PT Trihasra	Laying of (16” dia) 210 km multi-product pipeline through marshes,	Completed&lt;br /&gt;
	Product Pipeline	Bimanusa	city area and multiple crossings in Indonesia.	Dec 1993&lt;br /&gt;
		Tunggal/		&lt;br /&gt;
		Pertamina		&lt;br /&gt;
72	Jarn Yaphour	Abu Dhabi	Construction of wellheads, flow lines, manifold, transfer line and	Completed&lt;br /&gt;
	Field	National Oil	related work in association with Sigma Specialised Engineering	Oct 1993&lt;br /&gt;
	Development	Co Ltd/	and Construction Ltd, Abu Dhabi, UAE.	&lt;br /&gt;
	(Upstream)	Snamprogetti		&lt;br /&gt;
&lt;br /&gt;
73 Raw Water Intake Chambal&lt;br /&gt;
&lt;br /&gt;
System	Fertilisers and&lt;br /&gt;
&lt;br /&gt;
Chemicals Ltd&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
SCOPE	STATUS&lt;br /&gt;
&lt;br /&gt;
Design, procurement, erection and commissioning of raw water	Completed&lt;br /&gt;
&lt;br /&gt;
system comprising approach bridge, intake well, tunnel, pumping	Jun 1993&lt;br /&gt;
&lt;br /&gt;
station and (24” dia) 7 km pipeline for Gadepan plant.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
74	Grasim Gas	Gas Authority of	Laying of (12” dia) 32 km gas pipeline from Thal to Grasim plant	Completed&lt;br /&gt;
	Pipeline	India Ltd/PDIL	in Raigad District, Maharashtra, including laying of pipeline across	Nov 1992&lt;br /&gt;
			Kundalika river (span 1,200 m).	&lt;br /&gt;
75	City Gas	Gujarat Gas	Laying of 11 km of pipeline for Surat Gas Distribution Grid, including	Completed&lt;br /&gt;
	Distribution	Co Ltd	associated facilities.	May 1991&lt;br /&gt;
	System			&lt;br /&gt;
76	Gandhar-Bharuch Oil and Natural	Laying of (18” dia) 42 km gas pipeline to GNFC fertiliser plant	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	at Bharuch.	Mar 1991&lt;br /&gt;
77	Dahej-Gandhar	Oil and Natural	Laying of (8” dia) 40 km gas pipeline in Gujarat.	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd		May 1989&lt;br /&gt;
78	Kalol-Navagam	Oil and Natural	Laying of (14” dia) 80 km oil pipeline from North Kadi CTF to	Completed&lt;br /&gt;
	Pipeline	Gas Corp Ltd	Navagam in Gujarat.	Mar 1989&lt;br /&gt;
79	Haldia-	Indian Oil	Laying section of (12” dia) 18.5 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	18.5 km existing corroded pipeline in West Bengal.	May 1987&lt;br /&gt;
	Pipeline Phase II			&lt;br /&gt;
80	Haldia-Barauni	Indian Oil	Laying section of (12” dia) 25 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Pipeline	Corp Ltd	25 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
81	Haldia-	Indian Oil	Laying section of (12” dia) 30 km product pipeline and retrieval of	Completed&lt;br /&gt;
	Mourigram	Corp Ltd	30 km existing corroded pipeline in West Bengal.	Jun 1986&lt;br /&gt;
	Pipeline, Phase I			&lt;br /&gt;
82	Mumbai-Pune	Hindustan	Laying of (14” dia) 160 km pipeline for transportation of petroleum	Completed&lt;br /&gt;
	Product Pipeline	Petroleum Corp	products through the western mountain range, highly congested	Dec 1985&lt;br /&gt;
		Ltd/Indian Oil	city areas and the crossing of marshy areas, rivers and highways.	&lt;br /&gt;
		Corp Ltd		&lt;br /&gt;
83	Ankleshwar-	Oil and	Reconditioning of (16” dia) and (14” dia) 30 km crude oil pipeline	Completed&lt;br /&gt;
	Baroda Pipeline	Natural Gas	in Gujarat.	Feb 1985&lt;br /&gt;
		Commission Ltd&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kumkol_Oil_Field&amp;diff=76618</id>
		<title>Kumkol Oil Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kumkol_Oil_Field&amp;diff=76618"/>
		<updated>2026-01-28T11:59:22Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: PetroKazakhstan&lt;br /&gt;
* Country: Kazakhstan &lt;br /&gt;
* Location: &lt;br /&gt;
* Production start: 1986&lt;br /&gt;
* Partners: CNPC &amp;amp; KMG&lt;br /&gt;
* Type: Oil&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Kumkol field is located in the southern part of the Turgai Depression (southern Kazakhstan)&lt;br /&gt;
* Oil is delivered to export via the [[Caspian Pipeline Consortium Oil Pipeline]] and is also supplied to the [[Shymkent Refinery]]&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 1984 - Kumkol Oil Field discovered&lt;br /&gt;
* 1986 - Commercial development launched&lt;br /&gt;
* 1991 - Hurricane Hydrocarbons became a partner&lt;br /&gt;
* 2005 - CNPC acquired Hurricane&lt;br /&gt;
* 2007 - KMG became a 50% partner&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.lukoil.com/materials/doc/FactBook/2012/part03eng.pdf Lukoil Factbook 2012]&lt;br /&gt;
# [https://petrokazakhstan.kz/en/about-the-company-2/company-history-en/ PetroKazakhstan history]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Caspian_Pipeline_Consortium_Oil_Pipeline&amp;diff=76617</id>
		<title>Caspian Pipeline Consortium Oil Pipeline</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Caspian_Pipeline_Consortium_Oil_Pipeline&amp;diff=76617"/>
		<updated>2026-01-26T16:19:18Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Pipeline Status */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Source: Western Kazakhstan &lt;br /&gt;
* Destination: Black Sea terminal, six miles (10 km) north of the Port of Novorossiysk&lt;br /&gt;
* Ownership: Transneft, KazMunaiGaz (KMG) and Chevron&lt;br /&gt;
* Website: http://www.cpc.ru/&lt;br /&gt;
* Length: 1,500 kilometres (900 miles) &lt;br /&gt;
* Capacity: 1.4m barrels of oil per day &lt;br /&gt;
* Crude Type: [[CPC Blend Crude Oil]]&lt;br /&gt;
&lt;br /&gt;
=== The Route ===&lt;br /&gt;
&lt;br /&gt;
* From Western Kazakhstan to a dedicated terminal in the Black Sea&lt;br /&gt;
&lt;br /&gt;
=== Pipeline Status ===&lt;br /&gt;
* The pipeline is in operation.&lt;br /&gt;
* Oil from [[Karachaganak Oil and Gas Field]] is transported in the pipeline&lt;br /&gt;
* The capacity of the pipeline was increase to 1.4 million barrels per day from its former capacity of 730,000 barrels per day in 2012&lt;br /&gt;
* Following the expansion project, the pipeline increased volumes of [[Tengiz Crude Oil]]&lt;br /&gt;
* Fluor will provide project services for the marine terminal and supervisory control and data system (SCADA) portions of the Pipeline Expansion project&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
&lt;br /&gt;
* 1997 - Russian assets in the CPC system that had been mothballed were acquired by CPC &lt;br /&gt;
* 1997 - Lukoil &amp;amp; Arco agree to invest in CPC&lt;br /&gt;
* 2001 - CPC for the first time loaded crude oil onto a tanker at its Marine Terminal&lt;br /&gt;
* 2010 - CPC Expansion Project Sanctioned&lt;br /&gt;
* 2011 - Fluor awarded contract for project services for the marine terminal and supervisory control and data system (SCADA) &lt;br /&gt;
* 2012 - First CPC Expansion Facility Completed&lt;br /&gt;
* 2013 - Caspian Pipeline Consortium Loaded 3000th Tanker&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
&lt;br /&gt;
* Fluor was the original program management contractor&lt;br /&gt;
* The original project involved refurbishing more than 700 kilometers of existing pipeline and building an additional 740 kilometres&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
&lt;br /&gt;
# [http://www.transneft.ru/content/119/10203/ Expansion of the CPC, Transneft]&lt;br /&gt;
# [http://www.penspen.com/Projects/Documents/30233AW.pdf CPC Crude Oil Pipeline Integrity Review and Rehabilitation Plan]&lt;br /&gt;
# [[Penspen Pipeline References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:268 Chevron and Other Shareholders Sanction Caspian Pipeline Expansion]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1178 Fluor Awarded Caspian Pipeline Expansion Contract in Kazakhstan &amp;amp; Russia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2477 CPC Terminal April Oil Liftings Back to Record 2010 Monthly Average]&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:arco-lukoil-formalize-joint-venture-agreement-first ARCO, LUKOIL Formalize Joint Venture Agreement; First Investment is in Caspian Pipeline Consortium]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3639 First CPC Expansion Facility Completed]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3715 CPC Signs Facility Agreement]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4339 Caspian Pipeline Consortium Loaded 3000th Tanker]&lt;br /&gt;
&lt;br /&gt;
[[category:Pipeline]]&lt;br /&gt;
[[category:Kazakhstan]]&lt;br /&gt;
[[category:Russia]]&lt;br /&gt;
[[category:KMG]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76616</id>
		<title>BG Group Prince Rupert LNG Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76616"/>
		<updated>2026-01-26T12:14:19Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: BG Group (Shell)&lt;br /&gt;
* Website: &lt;br /&gt;
* Location: Prince Rupert, BC, Canada &lt;br /&gt;
* Capacity: 21 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Gas will be supplied from the [[[Montney Formation Gas Field]]]. Gas is to be transported via the [[[Westcoast Connector Gas Pipeline]]]&lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2012 - Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System &lt;br /&gt;
* 2013 - Canadian Environmental Assessment Agency asks for public feedback&lt;br /&gt;
* 2014 - Export licence awarded by the Ministry of Natural Resources&lt;br /&gt;
* 2015 - Shell acquire BG Group&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3077 Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System in British Columbia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4197 Prince Rupert LNG Project Public Comments Invited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4819 NEB Approves Four LNG Export Licence Applications]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5052 Harper Government Announces Approval of Four Long-term LNG Export Licences]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=WCC_LNG_Export_Terminal_Project&amp;diff=76615</id>
		<title>WCC LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=WCC_LNG_Export_Terminal_Project&amp;diff=76615"/>
		<updated>2026-01-26T12:14:01Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Exxon / Imperial Oil&lt;br /&gt;
* Website: &lt;br /&gt;
* Location:  Tuck Inlet, within the city limits of Prince Rupert&lt;br /&gt;
* Capacity: 15 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* An onshore LNG liquefaction facility &lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2014 - Export licence awarded by the Ministry of Natural Resources&lt;br /&gt;
* 2018 - Application was withdrawn&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://www.projects.eao.gov.bc.ca/p/588511fdaaecd9001b828fca/project-details Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4819 NEB Approves Four LNG Export Licence Applications]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5052 Harper Government Announces Approval of Four Long-term LNG Export Licences]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5700 Imperial and ExxonMobil file LNG export application]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=WCC_LNG_Export_Terminal_Project&amp;diff=76614</id>
		<title>WCC LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=WCC_LNG_Export_Terminal_Project&amp;diff=76614"/>
		<updated>2026-01-26T12:07:23Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Exxon / Imperial Oil&lt;br /&gt;
* Website: &lt;br /&gt;
* Location:  &lt;br /&gt;
* Capacity: million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2014 - Export licence awarded by the Ministry of Natural Resources&lt;br /&gt;
* 2018 - Application was withdrawn&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://www.projects.eao.gov.bc.ca/p/588511fdaaecd9001b828fca/project-details Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4819 NEB Approves Four LNG Export Licence Applications]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5052 Harper Government Announces Approval of Four Long-term LNG Export Licences]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5700 Imperial and ExxonMobil file LNG export application]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76613</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76613"/>
		<updated>2026-01-26T12:05:11Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]] - Canada&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Malahat LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Triton LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Triton_LNG_Export_Terminal&amp;diff=76612</id>
		<title>Triton LNG Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Triton_LNG_Export_Terminal&amp;diff=76612"/>
		<updated>2026-01-26T12:04:42Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: AltaGas and Idemitsu Kosan&lt;br /&gt;
* Website: &lt;br /&gt;
* Location:  Kitimat or Prince Rupert, British Columbia, Canada &lt;br /&gt;
* Capacity: 2.3 million tons/annum &lt;br /&gt;
* Status: Cacelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2013 - AltaGas and Idemitsu Kosan Form LNG Partnership&lt;br /&gt;
* 2014 - NEB Approves LNG Export License&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3757 AltaGas Ltd. and Idemitsu Kosan Co., Ltd. Form Partnership to Pursue Opportunities to Export Energy From Canada] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5110 NEB Approves LNG Export License for Triton LNG]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76611</id>
		<title>BG Group Prince Rupert LNG Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76611"/>
		<updated>2026-01-26T12:03:44Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: BG Group (Shell)&lt;br /&gt;
* Website: &lt;br /&gt;
* Location: Prince Rupert, BC, Canada &lt;br /&gt;
* Capacity: 21 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* Prince Rupert LNG Limited (Proponent) proposes to construct and operate a liquefied natural gas export facility on Ridley Island at the Port of Prince Rupert, BC. The project would be developed in two phases with a total capital cost of US $16 billion, and would include a marine terminal and liquefaction plant with three trains (production units), and a storage capacity of 540,000 m3 with a production capacity of up to 21 million tonnes per year of liquefied natural gas.&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Gas will be supplied from the [[Montney Formation Gas Field]]. Gas is to be transported via the [[Westcoast Connector Gas Pipeline]]&lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2012 - Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System &lt;br /&gt;
* 2013 - Canadian Environmental Assessment Agency asks for public feedback&lt;br /&gt;
* 2014 - Export licence awarded by the Ministry of Natural Resources&lt;br /&gt;
* 2015 - Shell acquire BG Group&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://www.projects.eao.gov.bc.ca/p/588511d7aaecd9001b826946/project-details Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3077 Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System in British Columbia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4197 Prince Rupert LNG Project Public Comments Invited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4819 NEB Approves Four LNG Export Licence Applications]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5052 Harper Government Announces Approval of Four Long-term LNG Export Licences]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Sarita_Bay_LNG_Export_Terminal_Project&amp;diff=76610</id>
		<title>Sarita Bay LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Sarita_Bay_LNG_Export_Terminal_Project&amp;diff=76610"/>
		<updated>2026-01-26T11:57:02Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Steelhead LNG&lt;br /&gt;
* Website: http://www.steelheadlng.com/&lt;br /&gt;
* Location: Vancouver Island, Canada &lt;br /&gt;
* Capacity: 24 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The proposed US$30 billion LNG Project, which includes a 24‐mtpa (million tonnes per annum) land‐based facility, is one of the largest proposed LNG projects in British Columbia&lt;br /&gt;
* The development of the Sarita Bay site will be split into four 6 mtpa LNG production trains&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
** '''WorleyParsons:''' Preliminary front end engineering and design studies, geotechnical investigations, environmental impact assessments, and permitting approvals support. &lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2014 - Application made to NEB for export licence&lt;br /&gt;
* 2015 - Worley Parsons awarded preFEED&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5743 WorleyParsons signs contract for proposed Sarita Bay LNG Project]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76609</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76609"/>
		<updated>2026-01-26T11:55:29Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]] - Canada&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Malahat LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Malahat_LNG_Export_Terminal_Project&amp;diff=76608</id>
		<title>Malahat LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Malahat_LNG_Export_Terminal_Project&amp;diff=76608"/>
		<updated>2026-01-26T11:55:04Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Steelhead LNG&lt;br /&gt;
* Website: http://www.steelheadlng.com/&lt;br /&gt;
* Location: Bamberton, approximately 8 kilometres south of Mill Bay on Vancouver Island&lt;br /&gt;
* Capacity: million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The proposed facility, expected to have a capacity of up to 6 million tonnes per annum (mtpa), would include floating liquefaction facilities moored to the shoreline and minor supporting land-based infrastructure. &lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
** **Höegh LNG and Bechtel:** Pre-front end engineering and design (pre-FEED) &lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2015 - PreFEED contracts signed&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5994 Steelhead LNG And Malahat First Nation Sign Mutual Benefits Agreement And Lease For LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:6034 Steelhead LNG Signs Pre-Feed Agreement With Höegh LNG And Bechtel For Malahat LNG]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Grassy_Point_Woodside_LNG_Export_Terminal_Project&amp;diff=76607</id>
		<title>Grassy Point Woodside LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Grassy_Point_Woodside_LNG_Export_Terminal_Project&amp;diff=76607"/>
		<updated>2026-01-26T11:51:19Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Summary Information */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Woodside&lt;br /&gt;
* Website: http://www.woodside.com.au/&lt;br /&gt;
* Location: Grassy Point, BC&lt;br /&gt;
* Capacity: 20 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation. &lt;br /&gt;
* Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2015 - NEB approves LNG export licence]&lt;br /&gt;
* 2018 - Application withdrawn &lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.woodside.com.au/Our-Business/GrassyPoint/Documents/Grassy%20Point_Report.pdf Project Description]&lt;br /&gt;
# [https://www.projects.eao.gov.bc.ca/p/588511f2aaecd9001b82843c/project-details Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5722 NEB approves Woodside Energy LNG export licence]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76606</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76606"/>
		<updated>2026-01-26T11:50:59Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]] - Canada&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76605</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76605"/>
		<updated>2026-01-26T11:50:46Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
- [[Grassy Point Woodside LNG Export Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]] - Canada&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Grassy_Point_Woodside_LNG_Export_Terminal_Project&amp;diff=76604</id>
		<title>Grassy Point Woodside LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Grassy_Point_Woodside_LNG_Export_Terminal_Project&amp;diff=76604"/>
		<updated>2026-01-26T11:50:12Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Woodside&lt;br /&gt;
* Website: http://www.woodside.com.au/&lt;br /&gt;
* Location: Grassy Point, BC&lt;br /&gt;
* Capacity: 20 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation. &lt;br /&gt;
* Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2015 - NEB approves LNG export licence]&lt;br /&gt;
* 2018 - Application withdrawn &lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://www.woodside.com.au/Our-Business/GrassyPoint/Documents/Grassy%20Point_Report.pdf Project Description]&lt;br /&gt;
# [https://www.projects.eao.gov.bc.ca/p/588511f2aaecd9001b82843c/project-details Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5722 NEB approves Woodside Energy LNG export licence]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76603</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76603"/>
		<updated>2026-01-26T11:47:02Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]] - Canada&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Goldboro_LNG_Export_Terminal_Project&amp;diff=76602</id>
		<title>Goldboro LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Goldboro_LNG_Export_Terminal_Project&amp;diff=76602"/>
		<updated>2026-01-26T11:46:42Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Pieridae Energy Canada &lt;br /&gt;
* Website: http://goldborolng.com/&lt;br /&gt;
* Location: Goldboro, Nova Scotia, Canada &lt;br /&gt;
* Capacity: 10.0 million tons/annum &lt;br /&gt;
* Status: Planned &lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* Planned to be eastern Canada's first LNG export terminal, the project was originally an import terminal.&lt;br /&gt;
* See [[Goldboro LNG Terminal]]&lt;br /&gt;
* The marine terminal will be designed to accommodate LNG carriers ranging in size from 145,000 m3 to 263,000 m3&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: The on-site gross storage capacity for liquid natural gas (LNG) will be approximately 690,000 m3 in three 230,000 m3 tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
** **CB&amp;amp;I:** Front-End Engineering and Design&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: The terminal will be supplied with gas via the [[[Maritimes And Northeast Gas Pipeline]]]&lt;br /&gt;
* Customers: E.ON Global Commodities has contracted for the full volume&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2012 - Project announced&lt;br /&gt;
* 2013 - Pieridae Energy registers Goldboro LNG for Environmental Assessment&lt;br /&gt;
* 2014 - CB&amp;amp;I Awarded Front-End Engineering and Design Contract&lt;br /&gt;
* 2015 - National Energy Board Issues Import and Export Licences&lt;br /&gt;
* 2020 - Bechtel awarded contract to develop a comprehensive engineering, procurement, construction and commissioning (“EPCC”) execution plan&lt;br /&gt;
* 2021 - The project was paused&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
===  Links ===&lt;br /&gt;
# [http://www.gov.ns.ca/nse/ea/goldboro-lng.asp Goldboro LNG Project, ]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3304 Energy company to develop Eastern Canadian LNG export facility]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3891 Pieridae Energy registers Goldboro LNG for Environmental Assessment]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5224 CB&amp;amp;I Awarded Front-End Engineering and Design Contract for the Development of the Goldboro LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5997 National Energy Board Issues Import and Export Licences to Pieridae Energy (Canada) Ltd.]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2021/12/pieridae-engages-epcc-contractor-bechtel.html Pieridae engages EPCC contractor Bechtel]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2022/06/pieridae-evaluating-goldboro-lng.html Pieridae Evaluating Goldboro LNG Strategic Alternatives]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76601</id>
		<title>LNG Terminal Projects That have been Cancelled or Suspended</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminal_Projects_That_have_been_Cancelled_or_Suspended&amp;diff=76601"/>
		<updated>2026-01-26T11:43:14Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bearhead LNG Terminal]] - Canada&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]] - Canada&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]]&lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Cacouna LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]]&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Crown Landing LNG Terminal]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]] - Canada&lt;br /&gt;
* [[Goldboro LNG Terminal]]&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Port Dolphin LNG Terminal]]&lt;br /&gt;
* [[Port Pelican LNG Terminal]]&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Douglas_Channel_LNG_Terminal_Project&amp;diff=76600</id>
		<title>Douglas Channel LNG Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Douglas_Channel_LNG_Terminal_Project&amp;diff=76600"/>
		<updated>2026-01-26T11:42:21Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Douglas Channel Energy Partners (DCEP) &lt;br /&gt;
* Website: http://douglaschannelenergy.com/&lt;br /&gt;
* Location: Douglas Channel, BC, Canada &lt;br /&gt;
* Capacity: 0.9 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The barge-based liquefaction plant will utilize the proven Prico LNG process and be largely self-contained. &lt;br /&gt;
* The plant will be fabricated and assembled in a shipyard, then towed to its permanent location in Douglas Channel where it will be grounded on a prepared foundation and interconnected to support systems and the berth. &lt;br /&gt;
* A small LNG buffer tank, electrical substation, and other support facilities will be located on land adjacent to the liquifaction plant.&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: &lt;br /&gt;
* Constructor:&lt;br /&gt;
** '''EXMAR:''' Design, contract, and deliver a newbuild floating barge &lt;br /&gt;
* Licensor: '''Black &amp;amp; Veatch''' PRICO® LNG Process&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Engineering design and construction schedules to be confirmed in January/February 2012&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Pacific Northern Gas Pipeline&lt;br /&gt;
* Customers: Golar LNG will buy 700,000 metric tonnes per annum of LNG&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2011 - Black &amp;amp; Veatch awarded FEED contract&lt;br /&gt;
* 2012 - BC LNG gets 20-year Licence to Export Liquefied Natural Gas from the proposed facility&lt;br /&gt;
* 2013 - Golar LNG sign take off contract&lt;br /&gt;
* 2013 - Exmar awarded barge contract&lt;br /&gt;
* 2015 - Project acquired by consortium&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1244 Western Canada natural gas export facility features Black &amp;amp; Veatch’s PRICO® process]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2008 BC LNG gets 20-year Licence to Export Liquefied Natural Gas]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2370 Government of Canada Approves Licence to Export Liquefied Natural Gas]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3739 BC LNG Export Co-Operative LLC Finalises Contract Awards]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4491 BC LNG Pre-FID Steering Committee Clariﬁcation to recent media articles]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4497 EXMAR teams up with LNG Partners for BC LNG Project]&lt;br /&gt;
# [http://abarrelfull.wikidot.com/local--files/douglas-channel-lng-terminal-project/A2S1X0_-_Letter_and_Order_GL-299_to_BC_LNG_-__Long_term_LNG_export_.pdf Export Licence]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5732 Fresh Start for Douglas Channel LNG Project as New Owners Take Control]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76599</id>
		<title>Kitimat LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76599"/>
		<updated>2026-01-26T11:33:33Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Kitimat LNG (Apache / Chevron)&lt;br /&gt;
* Website: http://www.kitimatlngfacility.com/&lt;br /&gt;
* Location: Bish Cove near the Port of Kitimat, BC, Canada  &lt;br /&gt;
* Capacity: 3.5-5.0 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Kitimat LNG Terminal is a liquefaction and export facility&lt;br /&gt;
* Kitimat LNG Terminal will include marine on-loading, LNG storage, natural gas delivery, liquefaction and LNG send-out facilities. &lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: Two 210,000 m3 LNG storage tanks (approximately 8.9 Bcf of natural gas) with potential future expansion to three tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
** '''KBR:''' Front End Engineering and Design (FEED) &lt;br /&gt;
** '''Fluor / JGC:''''' Engineering, procurement and construction (EPC)&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
* Kitimat LNG Inc. expects to the FID for Kitimat LNG Terminal train 1 in 2012,&lt;br /&gt;
* Kitimat LNG received its Provincial Environmental Certificate for the liquefaction terminal in December 2008 and the Federal Environmental Certificate in January 2009.&lt;br /&gt;
* the FEED for the project has been awarded in March 2011&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: The terminal will take delivery of gas via a pipeline lateral, approximately 15 kilometres long, from the [[Pacific Trail Gas Pipelines]], which will be connected to the existing Spectra Energy’s [[West Coast Energy Gas Pipeline]]. &lt;br /&gt;
* Customers: &lt;br /&gt;
** The terminal offers a short route to important Asian customers&lt;br /&gt;
** Gas Natural, based in Spain, had tentatively agreed to buy 30% of the production from the terminal, while Korea Gas Corp had expressed interest in an additional 40%. However, these are MOUs, not purchase agreements&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2006 - Kitimat LNG Terminal received its environmental assessment certificate from the BC Environmental Assessment Agency and was granted federal environmental approval for a regasification terminal.&lt;br /&gt;
* 2008 - Kitimat LNG received its Provincial Environmental Certificate&lt;br /&gt;
* 2009 - Kitimat LNG received its Federal Environmental Certificate&lt;br /&gt;
* 2011 - The National Energy Board (NEB or the Board) announced that it will hold a public hearing to consider an application submitted by KM LNG Operating General Partnership (KM LNG) for a 20-year licence to export natural gas in the form of liquefied natural gas (LNG).&lt;br /&gt;
* 2011 - Kitimat LNG partners awarded KBR the Front End Engineering and Design (FEED) contract for the facility&lt;br /&gt;
* 2011 - Encana acquires a 30% interest in the project&lt;br /&gt;
* 2011 - The National Energy Board grants a 20 year export licence to the project&lt;br /&gt;
* 2012 - Chevron acquires Encana &amp;amp; EOG's share of the project&lt;br /&gt;
* 2013 - Chevron acquisition completed&lt;br /&gt;
* 2014 - Fluor and JGC Awarded EPC Contract&lt;br /&gt;
* 2014 - Apache announces sale of stake to Woodside&lt;br /&gt;
* 2019 - Chevron paused the project&lt;br /&gt;
* 2021 - Chevron cancelled the project&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* The terminal was originally conceived of as a regasification terminal.&lt;br /&gt;
* If completed it will be Canada's first LNG export terminal&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
&lt;br /&gt;
# [http://www.cjfw.ca/News/Story.aspx?ID=1314794 Haisla Members Approve LNG Lease]&lt;br /&gt;
# [http://a100.gov.bc.ca/appsdata/epic/documents/p244/1137189645610_5f08234ed4754316b54f925e36601e44.pdf Kitimat LNG Terminal Project Update]&lt;br /&gt;
# [http://www.calgarysun.com/money/2010/12/10/16507766.html Kitimat LNG files application to export gas, still looking for buyers]&lt;br /&gt;
# [[[JGC LNG Tank References]]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:500 Hearing Scheduled to Consider Application for License to Export Liquefied Natural Gas] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:598 KITIMAT LNG PARTNERS AWARD KBR THE FEED CONTRACT FOR LNG PROJECT]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:646 Encana to acquire 30 percent interest in proposed Kitimat, B.C. liquefied natural gas export development]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1053 Kitimat LNG To Purchase Eurocan Industrial Site]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1427 NEB grants 20-year export licence to KM LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3631 Chevron Subsidiary Acquires Operating Interest in Western Canada LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3823 Apache, Chevron Complete Chevron Canada's Entry Into Kitimat LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4880 Fluor and JGC Awarded EPC Contract for Kitimat LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5646 Apache Corporation announces the sale of Wheatstone and Kitimat LNG projects to Woodside Petroleum Limited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5831 Apache Completes Sale Of Kitimat LNG]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/chevron-canada-limited-to-exit-proposed.html chevron Canada limited to exit the proposed kitimat LNG project]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Chevron]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Aurora_LNG_Grassy_Point_Export_Terminal&amp;diff=76598</id>
		<title>Aurora LNG Grassy Point Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Aurora_LNG_Grassy_Point_Export_Terminal&amp;diff=76598"/>
		<updated>2026-01-26T11:32:29Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Nexen (CNOOC)&lt;br /&gt;
* Website: http://www.nexeninc.com/&lt;br /&gt;
* Location:  Prince Rupert, British Columbia, Canada&lt;br /&gt;
* Capacity: million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2011 - Nexen / Inpex sign JV&lt;br /&gt;
* 2013 - Nexen signed agreement for exclusive rights to the land required for the site&lt;br /&gt;
* 2014 - The NEB approves the export licence&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:nexen-announces-sale-and-joint-venture-partnership-f Nexen Announces Sale and Joint Venture Partnership for Northeast British Columbia Shale Gas Assets]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4724 CNOOC Limited to examine LNG development in British Columbia, Canada through Nexen]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5137 NEB Approves Aurora LNG and Oregon LNG Export Licenses]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Category:Cancelled&amp;diff=76597</id>
		<title>Category:Cancelled</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Category:Cancelled&amp;diff=76597"/>
		<updated>2026-01-26T11:31:36Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: Created blank page&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Bearhead_LNG_Export_Terminal_Project&amp;diff=76596</id>
		<title>Bearhead LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Bearhead_LNG_Export_Terminal_Project&amp;diff=76596"/>
		<updated>2026-01-26T11:31:21Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Liquefied Natural Gas Limited&lt;br /&gt;
* Website: http://www.lnglimited.com.au/&lt;br /&gt;
* Location: Bear Head, Nova Scotia, Canada &lt;br /&gt;
* Capacity: 8.0 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The project is now a large-scale green hydrogen and ammonia production, storage and export project&lt;br /&gt;
* The project was initially an import terminal, [[Bearhead LNG Terminal]]&lt;br /&gt;
* The Bear Head LNG site is located on the Strait of Canso in Point Tupper, Richmond County, Nova Scotia, which is about half the shipping distance to major European markets compared to U.S. Gulf Coast ports&lt;br /&gt;
* The project will use LNG Limited's own OSMR® LNG liquefaction process&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:  Two 180,000 cubic meter LNG tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor: LNG Limited&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2014 - LNG Ltd acquired the project&lt;br /&gt;
* 2015 - Construction permit awarded&lt;br /&gt;
* 2015 - DOE permission granted to export to FTA nations&lt;br /&gt;
* 2022 - Buckeye partners acquired the project&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:lng-ltd-to-acquire-bear-head-lng-project-in-canada LNG Ltd to Acquire Bear Head LNG Project in Canada]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5548 Bear Head LNG Plans Initial Phase of 8 MTPA]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5754 Bear Head LNG Takes A Major Step Forward In Canadian Regulatory Process]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5780 Bear Head LNG Receives Permit to Construct]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5963 Bear Head LNG Receives U.S. Department of Energy Approval of Exports to FTA Countries]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/buckeye-partners-completes-bear-head.html Buckeye Partners Completes Bear Head Clean Energy Acquisition]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Cancelled]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76595</id>
		<title>BG Group Prince Rupert LNG Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=BG_Group_Prince_Rupert_LNG_Export_Terminal&amp;diff=76595"/>
		<updated>2026-01-26T11:28:31Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: BG Group (Shell)&lt;br /&gt;
* Website: &lt;br /&gt;
* Location: Prince Rupert, BC, Canada &lt;br /&gt;
* Capacity: 21 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminals to be Completed in 201X | 201X]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Gas will be supplied from the [[[Montney Formation Gas Field]]]. Gas is to be transported via the [[[Westcoast Connector Gas Pipeline]]]&lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2012 - Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System &lt;br /&gt;
* 2013 - Canadian Environmental Assessment Agency asks for public feedback&lt;br /&gt;
* 2014 - Export licence awarded by the Ministry of Natural Resources&lt;br /&gt;
* 2015 - Shell acquire BG Group&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3077 Spectra Announces Project Development Agreement with BG Group for New Natural Gas Transportation System in British Columbia]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4197 Prince Rupert LNG Project Public Comments Invited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4819 NEB Approves Four LNG Export Licence Applications]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5052 Harper Government Announces Approval of Four Long-term LNG Export Licences]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76594</id>
		<title>Cedar LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76594"/>
		<updated>2026-01-26T11:21:24Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* History */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)&lt;br /&gt;
* Website: https://www.cedarlng.com/&lt;br /&gt;
* Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia&lt;br /&gt;
* Capacity: 3.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada&lt;br /&gt;
* The terminal will be powered by the local grid which uses hydro&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor: &lt;br /&gt;
** Black &amp;amp; Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel&lt;br /&gt;
** Samsung Heavy Industries will construct the vessel &lt;br /&gt;
* Licensor: [[LNG Terminals Using Black and Veatch Technology | Black &amp;amp; Veatch]]&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2027 | 2027]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline&lt;br /&gt;
* Customers: &lt;br /&gt;
** ARC Resources - 1.5 million tonnes of LNG per year&lt;br /&gt;
** Petronas has agreed to purchase 1.0mtpa of liquefaction services&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2022 - Black &amp;amp; Veatch Awarded Front End Engineering and Design&lt;br /&gt;
* 2023 - B.C. Environmental Approval&lt;br /&gt;
* 2023 - MOU signed with ARC for sale of LNG&lt;br /&gt;
* 2023 - HOA signed with Samsung Heavy Industries, Black &amp;amp; Veatch&lt;br /&gt;
* 2024 - Final investment decision reached&lt;br /&gt;
* 2025 - Petronas agreed to purchase liquefaction services&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black &amp;amp; Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/11/cedar-lng-executes-heads-of-agreement.html Cedar LNG Executes Heads of Agreement with Samsung Heavy Industries, Black &amp;amp; Veatch]&lt;br /&gt;
# [https://lng-news.blogspot.com/2024/01/cedar-lng-awards-epc-contract-for-state.html Cedar LNG awards EPC contract for state-of-the-art floating LNG production unit]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/cedar-lng-announces-positive-final.html Cedar LNG Announces Positive Final Investment Decision]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/pembina-and-petronas-enter-long-term.html Pembina and PETRONAS Enter Long-Term Agreement for Cedar LNG Capacity]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Pembina]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76593</id>
		<title>Cedar LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76593"/>
		<updated>2026-01-26T11:20:11Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Suppliers / Customers */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)&lt;br /&gt;
* Website: https://www.cedarlng.com/&lt;br /&gt;
* Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia&lt;br /&gt;
* Capacity: 3.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada&lt;br /&gt;
* The terminal will be powered by the local grid which uses hydro&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor: &lt;br /&gt;
** Black &amp;amp; Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel&lt;br /&gt;
** Samsung Heavy Industries will construct the vessel &lt;br /&gt;
* Licensor: [[LNG Terminals Using Black and Veatch Technology | Black &amp;amp; Veatch]]&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2027 | 2027]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline&lt;br /&gt;
* Customers: &lt;br /&gt;
** ARC Resources - 1.5 million tonnes of LNG per year&lt;br /&gt;
** Petronas has agreed to purchase 1.0mtpa of liquefaction services&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2022 - Black &amp;amp; Veatch Awarded Front End Engineering and Design&lt;br /&gt;
* 2023 - B.C. Environmental Approval&lt;br /&gt;
* 2023 - MOU signed with ARC for sale of LNG&lt;br /&gt;
* 2023 - HOA signed with Samsung Heavy Industries, Black &amp;amp; Veatch&lt;br /&gt;
* 2024 - Final investment decision reached&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black &amp;amp; Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/11/cedar-lng-executes-heads-of-agreement.html Cedar LNG Executes Heads of Agreement with Samsung Heavy Industries, Black &amp;amp; Veatch]&lt;br /&gt;
# [https://lng-news.blogspot.com/2024/01/cedar-lng-awards-epc-contract-for-state.html Cedar LNG awards EPC contract for state-of-the-art floating LNG production unit]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/cedar-lng-announces-positive-final.html Cedar LNG Announces Positive Final Investment Decision]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/pembina-and-petronas-enter-long-term.html Pembina and PETRONAS Enter Long-Term Agreement for Cedar LNG Capacity]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Pembina]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76592</id>
		<title>Cedar LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76592"/>
		<updated>2026-01-26T11:19:29Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Links */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)&lt;br /&gt;
* Website: https://www.cedarlng.com/&lt;br /&gt;
* Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia&lt;br /&gt;
* Capacity: 3.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada&lt;br /&gt;
* The terminal will be powered by the local grid which uses hydro&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor: &lt;br /&gt;
** Black &amp;amp; Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel&lt;br /&gt;
** Samsung Heavy Industries will construct the vessel &lt;br /&gt;
* Licensor: [[LNG Terminals Using Black and Veatch Technology | Black &amp;amp; Veatch]]&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2027 | 2027]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline&lt;br /&gt;
* Customers: ARC Resources - 1.5 million tonnes of LNG per year&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2022 - Black &amp;amp; Veatch Awarded Front End Engineering and Design&lt;br /&gt;
* 2023 - B.C. Environmental Approval&lt;br /&gt;
* 2023 - MOU signed with ARC for sale of LNG&lt;br /&gt;
* 2023 - HOA signed with Samsung Heavy Industries, Black &amp;amp; Veatch&lt;br /&gt;
* 2024 - Final investment decision reached&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black &amp;amp; Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/11/cedar-lng-executes-heads-of-agreement.html Cedar LNG Executes Heads of Agreement with Samsung Heavy Industries, Black &amp;amp; Veatch]&lt;br /&gt;
# [https://lng-news.blogspot.com/2024/01/cedar-lng-awards-epc-contract-for-state.html Cedar LNG awards EPC contract for state-of-the-art floating LNG production unit]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/cedar-lng-announces-positive-final.html Cedar LNG Announces Positive Final Investment Decision]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/pembina-and-petronas-enter-long-term.html Pembina and PETRONAS Enter Long-Term Agreement for Cedar LNG Capacity]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Pembina]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76591</id>
		<title>Cedar LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76591"/>
		<updated>2026-01-24T15:24:41Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Links */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)&lt;br /&gt;
* Website: https://www.cedarlng.com/&lt;br /&gt;
* Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia&lt;br /&gt;
* Capacity: 3.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada&lt;br /&gt;
* The terminal will be powered by the local grid which uses hydro&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor: &lt;br /&gt;
** Black &amp;amp; Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel&lt;br /&gt;
** Samsung Heavy Industries will construct the vessel &lt;br /&gt;
* Licensor: [[LNG Terminals Using Black and Veatch Technology | Black &amp;amp; Veatch]]&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2027 | 2027]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline&lt;br /&gt;
* Customers: ARC Resources - 1.5 million tonnes of LNG per year&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2022 - Black &amp;amp; Veatch Awarded Front End Engineering and Design&lt;br /&gt;
* 2023 - B.C. Environmental Approval&lt;br /&gt;
* 2023 - MOU signed with ARC for sale of LNG&lt;br /&gt;
* 2023 - HOA signed with Samsung Heavy Industries, Black &amp;amp; Veatch&lt;br /&gt;
* 2024 - Final investment decision reached&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black &amp;amp; Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/11/cedar-lng-executes-heads-of-agreement.html Cedar LNG Executes Heads of Agreement with Samsung Heavy Industries, Black &amp;amp; Veatch]&lt;br /&gt;
# [https://lng-news.blogspot.com/2024/01/cedar-lng-awards-epc-contract-for-state.html Cedar LNG awards EPC contract for state-of-the-art floating LNG production unit]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/cedar-lng-announces-positive-final.html Cedar LNG Announces Positive Final Investment Decision]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76590</id>
		<title>Cedar LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Cedar_LNG_Export_Terminal_Project&amp;diff=76590"/>
		<updated>2026-01-24T15:24:19Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* History */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)&lt;br /&gt;
* Website: https://www.cedarlng.com/&lt;br /&gt;
* Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia&lt;br /&gt;
* Capacity: 3.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada&lt;br /&gt;
* The terminal will be powered by the local grid which uses hydro&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor: &lt;br /&gt;
** Black &amp;amp; Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel&lt;br /&gt;
** Samsung Heavy Industries will construct the vessel &lt;br /&gt;
* Licensor: [[LNG Terminals Using Black and Veatch Technology | Black &amp;amp; Veatch]]&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2027 | 2027]]&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline&lt;br /&gt;
* Customers: ARC Resources - 1.5 million tonnes of LNG per year&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2022 - Black &amp;amp; Veatch Awarded Front End Engineering and Design&lt;br /&gt;
* 2023 - B.C. Environmental Approval&lt;br /&gt;
* 2023 - MOU signed with ARC for sale of LNG&lt;br /&gt;
* 2023 - HOA signed with Samsung Heavy Industries, Black &amp;amp; Veatch&lt;br /&gt;
* 2024 - Final investment decision reached&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black &amp;amp; Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]&lt;br /&gt;
# [https://lng-news.blogspot.com/2023/11/cedar-lng-executes-heads-of-agreement.html Cedar LNG Executes Heads of Agreement with Samsung Heavy Industries, Black &amp;amp; Veatch]&lt;br /&gt;
# [https://lng-news.blogspot.com/2024/01/cedar-lng-awards-epc-contract-for-state.html Cedar LNG awards EPC contract for state-of-the-art floating LNG production unit]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76589</id>
		<title>LNG Terminals in North America</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76589"/>
		<updated>2026-01-24T15:10:06Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Canada */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== LNG Import Terminals in North America === &lt;br /&gt;
&lt;br /&gt;
==== Canada ====&lt;br /&gt;
* [[Canaport LNG]], Saint John, New Brunswick&lt;br /&gt;
* [[Rabaska LNG Terminal]],&lt;br /&gt;
* [[Texada LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
&lt;br /&gt;
* [[Bearhead LNG Terminal]], Cancelled&lt;br /&gt;
* [[Cacouna LNG Terminal]], Cancelled&lt;br /&gt;
* [[Goldboro LNG Terminal]], Nova Scotia, Cancelled&lt;br /&gt;
* [[Kitimat LNG Terminal]], Cancelled&lt;br /&gt;
&lt;br /&gt;
==== Mexico ====&lt;br /&gt;
* [[Altamira LNG Terminal]], Shell, opened August 2006&lt;br /&gt;
* [[Costa Azul LNG]] in Ensenada, Sempra Energy, opened May 2008&lt;br /&gt;
* [[Lazaro Cardenas LNG Terminal]]&lt;br /&gt;
* [[Manzanillo LNG terminal]], &lt;br /&gt;
* [[Sonora LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
==== Puerto Rico ====&lt;br /&gt;
* [[Aguirre GasPort LNG Terminal]]&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], Punta Guayanilla&lt;br /&gt;
&lt;br /&gt;
==== United States ====&lt;br /&gt;
&lt;br /&gt;
===== Operational LNG Terminals =====&lt;br /&gt;
* [[Cameron LNG Terminal]], LA&lt;br /&gt;
* [[Dominion Cove Point LNG Terminal]], MD&lt;br /&gt;
* [[Elba Island LNG Import Terminal]], GA&lt;br /&gt;
* [[Everett Marine LNG Terminal]], MA&lt;br /&gt;
* [[Freeport LNG Import Terminal]], TX&lt;br /&gt;
* [[Golden Pass LNG Terminal]], TX&lt;br /&gt;
* [[Gulf Pascagoula LNG Terminal]], MS&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], PR&lt;br /&gt;
* [[Sabine Pass LNG Terminal]], LA&lt;br /&gt;
* [[Trunkline Lake Charles LNG Terminal]], LA&lt;br /&gt;
&lt;br /&gt;
===== LNG Projects Which have not been Built =====&lt;br /&gt;
* [[Bienville LNG Terminal]], Dauphin Island, Alabama - (Torp)&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Creole Trail LNG Terminal]],&lt;br /&gt;
* [[Crown Landing LNG Terminal]],&lt;br /&gt;
* [[Downeast LNG Terminal]],&lt;br /&gt;
* [[Gulf Gateway Deepwater Port LNG Terminal]], Gulf of Mexico - (Excelerate Energy LLC)&lt;br /&gt;
* [[Hawaii LNG Terminal]],&lt;br /&gt;
* [[Jordan Cove LNG Terminal]]&lt;br /&gt;
* [[Liberty LNG Terminal]], New Jersey&lt;br /&gt;
* [[Neptune LNG Terminal]], Massachusetts, GDF&lt;br /&gt;
* [[Oregon LNG Terminal]],&lt;br /&gt;
* [[Port Arthur LNG Terminal]],&lt;br /&gt;
* [[Port Esperanza LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]], &lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]],&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Compass Port LNG Terminal]]&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Long Beach LNG Terminal]], California&lt;br /&gt;
* [[Port Dolphin LNG Terminal]], Tallahassee, FL&lt;br /&gt;
* [[Port Pelican LNG Terminal]],&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Vista Del Sol LNG Terminal]],&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
=== LNG Export Terminals in North America ===&lt;br /&gt;
&lt;br /&gt;
* [[Long Term Applications Received by DOE/FE]]&lt;br /&gt;
&lt;br /&gt;
==== In Operation ====&lt;br /&gt;
* [[Calcasieu Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Cameron LNG Terminal]],&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Dominion Cove Point LNG Export Terminal]]&lt;br /&gt;
* [[Elba Island LNG Terminal]]&lt;br /&gt;
* [[Freeport LNG Terminal]]&lt;br /&gt;
* [[Kenai Alaska LNG Terminal]], USA&lt;br /&gt;
* [[Plaquemines LNG Export Terminal Project]]&lt;br /&gt;
* [[Sabine Pass LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
* [[Shell British Columbia LNG Terminal]] - Canada&lt;br /&gt;
&lt;br /&gt;
==== Projects ====&lt;br /&gt;
&lt;br /&gt;
===== Canada =====&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]]&lt;br /&gt;
* [[Cedar LNG Export Terminal Project]]&lt;br /&gt;
* [[Discovery LNG Export Terminal Project]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]]&lt;br /&gt;
* [[Goldboro LNG Export Terminal Project]]&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]]&lt;br /&gt;
* [[Kitsault LNG Export Terminal]]&lt;br /&gt;
* [[Ksi Lisims LNG Export Terminal]]&lt;br /&gt;
* [[Malahat LNG Export Terminal Project]]&lt;br /&gt;
* [[Orca LNG Export Terminal Project]]&lt;br /&gt;
* [[Sarita Bay LNG Export Terminal Project]]&lt;br /&gt;
* [[Triton LNG Export Terminal]]&lt;br /&gt;
* [[WCC LNG Export Terminal Project]]&lt;br /&gt;
* [[Woodfibre LNG Export Terminal Project]]&lt;br /&gt;
&lt;br /&gt;
* [[Aurora LNG Grassy Point Export Terminal]] - '''Cancelled'''&lt;br /&gt;
* [[Bearhead LNG Export Terminal Project]] - '''Cancelled'''&lt;br /&gt;
* [[Kitimat LNG Terminal]] - '''Cancelled'''&lt;br /&gt;
* [[Pacific Northwest LNG Export Terminal Project]] - '''Cancelled'''&lt;br /&gt;
&lt;br /&gt;
===== Mexico ===== &lt;br /&gt;
* [[Amigo LNG Export Terminal]]&lt;br /&gt;
* [[Coatzacoalcos LNG Export Terminal]]&lt;br /&gt;
* [[Energia Costa Azul LNG Export Terminal]]&lt;br /&gt;
* [[Lakach FLNG Export Terminal]]&lt;br /&gt;
* [[Saguaro Energía LNG Export Terminal]]&lt;br /&gt;
* [[Salina Cruz LNG Export Terminal]]&lt;br /&gt;
* [[Vista Pacifico LNG Export Terminal]]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===== USA ===== &lt;br /&gt;
* [[Alaska South Central LNG Export Terminal Project]]&lt;br /&gt;
* [[Annova LNG Export Terminal Project]] - '''cancelled'''&lt;br /&gt;
* [[Argent LNG Export Terminal Project]]&lt;br /&gt;
* [[CP2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Commonwealth LNG Export Terminal Project]]&lt;br /&gt;
* [[Delfin LNG Export Terminal Project]],&lt;br /&gt;
* [[Fourchon LNG Export Terminal Project]],&lt;br /&gt;
* [[G2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Golden Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Gulf LNG Export Terminal Project]]&lt;br /&gt;
* [[Jordan Cove LNG Export Terminal Project]]&lt;br /&gt;
* [[Magnolia LNG Export Terminal Project]]&lt;br /&gt;
* [[Main Pass Energy Hub Export Terminal Project]]&lt;br /&gt;
* [[Mississippi Louisiana LNG Export Terminal Project]]&lt;br /&gt;
* [[Monkey Island LNG Export Terminal Project]], LA&lt;br /&gt;
* [[Port Arthur LNG Export Terminal Project]]&lt;br /&gt;
* [[Port Lavaca Floating LNG Export Terminal Project]]&lt;br /&gt;
* [[Port of Brownsville LNG Export Terminal Project]]&lt;br /&gt;
* [[Rio Grande Export Terminal LNG Project]]&lt;br /&gt;
* [[South Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Trunkline Lake Charles LNG Export Terminal Project]] / [[Lake Charles LNG Export Terminal Project]]&lt;br /&gt;
* [[Warrenton Oregon LNG Export Terminal]]&lt;br /&gt;
* [[Woodside Louisiana LNG Export Terminal Project]],&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Bearhead_LNG_Export_Terminal_Project&amp;diff=76588</id>
		<title>Bearhead LNG Export Terminal Project</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Bearhead_LNG_Export_Terminal_Project&amp;diff=76588"/>
		<updated>2026-01-24T15:09:42Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Liquefied Natural Gas Limited&lt;br /&gt;
* Website: http://www.lnglimited.com.au/&lt;br /&gt;
* Location: Bear Head, Nova Scotia, Canada &lt;br /&gt;
* Capacity: 8.0 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The project is now a large-scale green hydrogen and ammonia production, storage and export project&lt;br /&gt;
* The project was initially an import terminal, [[Bearhead LNG Terminal]]&lt;br /&gt;
* The Bear Head LNG site is located on the Strait of Canso in Point Tupper, Richmond County, Nova Scotia, which is about half the shipping distance to major European markets compared to U.S. Gulf Coast ports&lt;br /&gt;
* The project will use LNG Limited's own OSMR® LNG liquefaction process&lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity:  Two 180,000 cubic meter LNG tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor: LNG Limited&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been cancelled&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2014 - LNG Ltd acquired the project&lt;br /&gt;
* 2015 - Construction permit awarded&lt;br /&gt;
* 2015 - DOE permission granted to export to FTA nations&lt;br /&gt;
* 2022 - Buckeye partners acquired the project&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:lng-ltd-to-acquire-bear-head-lng-project-in-canada LNG Ltd to Acquire Bear Head LNG Project in Canada]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5548 Bear Head LNG Plans Initial Phase of 8 MTPA]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5754 Bear Head LNG Takes A Major Step Forward In Canadian Regulatory Process]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5780 Bear Head LNG Receives Permit to Construct]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5963 Bear Head LNG Receives U.S. Department of Energy Approval of Exports to FTA Countries]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/buckeye-partners-completes-bear-head.html Buckeye Partners Completes Bear Head Clean Energy Acquisition]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76587</id>
		<title>LNG Terminals in North America</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76587"/>
		<updated>2026-01-24T15:04:19Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Canada */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== LNG Import Terminals in North America === &lt;br /&gt;
&lt;br /&gt;
==== Canada ====&lt;br /&gt;
* [[Canaport LNG]], Saint John, New Brunswick&lt;br /&gt;
* [[Rabaska LNG Terminal]],&lt;br /&gt;
* [[Texada LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
&lt;br /&gt;
* [[Bearhead LNG Terminal]], Cancelled&lt;br /&gt;
* [[Cacouna LNG Terminal]], Cancelled&lt;br /&gt;
* [[Goldboro LNG Terminal]], Nova Scotia, Cancelled&lt;br /&gt;
* [[Kitimat LNG Terminal]], Cancelled&lt;br /&gt;
&lt;br /&gt;
==== Mexico ====&lt;br /&gt;
* [[Altamira LNG Terminal]], Shell, opened August 2006&lt;br /&gt;
* [[Costa Azul LNG]] in Ensenada, Sempra Energy, opened May 2008&lt;br /&gt;
* [[Lazaro Cardenas LNG Terminal]]&lt;br /&gt;
* [[Manzanillo LNG terminal]], &lt;br /&gt;
* [[Sonora LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
==== Puerto Rico ====&lt;br /&gt;
* [[Aguirre GasPort LNG Terminal]]&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], Punta Guayanilla&lt;br /&gt;
&lt;br /&gt;
==== United States ====&lt;br /&gt;
&lt;br /&gt;
===== Operational LNG Terminals =====&lt;br /&gt;
* [[Cameron LNG Terminal]], LA&lt;br /&gt;
* [[Dominion Cove Point LNG Terminal]], MD&lt;br /&gt;
* [[Elba Island LNG Import Terminal]], GA&lt;br /&gt;
* [[Everett Marine LNG Terminal]], MA&lt;br /&gt;
* [[Freeport LNG Import Terminal]], TX&lt;br /&gt;
* [[Golden Pass LNG Terminal]], TX&lt;br /&gt;
* [[Gulf Pascagoula LNG Terminal]], MS&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], PR&lt;br /&gt;
* [[Sabine Pass LNG Terminal]], LA&lt;br /&gt;
* [[Trunkline Lake Charles LNG Terminal]], LA&lt;br /&gt;
&lt;br /&gt;
===== LNG Projects Which have not been Built =====&lt;br /&gt;
* [[Bienville LNG Terminal]], Dauphin Island, Alabama - (Torp)&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Creole Trail LNG Terminal]],&lt;br /&gt;
* [[Crown Landing LNG Terminal]],&lt;br /&gt;
* [[Downeast LNG Terminal]],&lt;br /&gt;
* [[Gulf Gateway Deepwater Port LNG Terminal]], Gulf of Mexico - (Excelerate Energy LLC)&lt;br /&gt;
* [[Hawaii LNG Terminal]],&lt;br /&gt;
* [[Jordan Cove LNG Terminal]]&lt;br /&gt;
* [[Liberty LNG Terminal]], New Jersey&lt;br /&gt;
* [[Neptune LNG Terminal]], Massachusetts, GDF&lt;br /&gt;
* [[Oregon LNG Terminal]],&lt;br /&gt;
* [[Port Arthur LNG Terminal]],&lt;br /&gt;
* [[Port Esperanza LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]], &lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]],&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Compass Port LNG Terminal]]&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Long Beach LNG Terminal]], California&lt;br /&gt;
* [[Port Dolphin LNG Terminal]], Tallahassee, FL&lt;br /&gt;
* [[Port Pelican LNG Terminal]],&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Vista Del Sol LNG Terminal]],&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
=== LNG Export Terminals in North America ===&lt;br /&gt;
&lt;br /&gt;
* [[Long Term Applications Received by DOE/FE]]&lt;br /&gt;
&lt;br /&gt;
==== In Operation ====&lt;br /&gt;
* [[Calcasieu Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Cameron LNG Terminal]],&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Dominion Cove Point LNG Export Terminal]]&lt;br /&gt;
* [[Elba Island LNG Terminal]]&lt;br /&gt;
* [[Freeport LNG Terminal]]&lt;br /&gt;
* [[Kenai Alaska LNG Terminal]], USA&lt;br /&gt;
* [[Plaquemines LNG Export Terminal Project]]&lt;br /&gt;
* [[Sabine Pass LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
* [[Shell British Columbia LNG Terminal]] - Canada&lt;br /&gt;
&lt;br /&gt;
==== Projects ====&lt;br /&gt;
&lt;br /&gt;
===== Canada =====&lt;br /&gt;
* [[Bearhead LNG Export Terminal Project]]&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]]&lt;br /&gt;
* [[Cedar LNG Export Terminal Project]]&lt;br /&gt;
* [[Discovery LNG Export Terminal Project]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]]&lt;br /&gt;
* [[Goldboro LNG Export Terminal Project]]&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]]&lt;br /&gt;
* [[Kitsault LNG Export Terminal]]&lt;br /&gt;
* [[Ksi Lisims LNG Export Terminal]]&lt;br /&gt;
* [[Malahat LNG Export Terminal Project]]&lt;br /&gt;
* [[Orca LNG Export Terminal Project]]&lt;br /&gt;
* [[Sarita Bay LNG Export Terminal Project]]&lt;br /&gt;
* [[Triton LNG Export Terminal]]&lt;br /&gt;
* [[WCC LNG Export Terminal Project]]&lt;br /&gt;
* [[Woodfibre LNG Export Terminal Project]]&lt;br /&gt;
&lt;br /&gt;
* [[Aurora LNG Grassy Point Export Terminal]] - '''Cancelled'''&lt;br /&gt;
* [[Kitimat LNG Terminal]] - '''Cancelled'''&lt;br /&gt;
* [[Pacific Northwest LNG Export Terminal Project]] - '''Cancelled'''&lt;br /&gt;
&lt;br /&gt;
===== Mexico ===== &lt;br /&gt;
* [[Amigo LNG Export Terminal]]&lt;br /&gt;
* [[Coatzacoalcos LNG Export Terminal]]&lt;br /&gt;
* [[Energia Costa Azul LNG Export Terminal]]&lt;br /&gt;
* [[Lakach FLNG Export Terminal]]&lt;br /&gt;
* [[Saguaro Energía LNG Export Terminal]]&lt;br /&gt;
* [[Salina Cruz LNG Export Terminal]]&lt;br /&gt;
* [[Vista Pacifico LNG Export Terminal]]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===== USA ===== &lt;br /&gt;
* [[Alaska South Central LNG Export Terminal Project]]&lt;br /&gt;
* [[Annova LNG Export Terminal Project]] - '''cancelled'''&lt;br /&gt;
* [[Argent LNG Export Terminal Project]]&lt;br /&gt;
* [[CP2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Commonwealth LNG Export Terminal Project]]&lt;br /&gt;
* [[Delfin LNG Export Terminal Project]],&lt;br /&gt;
* [[Fourchon LNG Export Terminal Project]],&lt;br /&gt;
* [[G2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Golden Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Gulf LNG Export Terminal Project]]&lt;br /&gt;
* [[Jordan Cove LNG Export Terminal Project]]&lt;br /&gt;
* [[Magnolia LNG Export Terminal Project]]&lt;br /&gt;
* [[Main Pass Energy Hub Export Terminal Project]]&lt;br /&gt;
* [[Mississippi Louisiana LNG Export Terminal Project]]&lt;br /&gt;
* [[Monkey Island LNG Export Terminal Project]], LA&lt;br /&gt;
* [[Port Arthur LNG Export Terminal Project]]&lt;br /&gt;
* [[Port Lavaca Floating LNG Export Terminal Project]]&lt;br /&gt;
* [[Port of Brownsville LNG Export Terminal Project]]&lt;br /&gt;
* [[Rio Grande Export Terminal LNG Project]]&lt;br /&gt;
* [[South Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Trunkline Lake Charles LNG Export Terminal Project]] / [[Lake Charles LNG Export Terminal Project]]&lt;br /&gt;
* [[Warrenton Oregon LNG Export Terminal]]&lt;br /&gt;
* [[Woodside Louisiana LNG Export Terminal Project]],&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Aurora_LNG_Grassy_Point_Export_Terminal&amp;diff=76586</id>
		<title>Aurora LNG Grassy Point Export Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Aurora_LNG_Grassy_Point_Export_Terminal&amp;diff=76586"/>
		<updated>2026-01-24T15:03:41Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Nexen (CNOOC)&lt;br /&gt;
* Website: http://www.nexeninc.com/&lt;br /&gt;
* Location:  Prince Rupert, British Columbia, Canada&lt;br /&gt;
* Capacity: million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
+++ Technical Details ===&lt;br /&gt;
* Storage capacity:&lt;br /&gt;
* Constructor:&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* The project has been cancelled&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: &lt;br /&gt;
* Customers: &lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2011 - Nexen / Inpex sign JV&lt;br /&gt;
* 2013 - Nexen signed agreement for exclusive rights to the land required for the site&lt;br /&gt;
* 2014 - The NEB approves the export licence&lt;br /&gt;
* 2017 - The project was cancelled&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [http://killajoules.wikidot.com/archive:nexen-announces-sale-and-joint-venture-partnership-f Nexen Announces Sale and Joint Venture Partnership for Northeast British Columbia Shale Gas Assets]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4724 CNOOC Limited to examine LNG development in British Columbia, Canada through Nexen]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5137 NEB Approves Aurora LNG and Oregon LNG Export Licenses]&lt;br /&gt;
&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76585</id>
		<title>LNG Terminals in North America</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=LNG_Terminals_in_North_America&amp;diff=76585"/>
		<updated>2026-01-24T14:59:32Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Projects */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== LNG Import Terminals in North America === &lt;br /&gt;
&lt;br /&gt;
==== Canada ====&lt;br /&gt;
* [[Canaport LNG]], Saint John, New Brunswick&lt;br /&gt;
* [[Rabaska LNG Terminal]],&lt;br /&gt;
* [[Texada LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
&lt;br /&gt;
* [[Bearhead LNG Terminal]], Cancelled&lt;br /&gt;
* [[Cacouna LNG Terminal]], Cancelled&lt;br /&gt;
* [[Goldboro LNG Terminal]], Nova Scotia, Cancelled&lt;br /&gt;
* [[Kitimat LNG Terminal]], Cancelled&lt;br /&gt;
&lt;br /&gt;
==== Mexico ====&lt;br /&gt;
* [[Altamira LNG Terminal]], Shell, opened August 2006&lt;br /&gt;
* [[Costa Azul LNG]] in Ensenada, Sempra Energy, opened May 2008&lt;br /&gt;
* [[Lazaro Cardenas LNG Terminal]]&lt;br /&gt;
* [[Manzanillo LNG terminal]], &lt;br /&gt;
* [[Sonora LNG Terminal]],&lt;br /&gt;
&lt;br /&gt;
==== Puerto Rico ====&lt;br /&gt;
* [[Aguirre GasPort LNG Terminal]]&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], Punta Guayanilla&lt;br /&gt;
&lt;br /&gt;
==== United States ====&lt;br /&gt;
&lt;br /&gt;
===== Operational LNG Terminals =====&lt;br /&gt;
* [[Cameron LNG Terminal]], LA&lt;br /&gt;
* [[Dominion Cove Point LNG Terminal]], MD&lt;br /&gt;
* [[Elba Island LNG Import Terminal]], GA&lt;br /&gt;
* [[Everett Marine LNG Terminal]], MA&lt;br /&gt;
* [[Freeport LNG Import Terminal]], TX&lt;br /&gt;
* [[Golden Pass LNG Terminal]], TX&lt;br /&gt;
* [[Gulf Pascagoula LNG Terminal]], MS&lt;br /&gt;
* [[Penuelas EcoEléctrica LNG Terminal]], PR&lt;br /&gt;
* [[Sabine Pass LNG Terminal]], LA&lt;br /&gt;
* [[Trunkline Lake Charles LNG Terminal]], LA&lt;br /&gt;
&lt;br /&gt;
===== LNG Projects Which have not been Built =====&lt;br /&gt;
* [[Bienville LNG Terminal]], Dauphin Island, Alabama - (Torp)&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Creole Trail LNG Terminal]],&lt;br /&gt;
* [[Crown Landing LNG Terminal]],&lt;br /&gt;
* [[Downeast LNG Terminal]],&lt;br /&gt;
* [[Gulf Gateway Deepwater Port LNG Terminal]], Gulf of Mexico - (Excelerate Energy LLC)&lt;br /&gt;
* [[Hawaii LNG Terminal]],&lt;br /&gt;
* [[Jordan Cove LNG Terminal]]&lt;br /&gt;
* [[Liberty LNG Terminal]], New Jersey&lt;br /&gt;
* [[Neptune LNG Terminal]], Massachusetts, GDF&lt;br /&gt;
* [[Oregon LNG Terminal]],&lt;br /&gt;
* [[Port Arthur LNG Terminal]],&lt;br /&gt;
* [[Port Esperanza LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
===== Cancelled =====&lt;br /&gt;
* [[Beacon Port LNG Terminal]]&lt;br /&gt;
* [[Bradwood Landing LNG Terminal]], &lt;br /&gt;
* [[Broadwater LNG Terminal]]&lt;br /&gt;
* [[Calais LNG Terminal]]&lt;br /&gt;
* [[Calhoun LNG Terminal]],&lt;br /&gt;
* [[Calypso LNG Terminal]]&lt;br /&gt;
* [[Casotte Landing LNG Terminal]]&lt;br /&gt;
* [[Compass Port LNG Terminal]]&lt;br /&gt;
* [[Ingleside Energy LNG Terminal]]&lt;br /&gt;
* [[Keyspan LNG Terminal]]&lt;br /&gt;
* [[Long Beach LNG Terminal]], California&lt;br /&gt;
* [[Port Dolphin LNG Terminal]], Tallahassee, FL&lt;br /&gt;
* [[Port Pelican LNG Terminal]],&lt;br /&gt;
* [[Sparrows Point LNG Terminal]]&lt;br /&gt;
* [[Vista Del Sol LNG Terminal]],&lt;br /&gt;
* [[Weavers Cove LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
=== LNG Export Terminals in North America ===&lt;br /&gt;
&lt;br /&gt;
* [[Long Term Applications Received by DOE/FE]]&lt;br /&gt;
&lt;br /&gt;
==== In Operation ====&lt;br /&gt;
* [[Calcasieu Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Cameron LNG Terminal]],&lt;br /&gt;
* [[Corpus Christi LNG Terminal]],&lt;br /&gt;
* [[Dominion Cove Point LNG Export Terminal]]&lt;br /&gt;
* [[Elba Island LNG Terminal]]&lt;br /&gt;
* [[Freeport LNG Terminal]]&lt;br /&gt;
* [[Kenai Alaska LNG Terminal]], USA&lt;br /&gt;
* [[Plaquemines LNG Export Terminal Project]]&lt;br /&gt;
* [[Sabine Pass LNG Terminal]]&lt;br /&gt;
&lt;br /&gt;
* [[Shell British Columbia LNG Terminal]] - Canada&lt;br /&gt;
&lt;br /&gt;
==== Projects ====&lt;br /&gt;
&lt;br /&gt;
===== Canada =====&lt;br /&gt;
* [[Aurora LNG Grassy Point Export Terminal]]&lt;br /&gt;
* [[Bearhead LNG Export Terminal Project]]&lt;br /&gt;
* [[BG Group Prince Rupert LNG Export Terminal]]&lt;br /&gt;
* [[Cedar LNG Export Terminal Project]]&lt;br /&gt;
* [[Discovery LNG Export Terminal Project]]&lt;br /&gt;
* [[Douglas Channel LNG Terminal Project]]&lt;br /&gt;
* [[Goldboro LNG Export Terminal Project]]&lt;br /&gt;
* [[Grassy Point Woodside LNG Export Terminal Project]]&lt;br /&gt;
* [[Kitimat LNG Terminal]] - '''Cancelled'''&lt;br /&gt;
* [[Kitsault LNG Export Terminal]]&lt;br /&gt;
* [[Ksi Lisims LNG Export Terminal]]&lt;br /&gt;
* [[Malahat LNG Export Terminal Project]]&lt;br /&gt;
* [[Orca LNG Export Terminal Project]]&lt;br /&gt;
* [[Pacific Northwest LNG Export Terminal Project]] - '''Cancelled'''&lt;br /&gt;
* [[Sarita Bay LNG Export Terminal Project]]&lt;br /&gt;
* [[Triton LNG Export Terminal]]&lt;br /&gt;
* [[WCC LNG Export Terminal Project]]&lt;br /&gt;
* [[Woodfibre LNG Export Terminal Project]]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===== Mexico ===== &lt;br /&gt;
* [[Amigo LNG Export Terminal]]&lt;br /&gt;
* [[Coatzacoalcos LNG Export Terminal]]&lt;br /&gt;
* [[Energia Costa Azul LNG Export Terminal]]&lt;br /&gt;
* [[Lakach FLNG Export Terminal]]&lt;br /&gt;
* [[Saguaro Energía LNG Export Terminal]]&lt;br /&gt;
* [[Salina Cruz LNG Export Terminal]]&lt;br /&gt;
* [[Vista Pacifico LNG Export Terminal]]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===== USA ===== &lt;br /&gt;
* [[Alaska South Central LNG Export Terminal Project]]&lt;br /&gt;
* [[Annova LNG Export Terminal Project]] - '''cancelled'''&lt;br /&gt;
* [[Argent LNG Export Terminal Project]]&lt;br /&gt;
* [[CP2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Commonwealth LNG Export Terminal Project]]&lt;br /&gt;
* [[Delfin LNG Export Terminal Project]],&lt;br /&gt;
* [[Fourchon LNG Export Terminal Project]],&lt;br /&gt;
* [[G2 LNG Export Terminal Project]]&lt;br /&gt;
* [[Golden Pass LNG Export Terminal Project]]&lt;br /&gt;
* [[Gulf LNG Export Terminal Project]]&lt;br /&gt;
* [[Jordan Cove LNG Export Terminal Project]]&lt;br /&gt;
* [[Magnolia LNG Export Terminal Project]]&lt;br /&gt;
* [[Main Pass Energy Hub Export Terminal Project]]&lt;br /&gt;
* [[Mississippi Louisiana LNG Export Terminal Project]]&lt;br /&gt;
* [[Monkey Island LNG Export Terminal Project]], LA&lt;br /&gt;
* [[Port Arthur LNG Export Terminal Project]]&lt;br /&gt;
* [[Port Lavaca Floating LNG Export Terminal Project]]&lt;br /&gt;
* [[Port of Brownsville LNG Export Terminal Project]]&lt;br /&gt;
* [[Rio Grande Export Terminal LNG Project]]&lt;br /&gt;
* [[South Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Texas LNG Export Terminal Project]]&lt;br /&gt;
* [[Trunkline Lake Charles LNG Export Terminal Project]] / [[Lake Charles LNG Export Terminal Project]]&lt;br /&gt;
* [[Warrenton Oregon LNG Export Terminal]]&lt;br /&gt;
* [[Woodside Louisiana LNG Export Terminal Project]],&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76584</id>
		<title>Kitimat LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76584"/>
		<updated>2026-01-24T14:59:08Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Kitimat LNG (Apache / Chevron)&lt;br /&gt;
* Website: http://www.kitimatlngfacility.com/&lt;br /&gt;
* Location: Bish Cove near the Port of Kitimat, BC, Canada  &lt;br /&gt;
* Capacity: 3.5-5.0 million tons/annum &lt;br /&gt;
* Status: Cancelled&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Kitimat LNG Terminal is a liquefaction and export facility&lt;br /&gt;
* Kitimat LNG Terminal will include marine on-loading, LNG storage, natural gas delivery, liquefaction and LNG send-out facilities. &lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: Two 210,000 m3 LNG storage tanks (approximately 8.9 Bcf of natural gas) with potential future expansion to three tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
** '''KBR:''' Front End Engineering and Design (FEED) &lt;br /&gt;
** '''Fluor / JGC:''''' Engineering, procurement and construction (EPC)&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Kitimat LNG Inc. expects to the FID for Kitimat LNG Terminal train 1 in 2012,&lt;br /&gt;
* Commercial operation beginning at the end of [[Lng Terminals To Be Completed In 2016 | 2016]]&lt;br /&gt;
* Kitimat LNG received its Provincial Environmental Certificate for the liquefaction terminal in December 2008 and the Federal Environmental Certificate in January 2009.&lt;br /&gt;
* the FEED for the project has been awarded in March 2011&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: The terminal will take delivery of gas via a pipeline lateral, approximately 15 kilometres long, from the [[Pacific Trail Gas Pipelines]], which will be connected to the existing Spectra Energy’s [[West Coast Energy Gas Pipeline]]. &lt;br /&gt;
* Customers: &lt;br /&gt;
** The terminal offers a short route to important Asian customers&lt;br /&gt;
** Gas Natural, based in Spain, had tentatively agreed to buy 30% of the production from the terminal, while Korea Gas Corp had expressed interest in an additional 40%. However, these are MOUs, not purchase agreements&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2006 - Kitimat LNG Terminal received its environmental assessment certificate from the BC Environmental Assessment Agency and was granted federal environmental approval for a regasification terminal.&lt;br /&gt;
* 2008 - Kitimat LNG received its Provincial Environmental Certificate&lt;br /&gt;
* 2009 - Kitimat LNG received its Federal Environmental Certificate&lt;br /&gt;
* 2011 - The National Energy Board (NEB or the Board) announced that it will hold a public hearing to consider an application submitted by KM LNG Operating General Partnership (KM LNG) for a 20-year licence to export natural gas in the form of liquefied natural gas (LNG).&lt;br /&gt;
* 2011 - Kitimat LNG partners awarded KBR the Front End Engineering and Design (FEED) contract for the facility&lt;br /&gt;
* 2011 - Encana acquires a 30% interest in the project&lt;br /&gt;
* 2011 - The National Energy Board grants a 20 year export licence to the project&lt;br /&gt;
* 2012 - Chevron acquires Encana &amp;amp; EOG's share of the project&lt;br /&gt;
* 2013 - Chevron acquisition completed&lt;br /&gt;
* 2014 - Fluor and JGC Awarded EPC Contract&lt;br /&gt;
* 2014 - Apache announces sale of stake to Woodside&lt;br /&gt;
* 2019 - Chevron paused the project&lt;br /&gt;
* 2021 - Chevron cancelled the project&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* The terminal was originally conceived of as a regasification terminal.&lt;br /&gt;
* If completed it will be Canada's first LNG export terminal&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
&lt;br /&gt;
# [http://www.cjfw.ca/News/Story.aspx?ID=1314794 Haisla Members Approve LNG Lease]&lt;br /&gt;
# [http://a100.gov.bc.ca/appsdata/epic/documents/p244/1137189645610_5f08234ed4754316b54f925e36601e44.pdf Kitimat LNG Terminal Project Update]&lt;br /&gt;
# [http://www.calgarysun.com/money/2010/12/10/16507766.html Kitimat LNG files application to export gas, still looking for buyers]&lt;br /&gt;
# [[[JGC LNG Tank References]]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:500 Hearing Scheduled to Consider Application for License to Export Liquefied Natural Gas] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:598 KITIMAT LNG PARTNERS AWARD KBR THE FEED CONTRACT FOR LNG PROJECT]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:646 Encana to acquire 30 percent interest in proposed Kitimat, B.C. liquefied natural gas export development]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1053 Kitimat LNG To Purchase Eurocan Industrial Site]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1427 NEB grants 20-year export licence to KM LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3631 Chevron Subsidiary Acquires Operating Interest in Western Canada LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3823 Apache, Chevron Complete Chevron Canada's Entry Into Kitimat LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4880 Fluor and JGC Awarded EPC Contract for Kitimat LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5646 Apache Corporation announces the sale of Wheatstone and Kitimat LNG projects to Woodside Petroleum Limited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5831 Apache Completes Sale Of Kitimat LNG]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/chevron-canada-limited-to-exit-proposed.html chevron Canada limited to exit the proposed kitimat LNG project]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76583</id>
		<title>Kitimat LNG Terminal</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Kitimat_LNG_Terminal&amp;diff=76583"/>
		<updated>2026-01-24T14:54:20Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
&lt;br /&gt;
* Ownership: Kitimat LNG (Apache / Chevron)&lt;br /&gt;
* Website: http://www.kitimatlngfacility.com/&lt;br /&gt;
* Location: Bish Cove near the Port of Kitimat, BC, Canada  &lt;br /&gt;
* Capacity: 3.5-5.0 million tons/annum &lt;br /&gt;
* Status: Planned&lt;br /&gt;
&lt;br /&gt;
=== Brief Description ===&lt;br /&gt;
* The Kitimat LNG Terminal is a liquefaction and export facility&lt;br /&gt;
* Kitimat LNG Terminal will include marine on-loading, LNG storage, natural gas delivery, liquefaction and LNG send-out facilities. &lt;br /&gt;
&lt;br /&gt;
=== Technical Details ===&lt;br /&gt;
* Storage capacity: Two 210,000 m3 LNG storage tanks (approximately 8.9 Bcf of natural gas) with potential future expansion to three tanks&lt;br /&gt;
* Constructor:&lt;br /&gt;
** '''KBR:''' Front End Engineering and Design (FEED) &lt;br /&gt;
** '''Fluor / JGC:''''' Engineering, procurement and construction (EPC)&lt;br /&gt;
* Licensor:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Ongoing Projects/Project Status ===&lt;br /&gt;
* Kitimat LNG Inc. expects to the FID for Kitimat LNG Terminal train 1 in 2012,&lt;br /&gt;
* Commercial operation beginning at the end of [[Lng Terminals To Be Completed In 2016 | 2016]]&lt;br /&gt;
* Kitimat LNG received its Provincial Environmental Certificate for the liquefaction terminal in December 2008 and the Federal Environmental Certificate in January 2009.&lt;br /&gt;
* the FEED for the project has been awarded in March 2011&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Suppliers / Customers ===&lt;br /&gt;
* Suppliers: The terminal will take delivery of gas via a pipeline lateral, approximately 15 kilometres long, from the [[Pacific Trail Gas Pipelines]], which will be connected to the existing Spectra Energy’s [[West Coast Energy Gas Pipeline]]. &lt;br /&gt;
* Customers: &lt;br /&gt;
** The terminal offers a short route to important Asian customers&lt;br /&gt;
** Gas Natural, based in Spain, had tentatively agreed to buy 30% of the production from the terminal, while Korea Gas Corp had expressed interest in an additional 40%. However, these are MOUs, not purchase agreements&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2006 - Kitimat LNG Terminal received its environmental assessment certificate from the BC Environmental Assessment Agency and was granted federal environmental approval for a regasification terminal.&lt;br /&gt;
* 2008 - Kitimat LNG received its Provincial Environmental Certificate&lt;br /&gt;
* 2009 - Kitimat LNG received its Federal Environmental Certificate&lt;br /&gt;
* 2011 - The National Energy Board (NEB or the Board) announced that it will hold a public hearing to consider an application submitted by KM LNG Operating General Partnership (KM LNG) for a 20-year licence to export natural gas in the form of liquefied natural gas (LNG).&lt;br /&gt;
* 2011 - Kitimat LNG partners awarded KBR the Front End Engineering and Design (FEED) contract for the facility&lt;br /&gt;
* 2011 - Encana acquires a 30% interest in the project&lt;br /&gt;
* 2011 - The National Energy Board grants a 20 year export licence to the project&lt;br /&gt;
* 2012 - Chevron acquires Encana &amp;amp; EOG's share of the project&lt;br /&gt;
* 2013 - Chevron acquisition completed&lt;br /&gt;
* 2014 - Fluor and JGC Awarded EPC Contract&lt;br /&gt;
* 2014 - Apache announces sale of stake to Woodside&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Other Information ===&lt;br /&gt;
* The terminal was originally concieved of as a regasification terminal.&lt;br /&gt;
* If completed it will be Canada's first LNG export terminal&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
&lt;br /&gt;
# [http://www.cjfw.ca/News/Story.aspx?ID=1314794 Haisla Members Approve LNG Lease]&lt;br /&gt;
# [http://a100.gov.bc.ca/appsdata/epic/documents/p244/1137189645610_5f08234ed4754316b54f925e36601e44.pdf Kitimat LNG Terminal Project Update]&lt;br /&gt;
# [http://www.calgarysun.com/money/2010/12/10/16507766.html Kitimat LNG files application to export gas, still looking for buyers]&lt;br /&gt;
# [[[JGC LNG Tank References]]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:500 Hearing Scheduled to Consider Application for License to Export Liquefied Natural Gas] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:598 KITIMAT LNG PARTNERS AWARD KBR THE FEED CONTRACT FOR LNG PROJECT]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:646 Encana to acquire 30 percent interest in proposed Kitimat, B.C. liquefied natural gas export development]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1053 Kitimat LNG To Purchase Eurocan Industrial Site]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1427 NEB grants 20-year export licence to KM LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3631 Chevron Subsidiary Acquires Operating Interest in Western Canada LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3823 Apache, Chevron Complete Chevron Canada's Entry Into Kitimat LNG]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:4880 Fluor and JGC Awarded EPC Contract for Kitimat LNG Project]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5646 Apache Corporation announces the sale of Wheatstone and Kitimat LNG projects to Woodside Petroleum Limited]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:5831 Apache Completes Sale Of Kitimat LNG]&lt;br /&gt;
&lt;br /&gt;
[[category:LNG]]&lt;br /&gt;
[[category:Canada]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Leviathan_Gas_Field&amp;diff=76582</id>
		<title>Leviathan Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Leviathan_Gas_Field&amp;diff=76582"/>
		<updated>2026-01-23T17:13:11Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Summary Information */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Chevron&lt;br /&gt;
* Country: Israel&lt;br /&gt;
* Location: Levantine basin&lt;br /&gt;
* Production start: 2019&lt;br /&gt;
* Partners: Chevron Mediterranean Limited as operator (39.66%), NewMed Energy (45.34%), and Ratio Energies (15%). &lt;br /&gt;
* Type: Gas&lt;br /&gt;
* Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet&lt;br /&gt;
* Production Volume:&lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid.&lt;br /&gt;
* Gas is supplied to Jordan and Egypt as well as Israel&lt;br /&gt;
* An expansion project is under way that includes drilling three additional offshore wells, adding additional subsea infrastructure, and enhancing the treatment facilities on the Leviathan production platform. This will increase capacity to deliver approximately 21 billion cubic meters (BCM) annually&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* **CIT:** Project management and conceptual engineering&lt;br /&gt;
* **Aker Solutions:** Hydrate Inhibition FEED&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2010 - Noble Energy Announces Significant Discovery at Leviathan&lt;br /&gt;
* 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet&lt;br /&gt;
* 2017 - Final investment decision&lt;br /&gt;
* 2019 - First gas produced&lt;br /&gt;
* 2020 - Chevron acquires Noble Energy&lt;br /&gt;
* 2026 - FID for expansion project&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* Noble encountered 220 feet (67 meters) of net natural gas pay in several subsalt Miocene intervals.&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [[Aker Solutions Hydrate Inhibition References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1783 Noble Energy Announces Successful Leviathan Appraisal Results and Increases Resource Size] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2472 Noble Energy Provides Update On Leviathan Deep]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:326 Noble Energy Announces Significant Discovery at Leviathan Offshore Israel] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3926 Noble Energy Announces Increase In Leviathan Resource Estimate]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2023/03/chevron-announces-agreement-to-acquire.html Chevron Announces Agreement to Acquire Noble Energy]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2023/03/commencement-of-piping-of-natural-gas.html Commencement of the piping of natural gas from the Leviathan reservoir]&lt;br /&gt;
# [https://a-barrel-full.blogspot.com/2026/01/chevron-takes-final-investment-decision.html Chevron takes Final Investment Decision on Leviathan gas expansion]&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:Israel]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Leviathan_Gas_Field&amp;diff=76581</id>
		<title>Leviathan Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Leviathan_Gas_Field&amp;diff=76581"/>
		<updated>2026-01-23T17:12:50Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Chevron&lt;br /&gt;
* Country: Israel&lt;br /&gt;
* Location: Levantine basin&lt;br /&gt;
* Production start: &lt;br /&gt;
* Partners: Chevron Mediterranean Limited as operator (39.66%), NewMed Energy (45.34%), and Ratio Energies (15%). &lt;br /&gt;
* Type: Gas&lt;br /&gt;
* Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet&lt;br /&gt;
* Production Volume:&lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid.&lt;br /&gt;
* Gas is supplied to Jordan and Egypt as well as Israel&lt;br /&gt;
* An expansion project is under way that includes drilling three additional offshore wells, adding additional subsea infrastructure, and enhancing the treatment facilities on the Leviathan production platform. This will increase capacity to deliver approximately 21 billion cubic meters (BCM) annually&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* **CIT:** Project management and conceptual engineering&lt;br /&gt;
* **Aker Solutions:** Hydrate Inhibition FEED&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2010 - Noble Energy Announces Significant Discovery at Leviathan&lt;br /&gt;
* 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet&lt;br /&gt;
* 2017 - Final investment decision&lt;br /&gt;
* 2019 - First gas produced&lt;br /&gt;
* 2020 - Chevron acquires Noble Energy&lt;br /&gt;
* 2026 - FID for expansion project&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* Noble encountered 220 feet (67 meters) of net natural gas pay in several subsalt Miocene intervals.&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [[Aker Solutions Hydrate Inhibition References]]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:1783 Noble Energy Announces Successful Leviathan Appraisal Results and Increases Resource Size] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:2472 Noble Energy Provides Update On Leviathan Deep]&lt;br /&gt;
# [http://killajoules.wikidot.com/blog:326 Noble Energy Announces Significant Discovery at Leviathan Offshore Israel] &lt;br /&gt;
# [http://killajoules.wikidot.com/blog:3926 Noble Energy Announces Increase In Leviathan Resource Estimate]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2023/03/chevron-announces-agreement-to-acquire.html Chevron Announces Agreement to Acquire Noble Energy]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2023/03/commencement-of-piping-of-natural-gas.html Commencement of the piping of natural gas from the Leviathan reservoir]&lt;br /&gt;
# [https://a-barrel-full.blogspot.com/2026/01/chevron-takes-final-investment-decision.html Chevron takes Final Investment Decision on Leviathan gas expansion]&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:Israel]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Tiber_and_Guadalupe_Oil_and_Gas_Fields&amp;diff=76580</id>
		<title>Tiber and Guadalupe Oil and Gas Fields</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Tiber_and_Guadalupe_Oil_and_Gas_Fields&amp;diff=76580"/>
		<updated>2026-01-23T17:07:25Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: /* Links */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: BP&lt;br /&gt;
* Country: USA&lt;br /&gt;
* Location: Keathley Canyon area about 300 miles southwest of New Orleans&lt;br /&gt;
* Production start: Expected 2030&lt;br /&gt;
* Partners: &lt;br /&gt;
* Type: Oil &amp;amp; Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume: &lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* Tiber-Guadalupe will be based on a new floating production platform with the capacity to produce 80,000 barrels of crude oil per day. &lt;br /&gt;
* The project includes six wells in the Tiber field and a two-well tieback from the Guadalupe field.&lt;br /&gt;
* The field is a very high pressure one&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* -&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2009 - BP discovered the Tiber field&lt;br /&gt;
* 2014 - BP discovered the Guadalupe field&lt;br /&gt;
* 2025 - BP made the final investment decision&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/bp-announces-oil-discovery-in-deepwater.html BP announces oil discovery in the Deepwater Gulf of Mexico]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/bp-approves-tiber-guadalupe-project-in.html BP approves Tiber-Guadalupe project in the US Gulf of America]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:USA]]&lt;br /&gt;
[[category:BP]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
	<entry>
		<id>http://www.abarrelfull.co.uk/index.php?title=Anchor_Oil_And_Gas_Field&amp;diff=76579</id>
		<title>Anchor Oil And Gas Field</title>
		<link rel="alternate" type="text/html" href="http://www.abarrelfull.co.uk/index.php?title=Anchor_Oil_And_Gas_Field&amp;diff=76579"/>
		<updated>2026-01-23T17:00:10Z</updated>

		<summary type="html">&lt;p&gt;Abarrelfull: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=== Summary Information ===&lt;br /&gt;
* Operator: Chevron&lt;br /&gt;
* Country: USA&lt;br /&gt;
* Location: Offshore Gulf of Mexico&lt;br /&gt;
* Production start: 2024&lt;br /&gt;
* Partners: Chevron &amp;amp; Totalenergies&lt;br /&gt;
* Type: Oil &amp;amp; Gas&lt;br /&gt;
* Estimated Reserves: &lt;br /&gt;
* Production Volume:&lt;br /&gt;
&lt;br /&gt;
=== Description ===&lt;br /&gt;
* Located 225 kilometers off the Louisiana coast, Anchor consists of a system of subsea wells connected to a semi-submersible floating production unit (FPU) with a production capacity of 75,000 barrels of oil per day and 28 million cubic feet of gas per day.&lt;br /&gt;
* Anchor was the first development to use the high-pressure 20,000-pounds-per-square-inch (20 kpsi) technologies&lt;br /&gt;
&lt;br /&gt;
=== Contractors ===&lt;br /&gt;
* '''WOOD:''' fully integrated engineering design for the project topsides and subsea systems incorporating risers, production flowlines, export pipelines and flow assurance analysis.&lt;br /&gt;
# '''KBR:''' FEED contract for the hull&lt;br /&gt;
# '''DSME:''' Construction of the FPU hull&lt;br /&gt;
# '''Kiewit:''' Construction of the topsides&lt;br /&gt;
# '''OneSubsea:''' contract to provide engineering and qualification for subsea equipment&lt;br /&gt;
&lt;br /&gt;
=== History ===&lt;br /&gt;
* 2015 - The Anchor field was discovered&lt;br /&gt;
* 2019 - Final investment decision taken&lt;br /&gt;
* 2024 - First production achieved&lt;br /&gt;
&lt;br /&gt;
=== Geology ===&lt;br /&gt;
* The appraisal well encountered 694 feet of net oil pay, a hydrocarbon column of at least 1,800 feet in the Lower Tertiary Wilcox reservoirs&lt;br /&gt;
&lt;br /&gt;
=== Links ===&lt;br /&gt;
# [https://www.woodplc.com/solutions/case-studies/chevron-anchor Chevron Anchor Case Study]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/venari-resources-announces-successful.html Venari Resources Announces Successful Results From The Anchor Appraisal Well In The Deepwater Gulf Of Mexico]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/total-moves-forward-on-two-deepwater.html Total Moves Forward on Two Deepwater Projects in the U.S. Gulf of Mexico]&lt;br /&gt;
# [https://abarrelfull.blogspot.com/2026/01/chevron-starts-production-at-anchor.html chevron starts production at anchor with industry-first deepwater technology]&lt;br /&gt;
&lt;br /&gt;
[[category:Field]]&lt;br /&gt;
[[category:USA]]&lt;br /&gt;
[[category:Chevron]]&lt;/div&gt;</summary>
		<author><name>Abarrelfull</name></author>
		
	</entry>
</feed>